Download presentation
Presentation is loading. Please wait.
1
Monitoring and Evaluation
Dr Raghu Bista, NASC
2
चुरे बचाउ कार्यक्रम प्रभावकारी-भएन
चुरे बचाउ कार्यक्रम प्रभावकारी-भएन काठमाडौँ, जेठ २१ गते । राष्ट्रपति डा. रामवरण यादवले चुरे संरक्षण कार्यक्रम राष्ट्रिय महìव र गौरवको विषय भएकाले यसको संरक्षणका लागि सम्बन्धित सम्पूर्ण निकाय र सरोकारवालाहरूको ध्यानाकर्षण हुनुपर्ने बताउनुभएको छ । Source: visited on June
3
नेपाल वातावरण पत्रकार समूह (नेवापस)ले मङ्गलबार राष्ट्रपति भवनमा आयोजना गरेको ‘चुरे बुझौँ र बुझाऔँ’ नामक कार्यक्रमलाई सम्बोधन गर्दै राष्ट्रपति यादवले सो कुरा बताउनुभएको हो । आफ्नो रुचिको क्षेत्र स्वास्थ्य र शिक्षा भए पनि वातावरणीय सुरक्षा र महìव बुझेर चुरे क्षेत्रमा भइरहेको विनाश रोक्न राष्ट्रियस्तरको छलफल र बहसपछि तीन वर्षअघि राष्ट्रपति चुरे संरक्षण कार्यक्रम लागू गरेको सन्दर्भ जोड्दै राष्ट्रपति यादवले उद्देश्यअनुरूप संरक्षणको कार्यक्रमले सफलता नपाएकोमा चिन्ता व्यक्त गर्नुभयो ।
4
चुरे, भावर र तराई क्षेत्रमा आश्रित ६० प्रतिशत जनताको जीविकोपार्जनको सुरक्षासँग प्रत्यक्ष सरोकार राख्ने चुरे संरक्षणका कार्यक्रम कुनै व्यक्तिविशेषका लागि नभएर देश रहेसम्म नै रहिरहने गौरवको कार्यक्रम भए पनि सरकारको पहिलो प्राथमिकतामा पर्न नसकेको बताउँदै राष्ट्रपतिले पछिल्लो समय चुरे क्षेत्रको विनाशको अवस्था डरलाग्दो भएकाले यसको संरक्षणमा राष्ट्र््््््वयापी रूपमा नै कार्यक्रम तय गर्नुपर्नेमा जोड दिनुभयो ।
5
यस क्षेत्रको संरक्षणमा सम्पूर्ण सरोकारवालाहरूबीच प्रतिबद्धता र समन्वय आवश्यक भएको बताउँदै राष्ट्रपति यादवले भन्नुभयो, “चुरिया बचाउने अभियानका लागि मैले प्रधानमन्त्रीदेखि सम्बन्धित मन्त्रालयका सचिव र धेरै निकाय गुहार्दै लागिपरेको छु तर पनि प्रभावकारी हुन सकेन । ”
6
Monitoring and Control
Project monitoring is observing or checking on project activities to identify the current status of the project, identifying deviation of the project cost, schedule and quality with the plan and identifying potential problems. “ Monitoring is the collection, recording, and reporting of project information that is of importance to the project manager and other relevant stakeholders” (Samuel J Mantel, J R Meridith, S M Shafer and M R Sutton with M R Gopalan (2005). Project Management, Wiley India.)
7
Defining Monitoring Monitoring is a continuous function that uses systematic collection of data on specified indicators to provide management and the main stakeholders of an ongoing development intervention with indications of the extent of progress and achievement of objectives and progress in the use of allocated funds. Sources:World Bank(2011). Monitoring & Evaluation Capacity Development. The world Bank Group.
8
Policy Monitoring It is the process of examining whether the policy is being implemented as planned. It observes and checks whether policy related programs and activities are progressing as plan. It provides provides basis for corrective action
9
Project Control Control uses the monitored data and information to bring actual performance into agreement with the plan. Clearly, the need to exert proper control mandates the need to monitor the proper activities and elements of the project. (Samuel J Mantel, J R Meridith, S M Shafer and M R Sutton with M R Gopalan (2005). Project Management, Wiley India.)
10
Purpose of Monitoring To indicate at the earliest instance any shortcomings with regard to achieving intended objectives so that measures can be undertaken in good time To monitor the development of the project as a whole, and its component projects, in relation to changes in the context and circumstances of their implementation. To implement a rapid problem identification system as well as a system for internal communications to the various stakeholders.
11
Purpose of Monitoring Cont..
To provides forecasts on cost, To forecasts resources and schedule To facilitate evaluation process during and after activities, through the definition of specific indicators.
12
Monitoring System Monitoring system involves determining what data to collect; how, when, and who will collect the data, analysis of the data; and reporting current progress
13
Evaluation Evaluation can be defined as a process by which general judgments about quality, goal attainment, project/program effectiveness, impact and costs can be determined. It can therefore be conceptualized as a review of the whole project/program in order to assess its overall value and effects.
