Utility Cost Background
Utility costs have increased over the last several years Transition period from Fiscal Year 02 to Fiscal Year 03 Winter MiAPPA Meeting March , 2005
4
Winter MiAPPA Meeting March , 2005
5
Energy Intensity Electricity (kWh) + Gas (MCF) + Steam (Mlb) converted to KBTU Divide Total by Square Feet Measure of overall energy input annually Winter MiAPPA Meeting March , 2005
6
Winter MiAPPA Meeting March , 2005
7
Utility Costs Energy intensity has decreased yet utility costs have increased in the last several fiscal years Majority of increase can be assigned to purchased steam Winter MiAPPA Meeting March , 2005
8
Winter MiAPPA Meeting March , 2005
9
Winter MiAPPA Meeting March , 2005
10
Factors Affecting Steam Rate
Long term contract with DTE expired in Oct 02 DTE sold steam business in January 03 Variable monthly steam rates currently being charged by new owners Natural gas prices increased Winter MiAPPA Meeting March , 2005
11
Winter MiAPPA Meeting March , 2005
12
In-House Steam Production
Approximately half of buildings not using district steam Self generating steam rates $ $11.00 per Mlb with maintenance & PM’s Savings opportunity exist for self generating compared to district steam Winter MiAPPA Meeting March , 2005
13
Steam Conversion Projects
Pharmacy Boiler Installation Chatsworth Boiler Plant Winter MiAPPA Meeting March , 2005
14
Wayne State University
Eugene Applebaum College of Pharmacy & Health Science New Boiler Installation March 17, 2005
15
Pharmacy Building 270,000 square feet Completed in April 2002
Construction cost of $66.6 million Teaching and Research Facility Winter MiAPPA Meeting March , 2005
16
Pharmacy Building Heating plant designed for district steam (due to budget constraints) Low pressure steam used for HVAC & domestic water heating High pressure steam used for process loads (sterilizers & others) Winter MiAPPA Meeting March , 2005
17
Pharmacy Steam Costs FY04 (Oct 03 – Sep 04)
Consumption was 35,454 Mlb Cost was $734,984 Average cost = $20.73 / Mlb Cost per Sq.Ft. = $2.72 (steam only) Winter MiAPPA Meeting March , 2005
18
Boiler Design Challenges
Lou Trama, President DiClemente Siegel Design Will outline some of the design challenges Winter MiAPPA Meeting March , 2005
19
Boiler Sizing Determine existing steam profile
Determine boiler size – 800 BHP or 32 million BTUH input Winter MiAPPA Meeting March , 2005
20
Project Cost Total project cost was $1.5 million
Limbach Company was the mechanical contractor Project completed on time Winter MiAPPA Meeting March , 2005
21
Boiler Location Location of new gas fired boiler
Weight of boiler is 60,000 pounds Structural considerations Winter MiAPPA Meeting March , 2005
22
Redundant Steam How to handle redundant steam service
Integration with district steam system Control of steam from boiler and district steam Winter MiAPPA Meeting March , 2005
23
Winter MiAPPA Meeting March , 2005
24
Winter MiAPPA Meeting March , 2005
25
Rigging Boiler How to get 60,000 pound boiler in existing building?
