NECSAS Annual Report SECO 2004 Annual Conference

Similar presentations


Presentation on theme: "NECSAS Annual Report SECO 2004 Annual Conference"— Presentation transcript:

1 NECSAS Annual Report SECO 2004 Annual Conference
November 17, 2004 Thanh Minh Trinh, P.E NECSAS Program Manager Rob Klawitter, C.S.P. NECSAS Contractor from E2M

2 Where have we been? Trends Recent Development What to expect in FY05 Q & A

3 Where have we been? Program launched in 1999.
Piloted in 2000 – Oklahoma and Alaska 2001 marked the first year of rolling out the program Tier 1 Assessments - 72 facilities to date. Tier 2 Assessments – 38 Facilities (only 2 in FY04) Numerous assistance site visits (e.g., before or after Tier 1). Identified 925 findings total: a) Closed – 605; b) In-progress of Closing – 237; c) Open - 83

4 Where have we been?

5 Trend:

6 Trend: Note on Class 1, 2, 3 and LO

7 Trend:

8

9 Trend: 2001 – 2004 NECSAS Summary
Year Zone Environmental Safety Total Finding % 2001 CA, HI, GU 20 14% 120 86% 140 2002 TX, LA, FL 25 16% 135 84% 160 2003 DC, MD, CO, MO, AK, PA, NJ, SC 47 15% 277 85% 324 2004 (Draft) IN, MI, IL, OH, WA, OR, MD, VA, NC 69 23% 232 77% 301 Net Overall 161 17% 764 83% 925

10 Trend:

11 Trend: Evolution of Top Fives Top 5 Finding Protocols - Safety
2001 2002 2003 Draft Electrical Safety Work Practices Walking/Working Surfaces Means of Egress Fire Protection Injuries/Illness Log Occupational Noise Machinery/Machine Safeguarding Hazard Communication Materials Handling Trend: Evolution of Top Fives" (Subtitle: "Ranked Top 5 Finding Protocols - Safety"); "Trend: Evolution... Environmental"

12 Trend: Evolution of Top Fives Top 5 Finding Protocols – Environmental
2001 2002 2003 Draft Hazardous Waste Mgmt Petroleum, Oil, Lubricants Mgmt Hazardous Materials Mgmt Storage Tank Mgmt Asbestos Mgmt Solid Waste Mgmt Wastewater Mgmt PCB Mgmt Water Quality Mgmt

13 Trend: NOAA's Shift to EMS and SEMS
Let’s look at the root cause of our findings. We use the MERT system: M – Management E – External Force R – Resource T - Training A program in its infancy (Development) stage could expect most root causes to fall within the Management Emphasis grouping. As the program matures(or in the Implementation stage), the root cause trend should gradually shift toward Resource and Training Ultimately, the program reaches “Sustainment” when all root causes are attributed to External Force.

14 Trend: Shifting to EMS & SEMS

15 Trend: Shifting to EMS & SEMS

16 Trend: Shifting to EMS & SEMS

17 Recent Developments NECSAS team met in May of 2004
Tier 2 rules and process were developed Updated WHAM to address: Access, LOCAP comment, and changing finding status WHAM web based and CD training for WHAM users In the process of evaluating tablet PC to conduct assessments. Tier 3 Questionnaires & VFA integration.

18 Tier II Business Rule Discussion Points
Recent Developments Tier II Business Rule Discussion Points Who will conduct Tier II’s? RECO/RSM What type of QA process will be used if any? NECSAS PM/Contractor PM ensure proper naming of database/photos prior to upload. No other formal QA process prior to upload. Who will upload to WHAM? NECSAS PM/Contractor PM Will there be a review of findings on WHAM? Facility Manager and LECO will have 14-days to review Tier II findings following upload to WHAM Track findings to closure? Yes. LECO, in conjunction with facility manager, will use existing LOCAP function.

19 Tier II Business Rule Discussion Points - Continued
Recent Developments Tier II Business Rule Discussion Points - Continued Definition of a repeat finding? Would Tier II finding be repeat if identified during a Tier I, and vise versa? A previously identified finding is again identified during a subsequent Tier I or Tier II assessment. Assessor(s) will only use the previous assessment in evaluating the existence of a repeat finding. Time frame for completion of Database and upload to WHAM following completion of site visit? RECO/RSM Team has 30-business days to complete the development of Draft Tier II database. Training on the process? NECSAS group recommended funding a three day training class by reducing the number of required Tier II assessment in FY 04. Training would be provided to all RECO/RSM’s and others (new LECO’s/CECO’s etc)

20 Recent Developments

21 Recent Developments Quick Review

22 VFA Top Level Facility Summary Screen
Recent Developments VFA Top Level Facility Summary Screen

23 Recent Developments Tier III Questionnaires
Safety & Environmental Compliance

24 What to expect in FY05 Perpetual Calendar FY 00/04/08… (I/V/IX...)
(II/VI/X…) FY 02/06/10… (III/VII/XI…) FY 03/07/11… (IV/VIII/XII…) DC/MD/VA3 CA8 AL/FL/GA4 AK10 IL/IN/OH5 CT/MA/RI1b LA/MS/TX6 CO MI GU11 SC DE/NJ/PA2 NC HI11 MO/OK7 OR/WA9 ME/NH/VT1a

25 What to expect in FY05 See attached spreadsheet
This list was ed to all LECO, RECO, and RSM on 10/14/04. Tier I Site Selection – Nominate your facilities. Our FY05 NOAA target is 25 to 30 facilities. Tier II Site Selection – Coordination between LECO and RECO/RSM. Tier II will not take place until after the RECO/RSM have received training. Tier III questionnaires.

26 QUESTIONS?