14
Evaluation Cont.. The aim of the evaluation is to determine the relevancy and fulfillment of objectives, efficiency, effectiveness, impacts and sustainability. It also aims to determine the worth or significance of an activity, policy, or programe Evaluation is important in that we learn from experience so that what is planned for the future is better than what went on before.
15
Evaluation Type Ex-ante Evaluation Mid Term Evaluation
Completion Evaluation Ex-post Evaluation (impact Evaluation)
16
Implementation of Intervention
Type of Evaluation Start of implementation Completion of intervention 2. Implementation of Intervention 4. 1. 3.
17
Impact Evaluation The objective of this type of evaluation is to determine whether or not a given project is achieving the intended impacts. Impact assessment on number of tourist arrivals Impacts on income of people near buffer zone Impacts of Habitat projects on number of tigers increment per year
18
Evaluation at Different Level
Evaluation is also classified by subject such as project level, program level, sector Level, policy level.
19
Difference between Monitoring and Evaluation
Monitoring is a continuing function that takes place throughout the implementation of a project/programme It focuses on the implementation of the project comparing what is delivered with what is planned Evaluation is assessing the entire project cycle. Evaluation reviews the achievements of theproject/programme and considers whether the plan was the best one to achieve.
20
Difference between Monitoring and Evaluation Cont…
Monitoring is usually done by people directly involved in implementing the project/ programme Evaluation looks for lessons to be learned from both success and lack of success, and also looks for best practices which can be applied elsewhere. Evaluation is best conducted by an independent outsider who can be impartial in consulting with project/programme staff.
21
Selection of indicators of project outcomes
Indicators are “the variables used to measure progress towards goals” (Stem C., Margoluis, R., Salafsky, N and Brown, M. (2005), Monitoring and Evaluation in Conservation: A review of Trends and Approaches, Foundation of Success 4109, Meryland Avenue, Bethesda, USA.)
22
Indicators An indicators indicates progress, success, and failure of a policy, program and project. Indicators are related: How do I know the intended positive change has taken place? What is the baseline situation? What changes? In what way? (quantity, quality, time description of targets).
23
Developing Indicators for Monitoring and Evaluation
An indicator gives reliable and unbiased understanding about an object, a situation, a phenomenon, a happening, a motion, development process, etc. It can be a simple number, a percentage, or ratio or rate, a ‘YES’ or ‘NO’ answer, a piece a data, a score…
24
Types of Indicators I Input indicators Process indicators
Output/outcome indicators Impact indicators
25
Types of Indicators II Time related indicator
Quantity related indicator Cost indicators Quality indicator
26
Steps to be taken to select indicators
Precisely identify what we want to monitor or examine List down the questions that need answers Identify the kind of indicators that can be used Review the methodological basis and robustness of these indicators Find out what data will be needed to derive each indicator, and where and how to get this data Gather sample data and examine
27
Criteria to Select Indicators
Indicators should be; relevant in concept to the aspect or issue to be examined clear in defining the purpose and limitations easily and rigorously calculated easily presented and interpreted easily understood and used in planning and decision-making Data should be timely available in and reliable In summary, good indicators are clear, reliable specific, measureable and accurate.
28
SMART Specific Measurable Achievable Relevant Time-bound
29
Quality Indicators exambles
Number of customer complaints on quality per day/month Number of service requests for a failed service in a day/month
30
Baseline Data Baseline data is needed to measure results before and after the projects intervention. Baseline data of number of tigers Fish population status of wetlands Resource inventory before intervention
31
Project Monitoring: What data are collected?
What is the current status of the project in terms of schedule and costs? Whether the inputs in the project are well utilized? How much will it cost to complete the project? When will the project be completed? Are there potential problems that need to be addressed now?
32
Project Monitoring: What data are collected? Cont…
What, who and where are the causes for cost and schedule overrun? What did we get for the Dollars spent? If there is cost overrun midway in the project, can we forecast the overrun at completion? The performance metrics you need to collect should support answering these questions.
33
Data Sources Where can information on the status of each indicators be obtained? (secondary data) Who provides the information? How is the information Colleted (primary data)
34
Methods of Data Collection
Census Sample Survey Participatory Rural Appraisal Focus Group Discussion In-depth Interview Field Observation
35
Timing of Research When and How often to collect data necessary to provide information during monitoring progress
36
Data Collection and Reporting
It is necessary to collect data, analyze them and transform them into information.
37
Budgeted Cost and Actual Cost
Cumulative Cost ($ in thousands) Elapsed Time (in weeks) 10 5 45 40 35 30 25 20 15 50 60 $10,000 Negative Var Cumulative Budgeted Cost Cumulative Actual Cost
38
Data Analysis Once data are collected, they are analyzed or processed for reporting. This may include averaging the data, calculating ratio, developing trends etc. Finally, the analysed data are reported in some form.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.