Boiler rigged through roof Winter MiAPPA Meeting March , 2005
26
Winter MiAPPA Meeting March , 2005
27
Winter MiAPPA Meeting March , 2005
28
Winter MiAPPA Meeting March , 2005
29
Winter MiAPPA Meeting March , 2005
30
Winter MiAPPA Meeting March , 2005
31
Winter MiAPPA Meeting March , 2005
32
Winter MiAPPA Meeting March , 2005
33
Winter MiAPPA Meeting March , 2005
34
Winter MiAPPA Meeting March , 2005
35
Winter MiAPPA Meeting March , 2005
36
Gas Service Upgrading of natural gas service
5 psi gas required at boiler gas train Coordination with local gas utility Winter MiAPPA Meeting March , 2005
37
Winter MiAPPA Meeting March , 2005
38
Savings Projected savings of $300,000 annually
Anticipated cost of self generated steam = $11.15, 46% reduction from district steam Includes maintenance & electricity for boiler Winter MiAPPA Meeting March , 2005
39
Savings Simple Payback of 5.0 years
Cost per sq. Ft. = $1.43 (steam only), 47% reduction compared to district steam Winter MiAPPA Meeting March , 2005
40
Questions? Winter MiAPPA Meeting March , 2005
41
WAYNE STATE UNIVERSITY
Chatsworth Steam Plant Boiler Plant Installation March 17, 2005
42
Background Chatsworth Apartments, DeRoy Apartments and Student Center Building in the immediate area All currently using district steam Winter MiAPPA Meeting March , 2005
43
CHATSWORTH APARTMENTS
DEROY APARTMENTS STUDENT CENTER Winter MiAPPA Meeting March , 2005
44
Winter MiAPPA Meeting March , 2005
45
Steam Statistics Three building steam load is 35,000 Mlb annually
Student Center uses steam for heating, domestic water heating & cooling (steam absorber) Winter MiAPPA Meeting March , 2005
46
Steam Statistics DeRoy Apartments uses steam for heating, domestic water heating & cooling (steam absorber) Chatsworth uses steam for heating only (gas domestic water heating; no air conditioning) Winter MiAPPA Meeting March , 2005
47
Steam Statistics Current district steam cost is $725,500 annually
Average cost per Mlb = $20.73 (FY04) Total Sq. Ft. is 552, 300 Average cost per Sq. Ft. is $1.31 (steam only) Winter MiAPPA Meeting March , 2005
48
Self Generating Option
Existing self generating buildings generate steam for about $ $11.00 per Mlb Approximately half of purchased district steam rate Large potential for savings if we self-generate Winter MiAPPA Meeting March , 2005
49
Self Generating Option
Peter Basso Associates commissioned to perform feasibility study, and later design of plant Brian Runde, Vice President of Peter Basso will describe this initiative & design challenges Winter MiAPPA Meeting March , 2005
50
Feasibility Study District steam currently comes into Chatsworth and then branches to feed Student Center Opportunity to install plant to feed Chatsworth, DeRoy and Student Center Winter MiAPPA Meeting March , 2005
51
Feasibility Study Study indicates annual savings of $353, 230
Project cost is $3.3 million Simple Payback of 9.34 years Winter MiAPPA Meeting March , 2005
52
Location of Plant Chatsworth Apartments was built in 1926.
Originally had its own steam plant (coal fired) Investigated if new plant could be installed there Also, unused former underground parking garage as potential location Winter MiAPPA Meeting March , 2005
53
Winter MiAPPA Meeting March , 2005
54
Design of Plant Existing boiler room in Chatsworth was too small and restrictive Former parking garage was large enough but had restrictive height Boiler load was 30,000 lb per hour Winter MiAPPA Meeting March , 2005
55
Winter MiAPPA Meeting March , 2005
56
Winter MiAPPA Meeting March , 2005
57
Design of Plant Three 350 BHP to meet load
Fourth 350 boiler as back-up Use multiple smaller boiler in lieu of larger to meet height restrictions & optimize efficiency during light loads Winter MiAPPA Meeting March , 2005
58
SCHEMATIC LAYOUT Winter MiAPPA Meeting March , 2005
59
PIPING DIAGRAM Winter MiAPPA Meeting March , 2005
60
Design of Plant Existing chimney appeared to be in good shape
Later inspected and verified to be in good shape Winter MiAPPA Meeting March , 2005
61
Winter MiAPPA Meeting March , 2005
62
Boilers in Garage How to get boilers in garage?
