The Gainesville Area Chamber Infrastructure Investment Initiative
Alachua County Roads Infrastructure Overview Public Works Department July 12, 2017
2
State of Roadway System & Funding
Policy Foundation: Consider a pavement design that provides an adequate structure to meet the needs of the community, for a specific life, and affordability. Centerline Miles. Minimal 4-lane roadways.
3
Difference Between Reconstruction/Retrofit & Resurfacing
Brings corridor up to current standards. Corridor Design Manual. Adds/improves facilities. Installs standard pavement structure. Resurfacing: Focuses on current pavement width. Address immediate hazards and deficiencies. Does not add new facilities. Address localized pavement deficiencies. Centerline Miles. Minimal 4-lane roadways.
4
Pavement Management Inventory & Funding
Why would you consider Resurfacing OVER Reconstruction/Retrofitting? Centerline Miles. Minimal 4-lane roadways. Resurfacing is about maintaining what you already have.
5
Pavement Management Inventory & Funding
Why would you consider Resurfacing OVER Reconstruction/Retrofitting? Centerline Miles. Minimal 4-lane roadways.
6
Pavement Management Basic Strategy
Problematic/Critical Condition 20+ years old Poor Condition 15 to 20 years old Acceptable Less than 15 years old Pothole filling does not move a road from one condition to another. Centerline Miles. Minimal 4-lane roadways.
7
Pavement Management Basic Strategy
Problematic/Critical Condition 20+ years old Poor Condition 15 to 20 years old Acceptable Less than 15 years old Reconstruction and resurfacing move roads from red to green. Centerline Miles. Minimal 4-lane roadways.
8
Pavement Management Basic Strategy
Problematic/Critical Condition 20+ years old Poor Condition 15 to 20 years old Acceptable Less than 15 years old Crack sealing and pavement rejuvenators move roads from yellow to green.
9
Pavement Management Basic Strategy
Paved roads (locals, collectors, arterials) 700 centerline miles Target = 5% to 7% per year (Why? Expect a 20 year life) Resurfacing goal =35 to 49 centerline miles per year Centerline Miles. Minimal 4-lane roadways.
10
Pavement Management Basic Strategy
ANNUAL TARGET Reconstruction $26 million to $35 million Resurfacing $10 million to $17 million Centerline Miles. Minimal 4-lane roadways.
11
Pavement Management Inventory & Funding
No Repair Needed (8 – 10, Pavement Management Project Ranking Methodology) 1 layer of Asphalt (Minor Repair): 7, Pavement Management Project Ranking Methodology, (1 ½” Asphalt Resurfacing) 2 layers of Asphalt (Major Repair): , Pavement Management Project Ranking Methodology, (3 - 3 ½” Asphalt Resurfacing) Base Rework (Major Repair): , Pavement Management Project Ranking Methodology, (3 - 3 ½” Asphalt Resurfacing) Rebuild Roadway (Full Pavement Reconstruction): 1 -2, Pavement Management Project Ranking Methodology
12
Pavement Management Inventory & Funding
13
Funding Prior to the FY 2016, Funding for Pavement Management projects was VERY limited.
20
Funding The County Commission has increased funding from its general fund to pay for improving deteriorating roads. 27% from FY 2016 ($2,577,760) to current year (FY 2017, $3,285,576) 40% from FY 2016 ($2,577,760) to proposed FY 2018 ($3,615,536).
21
List of Proposed PM Projects
Amount Miles $/Mile FDR $12,590, $514,087.38 Resurface $ 3,810, $929,268.29 Chipseal $ 3,369, $109,347.61 Total: $19,769,000.00
22
Map of Proposed PM Projects
23
Current Projects Public Works Department July 12, 2017
24
SE 43rd St. Widening Addition of a center turn lane from Eastside High School to Lake Forest Elementary School; addition of a right turn lane for both schools; addition enhanced crosswalk markings; mill & resurface and addition of bike lanes from Hawthorne Rd to E University Avenue. $2.0 Million – Impact Fee & MMTM (Eastside) and General Fund
25
NW 143rd St. @ 32nd Ave. Intersection Modification
Construction of traffic signal; addition of northbound right tune lane; addition of eastbound and westbound left turn lanes; addition of left turn lane into Jonesville Park. $1.85 Million – Impact Fees (Northwest)
26
SW 63rd Blvd. / SW 62nd Ave. Rehabilitation
Pavement rehab via re-mixing the roadway from Archer Rd to Williston Rd, addition of bike lanes, softening curve (curve re-alignment), addition of stormwater management facilities, adding turn lanes for Finley Woods (funded by developer) and a left turn lane at Williston Rd. $3.6 million – 5-cent local option gas tax & developer
27
CR 236 Resurfacing Mill & resurface of CR 236 from US 441 to I-75 including additional of stabilized shoulders, safety edge and sidewalks in the City Limits of High Spring $2.01 million – General fund.
