Calculating simple Construction

Similar presentations


Presentation on theme: "Calculating simple Construction"— Presentation transcript:

1 Calculating simple Construction
Calculating simple simple construction house building

2 The Goals of Learning Student can mention in terms of building job.
Student can analyze building job. Student can calculate simple construction. Teknologi dan Rekayasa

3 The terms in building job
Principal Adviser Direction / FOREMAN Contractor Manager Teknologi dan Rekayasa

4 Building Job The condition of hard land which is founded less than 1 m (practice construction) The Condition of Hard land which is founded more than 1 m. (construction is calculated) Teknologi dan Rekayasa

5 Practice Construction
Kinds of foundation is river stone. Sloop size is 15 x 20 with 4 Φ 12 Practice Column size is 15 x 15 with 4 Φ 12 Ring Balk size is 5 x 20 with 4 Φ 10 Teknologi dan Rekayasa

6 Example of calcukation
The Picture of map Teknologi dan Rekayasa

7 Analysis of Calculation
NO JOB IN DETAIL VOLUME HRG SATUAN JML HARGA Rp I. PREPARATION JOB 1 Land Digging 57.68 m3 15,000.00 865,200.00 2 Land Flatting 40.38 10,000.00 403,760.00 3 Sand Filling 26.85 120,000.00 3,222,000.00 Jumlah 4,490,960.00 II. Stone Job RiverStone Fondation i 1:3:10 73.71 325,000.00 23,955,750.00 Sloop Log and Ring Balk 7.56 2,900,000.00 21,924,000.00 Bone Skeleton Concret Column 5.81 16,834,500.00 4 Bone Skeleton Roof Concrete Plat 6.29 3,100,000.00 19,505,200.00 5 Roster 4.00 bh 150,000.00 600,000.00 6 \brick Arrangement 460.15 m2 55,000.00 25,308,250.00 7 Wall Plastering 920.30 17,500.00 16,105,250.00 8 Sponengan sudut 457.00 m' 7,500.00 3,427,500.00 9 Rain Channels 53.00 50,000.00 2,650,000.00 10 Pilar teras depan 2.00 500,000.00 1,000,000.00 11 Natural Stone Ornament 21.20 275,000.00 5,830,000.00 137,140,450.00 Teknologi dan Rekayasa

8 continued Teknologi dan Rekayasa III. Wood and Roof Job 1
III. Wood and Roof Job 1 Wood Easle BK 2.15 m3 9,000,000.00 19,310,400.00 2 Wood Gording BK 2.09 8,500,000.00 17,748,000.00 3 Wood Rafter BK Sb Rafter of Teakwood 205.09 70,000.00 14,356,588.24 4 Wood Lisplank BK 47.74 m' 95,000.00 4,535,300.00 5 Wood Plafond Skeleton Kruing 172.83 m2 56,000.00 9,678,480.00 6 Gipsum Plafond 35,000.00 6,049,050.00 8 Ornament Gypsum of the Center of Guest Room 2.00 unit 350,000.00 700,000.00 9 Gypsum List 279.98 17,500.00 4,899,650.00 11 Ridge of Roof 52.35 50,000.00 2,617,647.06 12 Roof Tile of concrete flat 57,500.00 11,792,911.76 13 Wattle Plang 25,000.00 1,308,823.53 15 BaringtoniaSpicata eave 21.00 45,000.00 945,000.00 16 Pralon saluran talang 20.00 20,000.00 400,000.00 17 Door and Window Frame of Teak Wood 1.71 15,000,000.00 25,670,250.00 18 Door plank of Teak Wood 31.57 525,000.00 16,574,250.00 19 Window Plank of Teak Wood 24.78 325,000.00 8,053,500.00 20 Rayben glass 85,000.00 2,106,300.00 21 Iron Door of the Garage 8.75 600,000.00 5,250,000.00 Jumlah 151,996,150.59 Teknologi dan Rekayasa

9 continued Teknologi dan Rekayasa IV. Sanitation and Ceramic Tile Job 1
IV. Sanitation and Ceramic Tile Job 1 Floor Ceramic Tile Serie Platinum ASIA 159.24 m2 87,500.00 13,933,500.00 2 Floor Ceramik Tile of Garage brand of Asia Platinum 21.00 90,000.00 1,890,000.00 3 List of Edge Ceramik (plint) 279.98 m' 20,000.00 5,599,600.00 4 List stpnosing (edge list) 17.00 60,000.00 1,020,000.00 5 Wall Ceramic of Kitchen 85,000.00 1,785,000.00 6 Discont Concrete of front garagei 22.75 50,000.00 1,137,500.00 7 Discount of Concrete 180.24 17,500.00 3,154,200.00 8 Complete Washtafel brand of TOTO 1.00 bh 1,200,000.00 9 Faucet 4.00 175,000.00 700,000.00 10 Stop kran 150,000.00 600,000.00 11 Floordrain 2.00 75,000.00 12 Wash basin ofstenlisteel brand of TOSTEM 1,250,000.00 13 Water Tankof stenlisteel brand of TIRTA 2,500,000.00 14 Water Radar 15 Water Tower 2,000,000.00 16 Clean Water Channels 76.00 1,330,000.00 17 Saluran air kotor 73.00 22,500.00 1,642,500.00 18 Well pipe tafsir 19 Well making 1,500,000.00 20 Water Pmp brand of SANYO/DAB 950,000.00 21 Pmp House 350,000.00 22 Kitchen table from concrete 5.00 125,000.00 625,000.00 23 Septictank dan absorbing unit 3,500,000.00 Jumlah 48,217,300.00 V. Hanging and locking Job / secure Door slot brand of SES 14.00 225,000.00 3,150,000.00 Door Easle 2,125,000.00 Window easle. 1,260,000.00 Wind hack 28.00 1,400,000.00 Grendel Handle 6.00 stel 2,100,000.00 10,735,000.00 Teknologi dan Rekayasa

