1 WAYNE STATE UNIVERSITY
Utilities & Energy Management Session Larry S. Fodor, CEM Director of Utilities & Energy Management March 17, 2005

2 Session Agenda Utility Cost Background Pharmacy Boiler Installation
Chatsworth Boiler Installation Energy Tracking Software Winter MiAPPA Meeting March , 2005

3 Utility Cost Background
Utility costs have increased over the last several years Transition period from Fiscal Year 02 to Fiscal Year 03 Winter MiAPPA Meeting March , 2005

4 Winter MiAPPA Meeting March , 2005

5 Energy Intensity Electricity (kWh) + Gas (MCF) + Steam (Mlb) converted to KBTU Divide Total by Square Feet Measure of overall energy input annually Winter MiAPPA Meeting March , 2005

6 Winter MiAPPA Meeting March , 2005

7 Utility Costs Energy intensity has decreased yet utility costs have increased in the last several fiscal years Majority of increase can be assigned to purchased steam Winter MiAPPA Meeting March , 2005

8 Winter MiAPPA Meeting March , 2005

9 Winter MiAPPA Meeting March , 2005

10 Factors Affecting Steam Rate
Long term contract with DTE expired in Oct 02 DTE sold steam business in January 03 Variable monthly steam rates currently being charged by new owners Natural gas prices increased Winter MiAPPA Meeting March , 2005

11 Winter MiAPPA Meeting March , 2005

12 In-House Steam Production
Approximately half of buildings not using district steam Self generating steam rates $ $11.00 per Mlb with maintenance & PM’s Savings opportunity exist for self generating compared to district steam Winter MiAPPA Meeting March , 2005

13 Steam Conversion Projects
Pharmacy Boiler Installation Chatsworth Boiler Plant Winter MiAPPA Meeting March , 2005

14 Wayne State University
Eugene Applebaum College of Pharmacy & Health Science New Boiler Installation March 17, 2005

15 Pharmacy Building 270,000 square feet Completed in April 2002
Construction cost of $66.6 million Teaching and Research Facility Winter MiAPPA Meeting March , 2005

16 Pharmacy Building Heating plant designed for district steam (due to budget constraints) Low pressure steam used for HVAC & domestic water heating High pressure steam used for process loads (sterilizers & others) Winter MiAPPA Meeting March , 2005

17 Pharmacy Steam Costs FY04 (Oct 03 – Sep 04)
Consumption was 35,454 Mlb Cost was $734,984 Average cost = $20.73 / Mlb Cost per Sq.Ft. = $2.72 (steam only) Winter MiAPPA Meeting March , 2005

18 Boiler Design Challenges
Lou Trama, President DiClemente Siegel Design Will outline some of the design challenges Winter MiAPPA Meeting March , 2005

19 Boiler Sizing Determine existing steam profile
Determine boiler size – 800 BHP or 32 million BTUH input Winter MiAPPA Meeting March , 2005

20 Project Cost Total project cost was $1.5 million
Limbach Company was the mechanical contractor Project completed on time Winter MiAPPA Meeting March , 2005

21 Boiler Location Location of new gas fired boiler
Weight of boiler is 60,000 pounds Structural considerations Winter MiAPPA Meeting March , 2005

22 Redundant Steam How to handle redundant steam service
Integration with district steam system Control of steam from boiler and district steam Winter MiAPPA Meeting March , 2005

23 Winter MiAPPA Meeting March , 2005

24 Winter MiAPPA Meeting March , 2005

25 Rigging Boiler How to get 60,000 pound boiler in existing building?
Boiler rigged through roof Winter MiAPPA Meeting March , 2005

26 Winter MiAPPA Meeting March , 2005

27 Winter MiAPPA Meeting March , 2005

28 Winter MiAPPA Meeting March , 2005

29 Winter MiAPPA Meeting March , 2005

30 Winter MiAPPA Meeting March , 2005

31 Winter MiAPPA Meeting March , 2005

32 Winter MiAPPA Meeting March , 2005

33 Winter MiAPPA Meeting March , 2005

34 Winter MiAPPA Meeting March , 2005

35 Winter MiAPPA Meeting March , 2005

36 Gas Service Upgrading of natural gas service
5 psi gas required at boiler gas train Coordination with local gas utility Winter MiAPPA Meeting March , 2005

