1 SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board
April 11, 2017

2 Capital Projects Purchasing Items
California Environmental Quality Act Dudek (Encinitas, CA) GHD (Santa Rosa, CA) LSA Associates, Inc. (Berkeley, CA) Rincon Consultants, Inc. (Ventura, CA) Bid Award Items: Lark Temporaries – Permission to bid and award if bid is below $700,000 Analy Village Swing Space Project – Permission to bid and award if bid is below $500,000 Both projects support the Burbank Swing Space project and will be utilized as swing space for later projects

3 Measure H – Recent Activity
Citizen’s Bond Oversight Committee (CBOC) Meeting Monday, April 10, 2017 New Projects Update STEM lab planning phase KAD programming phase Modular construction research

4 STEM Lab Planner – Research Facility Design
Programming for STEM project highlights Santa Rosa & Petaluma Chemistry Lab coordination Four (4) sets of meetings with STEM faculty from various departments Samples of Work Product Organic Chemistry Lab – Concept options A through C (not final)

5 STEM Lab Planner: Research Facility Design
Selected by Measure H selection committee consisting of: 1 student 1 board member 2 faculty 2 classified staff 2 managers Programming for STEM project highlights: Meetings with STEM faculty from various departments Coordination between SR Chemistry Labs & Petaluma Chemistry Lab SAMPLE ONLY

6 STEM Lab Planner: Research Facility Design
Selected by Measure H selection committee consisting of: 1 student 1 board member 2 faculty 2 classified staff 2 managers Programming for STEM project highlights: Meetings with STEM faculty from various departments Coordination between SR Chemistry Labs & Petaluma Chemistry Lab SAMPLE ONLY

7 STEM Lab Planner: Research Facility Design
Selected by Measure H selection committee consisting of: 1 student 1 board member 2 faculty 2 classified staff 2 managers Programming for STEM project highlights: Meetings with STEM faculty from various departments Coordination between SR Chemistry Labs & Petaluma Chemistry Lab SAMPLE ONLY

8 KAD Field Planner – Verde Design
Exterior field planning for KAD programming Track layout Pool program (including new 50 – 52m pool) Fieldturf replacement in multi-field area Coordination with KAD building program Programming services – Gensler Cost estimate for programming phase – Establish priorities Building architect selection using Measure H process – Summer Samples of Work Product Field and pool concept diagrams (not final)

9 KAD Field Planner: Verde Design
Specialty Planner for KAD exterior fields Recommend design for track layout Recommend design for multi-purpose field renovation Recommend strategy for pool areas, including 50 – 52 meter pool Recommend strategy for Fieldturf replacement Work will be coordinated with KAD building programmer Gensler selected to program KAD facility Architect selection process will commence in summer with Measure H committee Project delivery method in discussion Cost estimate at end of process will establish priorities SAMPLE ONLY

10 KAD Field Planner: Verde Design
Specialty Planner for KAD exterior fields Recommend design for track layout Recommend design for multi-purpose field renovation Recommend strategy for pool areas, including 50 – 52 meter pool Recommend strategy for Fieldturf replacement Work will be coordinated with KAD building programmer Gensler selected to program KAD facility Architect selection process will commence in summer with Measure H committee Project delivery method in discussion Cost estimate at end of process will establish priorities SAMPLE ONLY

11 Modular Construction – Product Research
Intent of the study – does modular construction… …include one and two story options? …deliver schedule and/or cost savings? …come with a DSA pre-approval stamp? …meet the District’s interior & exterior design quality standard? Modular is not appropriate for all projects, but is there a place for modular construction in the Measure H program? Possible options: SW Center – Classrooms and Student Services? PSTC – Multi-purpose Room? Shone Farm – Laboratory or Classroom? Santa Rosa – Classroom building (interior of campus only) or long term swing space? Samples of Work Product Team is reviewing multiple vendors and products

12 Modular Construction Research
Intent of the study – modular construction: Schedule and cost savings Many products come with DSA pre-approval stamp Meets classroom & exterior design quality standard at each site Research includes one and two story options Are appropriate solutions available? SW Center – Possible classroom solution PSTC – Possible solution for MPR Shone Farm – Possible solution for laboratory and classroom Santa Rosa – Possible solution for building on interior of campus only Santa Rosa – Possible solution for long term swing space SAMPLE ONLY

13 Modular Construction Research
Intent of the study – modular construction: Schedule and cost savings Many products come with DSA pre-approval stamp Meets classroom & exterior design quality standard at each site Research includes one and two story options Are appropriate solutions available? SW Center – Possible classroom solution PSTC – Possible solution for MPR Shone Farm – Possible solution for laboratory and classroom Santa Rosa – Possible solution for building on interior of campus only Santa Rosa – Possible solution for long term swing space SAMPLE ONLY

14 Modular Construction Research
SAMPLE ONLY

15 Modular Construction Research
Intent of the study – modular construction: Schedule and cost savings Many products come with DSA pre-approval stamp Meets classroom & exterior design quality standard at each site Research includes one and two story options Are appropriate solutions available? SW Center – Possible classroom solution PSTC – Possible solution for MPR Shone Farm – Possible solution for laboratory and classroom Santa Rosa – Possible solution for building on interior of campus only Santa Rosa – Possible solution for long term swing space SAMPLE ONLY

16 QUESTIONS?


Download ppt "SONOMA COUNTY JUNIOR COLLEGE DISTRICT Measure H update for the Governing Board April 11, 2017."