10 continued Teknologi dan Rekayasa VI elctricity Installation Job : 1
VI elctricity Installation Job : 1 Lamp point 25.00 ttk 95,000.00 2,375,000.00 2 Stop Contact Broco 12.00 1,140,000.00 3 Bok MCB 1.00 unit 350,000.00 4 Installation of PLN tafsir 2,000,000.00 5 Lampo of andong for front ornament.for front tornament. 2.00 bh 500,000.00 1,000,000.00 Jumlah 6,865,000.00 VII. Paintig Job Wall painting brand of ICI 920.30 m2 12,500.00 11,503,750.00 Painting of plafond 172.83 12,000.00 2,073,960.00 Wood Painting brand of F TALIT 20.00 20,000.00 400,000.00 Politur of window frame pintu jendela 193.20 m' 50,000.00 9,660,000.00 Politur of plank door 59.62 80,000.00 4,769,600.00 6 Politur of plank window 49.56 3,964,800.00 7 Wood preservation (roof skeleton) 1,250,000.00 33,622,110.00 VIII. PEKERJAAN KMD/WC ANAK Wall ceramic kmd band of Asia 14.00 90,000.00 1,260,000.00 FloorCeramic kmd brand of ASIA 2.25 87,500.00 196,875.00 Lis keramik variation of list Ceramic 5.50 60,000.00 330,000.00 Shower brand of FRISONE 275,000.00 Toilet shower brand TOTO 250,000.00 Sit down Closed INA 1,350,000.00 Kran Brand SAN EI 8 Flordrain 75,000.00 9 Tempat sabun INA 125,000.00 10 Basin bath making 200,000.00 4,561,875.00 Teknologi dan Rekayasa

11 continued Teknologi dan Rekayasa IX. PEKERJAAN KMD/WC R.TIDUR UTAMA 1
IX. PEKERJAAN KMD/WC R.TIDUR UTAMA 1 Dinding keramik kmd Merk ASIA 22.00 m2 90,000.00 1,980,000.00 2 Lantai keramik kmd ASIA 6.00 87,500.00 525,000.00 3 Lis keramik variasi tengah saja 9.00 m' 60,000.00 540,000.00 4 Shower merk FRISONE 1.00 bh 275,000.00 5 Toilet shower merk TOTO 250,000.00 6 Closed duduk INA 1,350,000.00 7 Kran merk SAN EI 2.00 500,000.00 8 Flordrain 75,000.00 9 Tempat sabun INA 350,000.00 10 Bikin Bak mandi 11 Wastafel 1,200,000.00 Jumlah 7,395,000.00 X. Job of KMD / WC and washing Wall Ceramic kmd 12.00 80,000.00 960,000.00 Floor keramik kmd 5.25 420,000.00 Bath Basin 150,000.00 Closet 125,000.00 Floordrain Wash out 50,000.00 Soap Container Facet of SAN EI 2,355,000.00 Teknologi dan Rekayasa

12 continued Teknologi dan Rekayasa I. Preparation Job Rp 4,490,960.00
A. Main Building Job I. Preparation Job Rp 4,490,960.00 II. Stone ob 137,140,450.00 III. Wood and Roof ob 151,996,150.59 IV. Sanitation and Ceramic Job 48,217,300.00 V. Job of Hanging and Locking/ secure 10,735,000.00 VI. Electriciry Installation Job : 6,865,000.00 VII. Painting Job : 33,622,110.00 VIII. PEKERJAAN KMD/WC ANAK 4,561,875.00 IX. Main of sleep Room KMD/WC Job 7,395,000.00 X. Job of KMD/WC washing and servant 2,355,000.00 Jumlah 407,378,845.59 NO job in Detail VOLUME HRG SATUAN JML HARGA B. Job of Fence and another Cost : 1 Land Digging 18.76 m3 15,000.00 281,400.00 2 Foundation Arrangementi 18.09 325,000.00 5,879,250.00 3 Bone skeleton concrete Sloop 2.01 2,900,000.00 5,829,000.00 4 Bone skeleton concrete column 1.08 3,132,000.00 5 Brick Arrangement 117.25 m2 55,000.00 6,448,750.00 6 Wall Plastering 17,500.00 2,051,875.00 7 Corner Straight line 76.00 bh 7,500.00 570,000.00 8 Cat catan 105.00 12,500.00 1,312,500.00 9 Minimalist iron door model 5.25 m 550,000.00 2,887,500.00 10 Iron Fence of Minimalist model 9.50 500,000.00 4,750,000.00 11 Urugan tanah untuk peninggian bangunan 182.00 70,000.00 12,740,000.00 12 IMB cost 1.00 tafsir 2,685,000.00 48,567,275.00 Teknologi dan Rekayasa

13 continued Teknologi dan Rekayasa Recapitulaion : A. Main Building Job
Recapitulaion : A. Main Building Job Rp 407,378,845.59 B.Job of Fence and Another Cost: 48,567,275.00 455,946,120.59 455,000,000.00 Teknologi dan Rekayasa