Status of the forward tracker design
J. Smyrski Institute of Physics UJ Report from the forward tracker meeting in Krakow, 16,17 Nov. 09 Tracking Meeting, GSI, 9 Dec. 2009
2
Space foreseen for tracking stations
DC1, DC2 DC3, DC4 DC5, DC6 (from the PANDA Magnet TDR) width and height of the experimental hall x = ± 5000 [mm] y= (-3500, 5000) [mm] B. Lewandowski, TB-meeting, z(DC1) = (6050, 6250) [mm] z(DC2) = (7450, 7650) [mm] PANDA drawing v gap in the dipole magnet including the cut-out for detector frames x = ±1550 [mm] y= ±(tg(5º)·z + 55) [mm] z = (3930, 4770) [mm] rectangular opening in the muon filter x = ±770 [mm] y = ±520 [mm] z = ?
3
Choice of wire inclination
Particles: 0.5 GeV/c muons Dipole magnet setting: for 7.8 GeV/c beam 5 deg. inclination chosen
4
Configuration of double layers
+5 -5 0 0 -5 +5 → Configuration better suited for fast track reconstruction with vertical straws
5
Active areas of the tracking stations
(Conservative choice) Tracking station Number of modules w [mm] h [mm] 1 2 3 4 5 6 4x8 =32 4x12 =48 4x25 =100 4x37 =148 1298 1944 4045 5984 640 690 767 1180 1480 Total number of modules: 408 Total number of straw tubes: 336 x 32 = 13056
6
Required simulations to determine needed active area of DC5 and DC6
Bl = 2 Tm, p(μ) = 1.5 GeV/c DC6 DC5 DC4 DC3 DC2 DC1
7
Intensity distributions 0
Intensity distributions GeV/c pions emitted isotropically from the target) 1.5 GeV/c pions
8
nedeed number of layers in tracking stations (3, 4 double layers ?)
6 stations x 4 double layers = 24 double layers = 48 layers (overkill?) -> check reconstruction efficiency, momentum resolution assuming detection efficiency for single layer of 98%, 95%, 90%..
9
reduction of width of the forward TOF-wall compensated by increase of side walls
3200
10
Openings for the beam pipe
Tracking station beam pipe 1, mm 3, mm 5, mm
11
Parameters of the openings
12
Mechanical design - DC3, DC4 – Krakow DC5, DC6 – Ferrara
13
Mechanical design – DC3, DC4
Frame with to double layers 2x 0º ±5º 2x 0º ±5º (Opening for beam pipe not designed yet)
14
Positioning of modules on support frame
15
Current design of straw module
17
Further topics Suggestion to change acronym of the tracking stations from „DC” to „FT” (Forward Tracker) Decision to continue development of new end-plugs for straws
18
Backup slides
19
Inclination, coordinates and length of straw modules
20
Intensity distributions 0
Intensity distributions 0.3 GeV/c pions emitted isotropically from the target)
21
0.75 GeV/c pions
22
1.2 GeV/c pions
23
1.5 GeV/c pions
24
3.0 GeV/c pions
25
7.5 GeV/c pions
26
10.5 GeV/c pions