Environmental Cleanup Program Status
Glen Shonkwiler U. S Army Space and Missile Defense Command Environmental Division 29 Apr 2015 Fort Greely Restoration Advisory Board
2
FGA Installation Restoration Program Reports/Workplans
Following new reports now on RAB website (since last RAB meeting) Final 2013 IRP Annual Report 2013 SM-1A Environmental Surveillance Report Final South Tank Farm Remedial Investigation/Feasibility Study (RI/FS) Report 2014 Draft Groundwater Monitoring and Data Analysis Report After Action Report (AAR) for Munitions and Explosives of Concern (MEC) Removal Action for BRAC Site 112 AAR for MEC Removal Action for WWII Tent Site and Jarvis Creek Munitions Burial Area Supplemental Site Investigation (SSI) Report for MEC at BRAC Site 112 SSI for MEC at WWII Tent Site and Jarvis Creek Munitions Burial Area Following reports to be on the RAB website in next few months: Regulator Draft RI/FS BRAC Site 94 (former Building 163) Final 2014 Groundwater Monitoring Report Revised Draft Proposed Plans and No Further Action Decision Documents for 51 IRP Sites 2014 SM-1A Environmental Surveillance Report USACE Five Year Review
3
MMRP Work Completed 2014 Cleared Jarvis Creek Munitions Burial Area of suspicious metallic subsurface anomaly (turned out to be empty metal box) Cleared subsurface metallic anomalies on lower quarter of WWII Tent Site Area. Found two additional point detonating fuzes. Cleared a portion of BRAC Site 112 Former Scrap Yard of subsurface metallic anomalies (found an AT-4 warhead)
4
FGA Installation Restoration Program
2015 Proposed work Former Bldg 163 Underground Storage Tank Farm (BRAC Site 94) Ozone Treatability Study halted in 2012 Army Environmental Command requesting a Monitored Natural Attenuation approach RI/FS at AEC for review Continue sampling of groundwater monitoring wells to monitor benzene (& other petroleum constituents) plume
5
FGA Installation Restoration Program
2015 Proposed work Former South Tank Farm Groundwater sampling at 9 monitoring wells and 5 supply wells to monitor Ethylene Dibromide (EDB) plume. Wellhead treatment of supply wells that have had historic EDB detections near or above safe drinking water limits (with confirmation sampling to confirm effectiveness) RI/FS revised and Final at ADEC for review Replacement well for MW-18 planned
6
FGA Installation Restoration Program
2015 Proposed Work Complete post-wide groundwater sampling as downgradient monitoring of contaminated sites Complete Proposed Plan & No Further Action Decision Documents for 51 sites Close unused wells Develop Land Use Controls and Long Term Maintenance Plan and implement the first year of maintenance
7
Military Munitions Response Program (MMRP)
WWII Tent Site – plan to clear the northern 30 acres of the site of Munitions and Explosives of Concern (MEC) Working under existing Explosives Safety Submission (ESS) approved by DOD Explosives Safety Board (DDESB). BRAC Site 112 Former Scrap Yard – plan to clear MEC from entire 7 acres of site
8
SM-1A Nuclear Reactor Characterization
US Army Corps of Engineers completed fieldwork for All-Hazards Assessment (AHA) during summer 2011 Final All-Hazards Assessment Report was completed in November 2014 Formulation of disposal options and cost estimates based on the findings of the AHA are being used to support decommissioning funding requests. Initiation of further formal decommissioning planning activities, including National Environmental Policy Act documentation, will only start after funding is secured. Sturgis MH-1A reactor currently being towed to Galveston TX for decommissioning. SM-1 (Fort Belvoir) planning contract awarded in SM-1A decommissioning would subsequently follow Sturgis and SM-1 decommissioning.
9
SM-1A Nuclear Reactor Complex Repair Work
SM-1A Deactivated Nuclear Power Plant Spent Fuel Pit Wall Reinforcement Project Alaska District completed SFP retaining wall and roof replacement design in Spring 2014 Additional information on encasement structure as-built design identified Summer 2014 New information revealed that the outer North/Northeast CMU walls are not structural Retaining wall part of project cancelled Wall crack grouting, painting, and roof replacement contracted through FTG DPW Work to be completed June-July 2015
10
FY 2015
11
FGA Installation Restoration Program Website
Restoration Advisory Board Website Administrative Record & Information Repository Historical Documents under Administrative Record Page or Information Repository RAB minutes, agenda, advertisements, presentations etc. Site Information Tab for reviewing documents pertaining to a particular site Site Fact Sheets