Test beam straw prototype production status
Speaker: Konstantin Vorobev (National Research Nuclear University MEPhI), Viktor Kramarenko (M.V. Lomonosov Moscow State University) Petr Teterin (National Research Nuclear University MEPhI) Konstantin Zhukov (P.N. Lebedev Institute of Physics)
2
Set Up & Read Out Read Out Read Out Read Out ch#1 ch#10 or N ch#2
Layer 10 or N Layer 1 Layer 2 Layer 3 Layer.. d d ≥ 45 mm Read Out ch#1 Read Out ch#2 Read Out ch#10 or N TRD_SAS WS: Test Beam 2017 28th of March Prototype with different count of modules of straw
3
Gas distribution Flow in
Inside module gas flow going parallel to each straw From module to module it is step by step. Gas flow Flow out TRD_SAS WS: Test Beam 2017 28th of March
4
Electronics boards for amplifiers & connectors
Signals Signals Read Out with Amplifiers Signals from straws HV HV to straws TRD_SAS WS: Test Beam 2017 28th of March
5
How its looks on the basement stand now
The prototype construction is based on «lego» principle 1 of 10 modules is ready at the moment Straws with manifolds Ground shielding TRD_SAS WS: Test Beam 2017 28th of March
6
Module of prototype part only
The module has been tested with single-channel readout TRD_SAS WS: Test Beam 2017 28th of March
7
Components table Mechanical Straws Electronics Components Description
Status / Quantity Mechanical Profile support Bosch, 30x30 mm done Ground shielding for electronics & straw Mounting & basement stand double Bosch, 30x30 mm Box for HV BNC & LV Lemo connector - Straws Straws tube TRT, size ~ 100 mm End plug & pins special production size done / for 7 modules Manifolds Electronics Altium design sent to production ReadOut and power connection 1st plate production done / 1 plate Channel electronic checking & Amplifiers HV BNC & LV Lemo BNC & Lemo to Electric tail TRD_SAS WS: Test Beam 2017 28th of March