Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of the forward tracker design

Similar presentations


Presentation on theme: "Status of the forward tracker design"— Presentation transcript:

1 Status of the forward tracker design
J. Smyrski Institute of Physics UJ Report from the forward tracker meeting in Krakow, 16,17 Nov. 09 Tracking Meeting, GSI, 9 Dec. 2009

2 Space foreseen for tracking stations
DC1, DC2 DC3, DC4 DC5, DC6 (from the PANDA Magnet TDR) width and height of the experimental hall x = ± 5000 [mm] y= (-3500, 5000) [mm] B. Lewandowski, TB-meeting, z(DC1) = (6050, 6250) [mm] z(DC2) = (7450, 7650) [mm] PANDA drawing v gap in the dipole magnet including the cut-out for detector frames x = ±1550 [mm] y= ±(tg(5º)·z + 55) [mm] z = (3930, 4770) [mm] rectangular opening in the muon filter x = ±770 [mm] y = ±520 [mm] z = ?

3 Choice of wire inclination
Particles: 0.5 GeV/c muons Dipole magnet setting: for 7.8 GeV/c beam 5 deg. inclination chosen

4 Configuration of double layers
+5 -5 0 0 -5 +5 Configuration better suited for fast track reconstruction with vertical straws

5 Active areas of the tracking stations
(Conservative choice) Tracking station Number of modules w [mm] h [mm] 1 2 3 4 5 6 4x8 =32 4x12 =48 4x25 =100 4x37 =148 1298 1944 4045 5984 640 690 767 1180 1480 Total number of modules: 408 Total number of straw tubes: 336 x 32 = 13056

6 Required simulations to determine needed active area of DC5 and DC6
Bl = 2 Tm, p(μ) = 1.5 GeV/c DC6 DC5 DC4 DC3 DC2 DC1

7 Intensity distributions 0
Intensity distributions GeV/c pions emitted isotropically from the target) 1.5 GeV/c pions

8 nedeed number of layers in tracking stations (3, 4 double layers ?)
6 stations x 4 double layers = 24 double layers = 48 layers (overkill?) -> check reconstruction efficiency, momentum resolution assuming detection efficiency for single layer of 98%, 95%, 90%..

9 reduction of width of the forward TOF-wall compensated by increase of side walls
3200

10 Openings for the beam pipe
Tracking station beam pipe  1, mm 3, mm 5, mm

11 Parameters of the openings

12 Mechanical design - DC3, DC4 – Krakow DC5, DC6 – Ferrara

13 Mechanical design – DC3, DC4
Frame with to double layers 2x 0º ±5º 2x 0º ±5º (Opening for beam pipe not designed yet)

14 Positioning of modules on support frame

15 Current design of straw module

16

17 Further topics Suggestion to change acronym of the tracking stations from „DC” to „FT” (Forward Tracker) Decision to continue development of new end-plugs for straws

18 Backup slides

19 Inclination, coordinates and length of straw modules

20 Intensity distributions 0
Intensity distributions 0.3 GeV/c pions emitted isotropically from the target)

21 0.75 GeV/c pions

22 1.2 GeV/c pions

23 1.5 GeV/c pions

24 3.0 GeV/c pions

25 7.5 GeV/c pions

26 10.5 GeV/c pions


Download ppt "Status of the forward tracker design"

Similar presentations


Ads by Google