Download presentation
Presentation is loading. Please wait.
1
Instrumentation Power Supply - Agenda
Activity Estimated Time 1. Agenda 5 2. Learning Objectives 3. Plant Power Supply 50 BREAK 10 4. Unit Electrical Room 20 5. Uninterruptible Power Supply 30 6. Power Failure Scenarios 7. Summary and Wrap-Up 8. Test Review 9. Additional Activities 10. Lab Activities Slide 1 Instrumentation 2 – Session 12
2
Session 12 - Objectives Define terms associated with instrumentation power supply: automatic transfer switches battery and charger inverter emergency generator Explain the purpose of uninterruptible power supply (UPS) systems. Given a diagram, identify components in a UPS system: Slide 2 Instrumentation 2 – Session 12
3
Power Lines Slide 3 Instrumentation 2 – Session 12
4
Transformer Slide 4 Instrumentation 2 – Session 12
5
Plant Power Scheme Slide 5 Instrumentation 2 – Session 12
6
The Timetene Unit Slide 6 Instrumentation 2 – Session 12
7
Motor Control Center Slide 7 Instrumentation 2 – Session 12
8
The Timetene Unit (continued)
Slide 8 Instrumentation 2 – Session 12
9
Electrical Room Diagram
Slide 9 Instrumentation 2 – Session 12
10
Breaker Switch “ON” position “TRIPPED” position “OFF” position
Slide 10 Instrumentation 2 – Session 12
11
UPS Slide 11 Instrumentation 2 – Session 12
12
Automatic Transfer Switch
Slide 12 Instrumentation 2 – Session 12
13
Scenario 1 Slide 13 Instrumentation 2 – Session 12
14
Scenario 2 Slide 14 Instrumentation 2 – Session 12
15
Scenario 3 Slide 15 Instrumentation 2 – Session 12
16
Lab Scenario 1 Slide 16 Instrumentation 2 – Session 12
17
Lab Scenario 2 Slide 17 Instrumentation 2 – Session 12
18
Lab Scenario 3 Either/or Slide 18 Instrumentation 2 – Session 12