Download presentation
Presentation is loading. Please wait.
1
Click here for the LIVE WEBCAM
September 22nd 2017 Bioscience Research Laboratories University of Arizona + DPR Construction CURRENT Activities FUN FACT The Center for Gamma-Ray Imaging Group, who will occupy space in the basement of the BSRL building, aims to develop advanced gamma-ray detectors and imaging systems, to push the limits of spatial and temporal resolution in SPECT and PET imaging, and to make state-of-the-art technology available to collaborators and the biomedical research community. Courtyard hardscape, West elevation metal panels, South masonry and loading dock brick wash down are ongoing. Gamma Ray Imaging Suite drywall taping is ongoing and Keating wall framing is near completion. 1st floor Café flooring has started, lobby ceiling trim began and final cleaning underway in OMICS Lab. 2nd floor marker board lights, tack panels and stretched fabric wall panels are ongoing. 3rd floor south labs nearing final cleaning, flooring and mobile casework ongoing at north. 4th floor wood millwork installation is ongoing and final prep for flooring. Click here for the LIVE WEBCAM
2
Corten Planter Walls at Breezeway 1st Floor OMICS Lab Mobile Benches
Bioscience Research Laboratories University of Arizona + DPR Construction Corten Planter Walls at Breezeway 1st Floor OMICS Lab Mobile Benches 7T MRI Areaway West of Building Bathroom Accessories and Fixtures
3
Conference Room Stretched Fabric Panel Elevator Lobby Tile Level 4
Bioscience Research Laboratories University of Arizona + DPR Construction Conference Room Stretched Fabric Panel Elevator Lobby Tile Level 4 1st Floor Wood Ceiling Border Bathroom Partitions 3rd Level Bathrooms
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.