37 Winter MiAPPA Meeting March , 2005

38 Savings Projected savings of $300,000 annually
Anticipated cost of self generated steam = $11.15, 46% reduction from district steam Includes maintenance & electricity for boiler Winter MiAPPA Meeting March , 2005

39 Savings Simple Payback of 5.0 years
Cost per sq. Ft. = $1.43 (steam only), 47% reduction compared to district steam Winter MiAPPA Meeting March , 2005

40 Questions? Winter MiAPPA Meeting March , 2005

41 WAYNE STATE UNIVERSITY
Chatsworth Steam Plant Boiler Plant Installation March 17, 2005

42 Background Chatsworth Apartments, DeRoy Apartments and Student Center Building in the immediate area All currently using district steam Winter MiAPPA Meeting March , 2005

43 CHATSWORTH APARTMENTS
DEROY APARTMENTS STUDENT CENTER Winter MiAPPA Meeting March , 2005

44 Winter MiAPPA Meeting March , 2005

45 Steam Statistics Three building steam load is 35,000 Mlb annually
Student Center uses steam for heating, domestic water heating & cooling (steam absorber) Winter MiAPPA Meeting March , 2005

46 Steam Statistics DeRoy Apartments uses steam for heating, domestic water heating & cooling (steam absorber) Chatsworth uses steam for heating only (gas domestic water heating; no air conditioning) Winter MiAPPA Meeting March , 2005

47 Steam Statistics Current district steam cost is $725,500 annually
Average cost per Mlb = $20.73 (FY04) Total Sq. Ft. is 552, 300 Average cost per Sq. Ft. is $1.31 (steam only) Winter MiAPPA Meeting March , 2005

48 Self Generating Option
Existing self generating buildings generate steam for about $ $11.00 per Mlb Approximately half of purchased district steam rate Large potential for savings if we self-generate Winter MiAPPA Meeting March , 2005

49 Self Generating Option
Peter Basso Associates commissioned to perform feasibility study, and later design of plant Brian Runde, Vice President of Peter Basso will describe this initiative & design challenges Winter MiAPPA Meeting March , 2005

50 Feasibility Study District steam currently comes into Chatsworth and then branches to feed Student Center Opportunity to install plant to feed Chatsworth, DeRoy and Student Center Winter MiAPPA Meeting March , 2005

51 Feasibility Study Study indicates annual savings of $353, 230
Project cost is $3.3 million Simple Payback of 9.34 years Winter MiAPPA Meeting March , 2005

52 Location of Plant Chatsworth Apartments was built in 1926.
Originally had its own steam plant (coal fired) Investigated if new plant could be installed there Also, unused former underground parking garage as potential location Winter MiAPPA Meeting March , 2005

53 Winter MiAPPA Meeting March , 2005

54 Design of Plant Existing boiler room in Chatsworth was too small and restrictive Former parking garage was large enough but had restrictive height Boiler load was 30,000 lb per hour Winter MiAPPA Meeting March , 2005

55 Winter MiAPPA Meeting March , 2005

56 Winter MiAPPA Meeting March , 2005

57 Design of Plant Three 350 BHP to meet load
Fourth 350 boiler as back-up Use multiple smaller boiler in lieu of larger to meet height restrictions & optimize efficiency during light loads Winter MiAPPA Meeting March , 2005

58 SCHEMATIC LAYOUT Winter MiAPPA Meeting March , 2005

59 PIPING DIAGRAM Winter MiAPPA Meeting March , 2005

60 Design of Plant Existing chimney appeared to be in good shape
Later inspected and verified to be in good shape Winter MiAPPA Meeting March , 2005

61 Winter MiAPPA Meeting March , 2005

62 Boilers in Garage How to get boilers in garage?
First approach to lower through garage roof in front of building Later approach to lower down existing ramp Winter MiAPPA Meeting March , 2005

