Presentation is loading. Please wait.

Presentation is loading. Please wait.

West Melbourne Lease Requirements

Similar presentations


Presentation on theme: "West Melbourne Lease Requirements"— Presentation transcript:

1 West Melbourne Lease Requirements
CICCC 12 March 2009

2 Stage 1by 2004 (Complete) New Vapour Emission Control System (Combustor) Upgrade Acrylate Storage Tanks (10 tanks) to have: Under tank liner for leak detection New dock lines and hard piped exchange areas Sealed truck loading systems and cast steel pumps with double mechanical seals High pressure alarms

3 Stage 2 by 2008 50% of flammable/hazardous tanks to have: (60% actually done) Tank renovations including foundations where required (16 tanks) Under tank liner for leak detection (16 tanks) Hard piped exchange areas (all complete) New piping systems, cast steel pumps and sealed truck loading systems (all complete) High pressure alarms (all complete)

4 Stage 3 by 2012 Remaining 50% of flammable/hazardous tanks to have:
Tank renovations including foundations where required Under tank liner for leak detection Hard piped exchange areas New piping systems, cast steel pumps and sealed truck loading systems High pressure alarms Installation of impermeable liner to tank bunds and bund walls (Plant C done)

5 Plans for 2009 Tank renovations and under tank liner for leak detection for 3 tanks (1 done already) Install new fill lines to all remaining tanks Remove existing carbon beds and replace with static carbon bed Replace old boilers unmanned system


Download ppt "West Melbourne Lease Requirements"

Similar presentations


Ads by Google