Download presentation
Presentation is loading. Please wait.
1
St Johns Primary School
Cable Free Project
2
St Johns Primary School - Cable Free Project
1no 16amp & 1no 32 amp T drop supply to Cutting station with battery powered hoover provided Battery bank powered from site supply MEWP Charging point from site supply GROUND FLOOR MAIN BUILDING
3
St Johns Primary School - Cable Free Project
1no 16amp & 1no 32 amp T drop supply to Cutting station with battery powered hoover provided Battery bank powered from site supply FIRST FLOOR MAIN BUILDING
4
St Johns Primary School - Cable Free Project
WHAT WE NEED TO PROVIDE WDC to provide 2no Cutting stations, 2no battery banks and 2no battery powered hoovers and spare batteries in line with the above plans Battery hoovers to be fixed to cutting stations securely, with spare batteries to be signed out from site office
5
SUPPLY CHAIN TO PROVIDE
St Johns Primary School - Cable Free Project SUPPLY CHAIN TO PROVIDE Supply chain members to provide battery powered tools required to undertake specific works Any high cost tools must be identified during pre start meeting where arrangements can be negotiated e.g. 50/50 split on cost of hire for the period required Any works that cannot be accommodated by a cordless tool will need to be identified during the prestart meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.