28
Programed Projects Public Works Department July 12, 2017
29
NW 69th Terrace W Newberry Rd to NW 11th Pl Mill & Resurface
Cost: $160,000 General Fund FY 17 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles
30
NW 69th Ter – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
31
Tower Rd. (SW 8th Ave to SW 53rd Place)
2.8 miles total SUNTrail is 1.2 miles 8 ft Sidewalk Gap SW 8th Ave to SW 26th Pl SUNTrail
32
$4.42 Million – General fund and grant
Tower Rd. (SW 75 St.) At Oak Hall – SUNTRAIL gap on right At Oak Hall School (14th Ave); looking north. Existing 5 ft walk on left. SUNTrail $950,000 At Wiles Elementary $4.42 Million – General fund and grant FY 18 North of 24th Ave– SUNTrail gap on left
33
SW 8th Avenue Connector Project Description Budget Information Reconstruction and reconnection of SW 8th Avenue between Tower Road and SW 24th Ave with signalization and intersection improvements at SW 61st St/SW 24th Ave. Curb and gutter, multiuse paths, landscaping and transit improvements. Cost Estimate: $9,700,000 Status: Procurement
34
SW 61st St/20th Ave. Intersection
The proposed “build out” alternative at the intersection requires two southbound left turn lanes and one right-turn lane on SW 61st Street, two through lanes, one eastbound left-turn lane and one westbound right-turn lane on SW 20th Avenue. Coordination with RTS occurred and bus turnouts will be located where feasible based on the final design. The concept design shows an northbound, eastbound and westbound bus bay. Project Description Budget Information Cost Estimate: $3,800,000 Status: Procurement Intersection Signalization and improvements to SW 20th Ave and SW 61st Street including turn lanes and 4 lane of SW 20th Ave through intersection preparing for eventual 4 lane of 20th Ave bridge. Includes sidewalk connections on SW 20th Ave.
35
SW 8th Avenue Extension Project Description Budget Information Extension of SW 8th Ave between SW 122nd St and SW 143rd St. Two travel lanes, bike lanes multiuse path, lighting and street trees. Currently in two phases with Town of Tioga under contract to complete Eastern Phase (currently under construction) Cost Estimate: $8,961,643 Status: Pending Final Design and Right of Way Acquisition
36
SW 8th Avenue Extension, Connector & Intersection
$22.4 Million – Impact fee & MMTM (SW), UF, General Fund, Sales Tax, Gas Tax, Grants and Bond. FY 18 thru FY 20
37
NW 43rd St W Newberry Rd to NW 11th Pl Mill & Resurface
Cost: $7,000,000 General Fund FY 18 (Pending) NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles
38
NW 43rd St – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
39
CR 2082 SE Hawthorne Rd to CR 234 Pavement to Chip seal Cost: $470,000
General fund FY 18 (Pending) NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
40
CR 2082– Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
41
NW 94th Ave. & NW 266th St. US 27/41 to NW 86th Ave Chip seal
Cost: $150,000 General fund FY18 (Pending) NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
42
NW 94th Ave. & NW 266th St. – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
43
NW 62nd Ave CR 235 to US 27/41 Chipseal Cost: $300,000 General fund
FY18 (Pending) NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
44
NW 62nd Ave – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
45
NW 16th Ave. NW 13th St to NE 2nd St Mill & Resurface Cost: $1,160,000
General Fund FY19 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
46
NW 16th Ave. – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
47
NW 32nd Ave. NW 186th St to NW 143 St Full Depth Reclamation
Cost: $1,370,000 General fund FY 19 I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
48
NW 32nd Ave. – Existing Conditions
NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
49
SW 170th St Levy County to SR 45 Widen, mill & resurface
Cost: $4.79 Million Grant and general fund FY 20 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
50
SW 170th St – Existing Conditions
City Limits: 1.3 miles Outside City Limits: 2.9 miles Total: 4.2 miles NW 227th Drive US 441
51
W University Ave. SW 75th St to the east end Mill & Resurface
Cost: $290,000 General fund FY 21 I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
52
W University Ave. – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
53
CR 219A US 301 to SR 26 Full Depth Reclamation Cost: $3,350,000