First approach to lower through garage roof in front of building Later approach to lower down existing ramp Winter MiAPPA Meeting March , 2005
63
Winter MiAPPA Meeting March , 2005
64
Design Challenges Installing breeching to existing chimney from garage
New gas service – 2 psi required at burner 10 psi gas main Winter MiAPPA Meeting March , 2005
65
Design Challenges Electrical service upgrade
New service from New Residence Tower Tie into existing apartment electrical service Steam plant on back-up generator Winter MiAPPA Meeting March , 2005
66
Winter MiAPPA Meeting March , 2005
67
Winter MiAPPA Meeting March , 2005
68
Results Currently under construction L A Mechanical is the contractor
To be completed in August of 2005 Anticipated savings of $350,000 annually Winter MiAPPA Meeting March , 2005
69
Results Self generated steam rate of $9.50 per Mlb (including maintenance & PMs), 54% reduction from district steam Cost per Sq. Ft. = $0.60, 54% reduction from district steam Winter MiAPPA Meeting March , 2005
70
Winter MiAPPA Meeting March , 2005
71
Winter MiAPPA Meeting March , 2005
72
Winter MiAPPA Meeting March , 2005
73
Winter MiAPPA Meeting March , 2005
74
Questions ? Winter MiAPPA Meeting March , 2005
75
Wayne State University
Energy Tracking Software Energy Cap March 17, 2005
76
Energy Tracking Software Energy Cap
FY05 General Fund utility budget is over $22 million No energy tracking software until recently Utility budgets were handled on a utility by utility macro basis Winter MiAPPA Meeting March , 2005
77
Energy Tracking Software Energy Cap
130 buildings General & Non General Fund 8.5 million square feet of buildings 2.5 million square feet of parking decks Winter MiAPPA Meeting March , 2005
78
Software Requirements
Software capable of tracking cost, utility units, budget, generating reports Track by building Produce meaningful reports Winter MiAPPA Meeting March , 2005
79
Energy Tracking Software Energy Cap
Software chosen was Energy Cap Winter MiAPPA Meeting March , 2005
80
Energy Tracking Software Energy Cap
Utilities Electricity Natural Gas Steam Water Winter MiAPPA Meeting March , 2005
81
Energy Tracking Software Energy Cap
Over 400 monthly invoices 5,000 invoices per fiscal year Multiple fields per invoice Winter MiAPPA Meeting March , 2005
82
Energy Tracking Software Energy Cap
Example Report Account Summary by Commodity (BL04) Old Main FY04 Winter MiAPPA Meeting March , 2005
83
Winter MiAPPA Meeting March , 2005
84
Winter MiAPPA Meeting March , 2005
85
Winter MiAPPA Meeting March , 2005
86
Energy Tracking Software Energy Cap
Example Reports Cost Center Summary by Commodity (BL10) Chatsworth Annex, Forest Apartments Winter MiAPPA Meeting March , 2005
87
Winter MiAPPA Meeting March , 2005
88
Winter MiAPPA Meeting March , 2005
89
Energy Tracking Software Energy Cap
Example Report Energy Index Summary for apartments (AN08) FY04 Winter MiAPPA Meeting March , 2005
90
Winter MiAPPA Meeting March , 2005
91
Energy Tracking Software Energy Cap
Example Report Energy Index Summary for Parking Decks 1 thru 6 FY04 Winter MiAPPA Meeting March , 2005
92
Winter MiAPPA Meeting March , 2005
93
Energy Tracking Software Energy Cap
Example Report Budget Report – still being developed Historical data will help define budget patterns Winter MiAPPA Meeting March , 2005
94
Winter MiAPPA Meeting March , 2005
95
Questions? Winter MiAPPA Meeting March , 2005
96
Thank You Winter MiAPPA Meeting March , 2005
97
Presenters Lou Trama, P.E. DiClemente Siegel Design Brian Runde, P.E.
Brian Runde, P.E. Peter Basso Associates Larry Fodor, CEM Wayne State University Winter MiAPPA Meeting March , 2005
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.