63 Winter MiAPPA Meeting March , 2005

64 Design Challenges Installing breeching to existing chimney from garage
New gas service – 2 psi required at burner 10 psi gas main Winter MiAPPA Meeting March , 2005

65 Design Challenges Electrical service upgrade
New service from New Residence Tower Tie into existing apartment electrical service Steam plant on back-up generator Winter MiAPPA Meeting March , 2005

66 Winter MiAPPA Meeting March , 2005

67 Winter MiAPPA Meeting March , 2005

68 Results Currently under construction L A Mechanical is the contractor
To be completed in August of 2005 Anticipated savings of $350,000 annually Winter MiAPPA Meeting March , 2005

69 Results Self generated steam rate of $9.50 per Mlb (including maintenance & PMs), 54% reduction from district steam Cost per Sq. Ft. = $0.60, 54% reduction from district steam Winter MiAPPA Meeting March , 2005

70 Winter MiAPPA Meeting March , 2005

71 Winter MiAPPA Meeting March , 2005

72 Winter MiAPPA Meeting March , 2005

73 Winter MiAPPA Meeting March , 2005

74 Questions ? Winter MiAPPA Meeting March , 2005

75 Wayne State University
Energy Tracking Software Energy Cap March 17, 2005

76 Energy Tracking Software Energy Cap
FY05 General Fund utility budget is over $22 million No energy tracking software until recently Utility budgets were handled on a utility by utility macro basis Winter MiAPPA Meeting March , 2005

77 Energy Tracking Software Energy Cap
130 buildings General & Non General Fund 8.5 million square feet of buildings 2.5 million square feet of parking decks Winter MiAPPA Meeting March , 2005

78 Software Requirements
Software capable of tracking cost, utility units, budget, generating reports Track by building Produce meaningful reports Winter MiAPPA Meeting March , 2005

79 Energy Tracking Software Energy Cap
Software chosen was Energy Cap Winter MiAPPA Meeting March , 2005

80 Energy Tracking Software Energy Cap
Utilities Electricity Natural Gas Steam Water Winter MiAPPA Meeting March , 2005

81 Energy Tracking Software Energy Cap
Over 400 monthly invoices 5,000 invoices per fiscal year Multiple fields per invoice Winter MiAPPA Meeting March , 2005

82 Energy Tracking Software Energy Cap
Example Report Account Summary by Commodity (BL04) Old Main FY04 Winter MiAPPA Meeting March , 2005

83 Winter MiAPPA Meeting March , 2005

84 Winter MiAPPA Meeting March , 2005

85 Winter MiAPPA Meeting March , 2005

86 Energy Tracking Software Energy Cap
Example Reports Cost Center Summary by Commodity (BL10) Chatsworth Annex, Forest Apartments Winter MiAPPA Meeting March , 2005

87 Winter MiAPPA Meeting March , 2005

88 Winter MiAPPA Meeting March , 2005

89 Energy Tracking Software Energy Cap
Example Report Energy Index Summary for apartments (AN08) FY04 Winter MiAPPA Meeting March , 2005

90 Winter MiAPPA Meeting March , 2005

91 Energy Tracking Software Energy Cap
Example Report Energy Index Summary for Parking Decks 1 thru 6 FY04 Winter MiAPPA Meeting March , 2005

92 Winter MiAPPA Meeting March , 2005

93 Energy Tracking Software Energy Cap
Example Report Budget Report – still being developed Historical data will help define budget patterns Winter MiAPPA Meeting March , 2005

94 Winter MiAPPA Meeting March , 2005

95 Questions? Winter MiAPPA Meeting March , 2005

96 Thank You Winter MiAPPA Meeting March , 2005

97 Presenters Lou Trama, P.E. DiClemente Siegel Design Brian Runde, P.E.
Brian Runde, P.E. Peter Basso Associates Larry Fodor, CEM Wayne State University Winter MiAPPA Meeting March , 2005