Download presentation
Presentation is loading. Please wait.
Published bySharleen Price Modified over 7 years ago
1
GARDEN PARK ESTATES Traffic Calming Circle Modifications February 7, 2013
Presented By: Ricky Templet, Jefferson Parish Councilman District 1
2
Calming Circle Prior to Sign Installation
3
Traffic Calming Circle Today
4
Circle Modification – Alternate #1
Features: Existing sign location to be relocated to lot side of roadway Yellow = New roadway paving Green = New expanded green space due to removal of pavement around existing circle Blue = Driveway modification Minor drainage modifications include one new catch basins at new curb
5
Circle Modification – Alternate #2
Features: Existing sign location to remain Yellow = New roadway/sidewalk paving Green = New expanded green space Blue = Driveway modification Drainage modifications include four new catch basins at new curb
6
GARDEN PARK ESTATES Traffic Calming Circle Modifications
QUESTIONS AND COMMENTS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.