Download presentation
Presentation is loading. Please wait.
1
Board Work Session April 10, 2017
2
The VISION of the Vigo County School Corporation is to ensure that our three comprehensive high schools meet the needs of students and staff of today and into the future
3
VISION With this vision guiding all study efforts, participants embarked on a journey of investigation, analysis and discovery to make this vision a reality. Study Definition Data Gathering Analysis Condition Assessment Update Recommendations
4
CURRENT FACILITY FINDINGS
Challenged to support 21st Century Educational Programs and Curriculum Delivery Inadequate Capacity Over Utilization limiting flexibility Below Benchmarks for other similar Indiana HS Facilities Overall Condition is unsatisfactory
5
Most high-performing Indiana high schools undergo:
RECOMMENDATIONS Most high-performing Indiana high schools undergo: Major remodeling at 15-year intervals Major renovations at 25 to 30-year intervals
6
RECOMMENDATIONS The Feasibility Study findings indicate that a significant facility improvement initiative for these three high schools and West Vigo Middle School is warranted
7
ADDITIONS/RENOVATIONS CONCEPT
8
RECONSTRUCTION CONCEPT
9
NEW CONSTRUCTION CONCEPT
10
ADDITIONS/RENOVATIONS CONCEPT
11
RECONSTRUCTION CONCEPT
12
NEW CONSTRUCTION OPTION
13
ADDITIONS/RENOVATIONS CONCEPT
14
RECONSTRUCTION CONCEPT
16
Qualities that will be improved with each concept:
CONCEPT COMPARISON Safety and security Environmental comfort Flexible learning spaces Access to technology Lower energy costs Qualities that will be improved with each concept:
17
For each high school, the cost of each concept from low to high is:
CONCEPT COMPARISON For each high school, the cost of each concept from low to high is: Additions/Renovations Reconstruction New Construction
18
Qualities that can vary in the level of success by concept:
CONCEPT COMPARISON Qualities that can vary in the level of success by concept: Responsiveness to 21 Century Education Overall site circulation and management Program disruption during construction Construction schedule duration
19
CONCEPT COMPARISON
20
CONCEPT COMPARISON
21
CONCEPT COMPARISON
22
Board Work Session April 10, 2017
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.