TriFuel Alternative Fueling Stations
Creating Small Scale Markets for Natural Gas Introducing TriFuel Alternative Fueling Stations CNG/LNG/EV Save 70%+ Off Capital Costs!!
2
Each Station Supplied with LNG via Truck Delivery
No external storage tanks - Only electrical hookup required DC Fast Charger
3
- Modular - Re-Deployable - Expandable 1,500 LNG Gallons
Dispensing 7 GGE per minute Dispensing 16 gallons per minute EV Fast Charging in 30 minutes or less - Modular - Re-Deployable - Expandable 1,500 LNG Gallons Integrate Storage DC Fast Charger
4
Supply up to 6 TriFuel Stations
Create a Self-Sufficient LNG/CNG Corridor 2 1 3 LNG 5 4
5
CRYOBOX Technologies 9,500 LNG g per day Modular Transportable
Scaleable LNG Production
6
The World’s First CryoBox - Patagonia LCNG Fuel Station Network
Introducing Galileo Tech - Patagonia Modular LCNG Station World’s First Installation Internal Tanks Hold 1,000 GGE Gallons The World’s First CryoBox - Patagonia LCNG Fuel Station Network (Along I80 in Pennsylvania in 2017)
7
1,500 LNG Gallons Integrate Storage
1 CryoBox produces 9,500 LNG g per day (674 mmbtu per day) 1 TriFuel Station has 1,500 LNG g of internal storage (106 mmbtu) With external storage, each station can fuel at more than 16 g per minute or more than 15,000 LNG g/1,050 mmbtu per day. 1,500 LNG Gallons Integrate Storage
8
installed on a prepared site
TriFuel Station CAPX - $700,000 installed on a prepared site Traditional CNG + LNG + EV Charging on a prepared site = CNG $1.2 million LNG $2 million EV Charging $100,000+ $3.3 million +
9
Quickly Open New Markets
Quick Instal Minimal Site Work No Gas Pipeline Required Quickly Open New Markets
10
Provide cost effective alternatives to conventional fueling
Production capacity of the first CryoBox LNG unit is already sold out. The deployment of the TriFuel Station concept would be supplied by LNG production from Unit #2. MARKETS FOR LNG & CNG HAVE TO BE CREATED Provide cost effective alternatives to conventional fueling THE NUMBERS MUST WORK Remove barriers for adoption Dramatically reduce capital costs Provide equipment leases Provide all in per gallon pricing Identify stranded markets garbage truck fleets without access to a gas pipeline to their site - Provide flexible fueling (CNG/LNG)
11
MARKETS FOR LNG & CNG HAVE TO BE CREATED
THE NUMBERS MUST WORK Remove barriers for adoption Dramatically reduce capital costs Provide equipment leases Provide all in per gallon pricing - Provide flexible fueling (CNG/LNG/EV) Stranded Markets…sites lacking a natural gas pipeline connection (LNG is produced from stranded gas and delivered by truck) Stranded Gas Fields at which LNG can be produced using the Galileo CryoBox and trucked to Tri-Fuel stations. Smaller markets - Rural markets Small to medium businesses & municipalities Developers with limited capital
12
Reliance upon government grants to make projects viable
OVERCOME NEW MARKET OBSTACLES: - High entry level capital costs to provide alternative fueling infrastructure High risk to capital in a slow developing or unpredictable market demand growth for alternative fueling Reliance upon government grants to make projects viable No access or expensive access to natural gas pipeline connection. - No viable options to open a wide region to alternative fueling in a systematic way, economic way For a Full Presentation and Detailed Proposal Contact Perry Babb Fleet Energy America, State College, Pa.
13
3 in 1 - Modular Alternative Energy Station CNG/LNG & EV Charging
Save 70%+ Off Conventional Capital Costs!! - Compressed Natural Gas - Liquified Natural Gas - Electric Vehicle Charging