General fund & 5-cent gas tax FY 21 I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
54
CR 219A – Existing Conditions
NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
55
CR 235 Newberry Rd to CR 241 Mill & resurface Cost: $6.5 Million
5-cent gas tax FY 21 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
56
CR 235 – Existing Conditions
City Limits: 1.3 miles Outside City Limits: 2.9 miles Total: 4.2 miles NW 227th Drive US 441
57
SW 170th St SW SR 45 to W Newberry Rd Full Depth Reclamation
Cost: $4,190,000 General fund & 5-cent gas tax FY 22 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
58
SW 170th St – Existing Conditions
City Limits: 1.3 miles Outside City Limits: 2.9 miles Total: 4.2 miles NW 227th Drive US 441
59
Tower Rd. 4 lane section from SW 8 Ave to W Newberry Rd
Mill & Resurface Cost: $1,510,000 General fund & 5-cent gas tax FY 22 I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
60
Tower Rd. – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
61
Ft Clarke Blvd Newberry Rd to NW 23rd Ave Mill & Resurface
Cost: $690,000 General fund & 5-cent gas tax FY 22 I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
62
Ft Clarke Blvd – Existing Conditions
Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
63
SE & SW Wacahoota Rd. S US Highway 441 to SW Williston Rd
Full Depth Reclamation Cost: $2,830,000 General fund & gas tax FY 22 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
64
SE & SW Wacahoota Rd – Existing Conditions
NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
65
Other Projects Capital Bridge Maintenance - $636K – General Fund
Signal Replacements - $330K – General Fund CR 231 Guardrail - $250K – 5 cent gas tax NW 16th Ave Mid-block Crossings & Traffic Calming - $150K - 5 cent gas tax Bike/ped Projects - $2.3M – Grants Safety Projects - $154K - Grants NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
66
E-mail: rgavarrete@alachuacounty.us E-mail: jharriott@alachuacounty.us
Contact Information Ramon D. Gavarrete, P.E. County Engineer Office: (352) Cell: (863) James K. Harriott, Jr., P.E. Deputy County Manager Office: (352) Cell: (941) I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
67
QUESTIONS Public Works Department July 12, 2017
68
Other Projects – Not 100% Funded
Public Works Department July 12, 2017
69
NW 23rd Ave. Corridor Widening
The proposed “build out” alternative at the intersection requires two southbound left turn lanes and one right-turn lane on SW 61st Street, two through lanes, one eastbound left-turn lane and one westbound right-turn lane on SW 20th Avenue. Coordination with RTS occurred and bus turnouts will be located where feasible based on the final design. The concept design shows an northbound, eastbound and westbound bus bay.
70
NW 23rd Ave. Corridor Widening
The proposed “build out” alternative at the intersection requires two southbound left turn lanes and one right-turn lane on SW 61st Street, two through lanes, one eastbound left-turn lane and one westbound right-turn lane on SW 20th Avenue. Coordination with RTS occurred and bus turnouts will be located where feasible based on the final design. The concept design shows an northbound, eastbound and westbound bus bay. Estimated Cost: $12,800,000
71
SW 34th St/ SW 63rd Ave SR 121 to US 441 Full Depth Reclamation
Cost: $850,000 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
72
NW 83rd St NW 23rd Ave to NW 39th Ave Mill & Resurface Cost: $800,000
NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
73
NW 98th St Newberry Rd to NW 39th Ave Mill & Resurface Cost: $800,000
NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
74
Other Projects SW 20th Ave Bridge Widen &Replacement - $13 M
CR 234 Bridge Replacement - $1 M Graded Road Surface Treatment Program - $2.5 M Signal Replacement - $2 M Bike/ped Projects - $3.5 M Roadway Resurfacing Backlog NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
75
E-mail: rgavarrete@alachuacounty.us E-mail: jharriott@alachuacounty.us
Contact Information Ramon D. Gavarrete, P.E. County Engineer Office: (352) Cell: (863) James K. Harriott, Jr., P.E. Deputy County Manager Office: (352) Cell: (941) I-75 NW 202nd St Poor Pavement condition: 3.2 miles Decent Pavement condition: 1 mile Total: 4.2 miles US 441
76
QUESTIONS Public Works Department July 12, 2017