1 Waste to Energy BARUERI
Sabesp Waste to Energy BARUERI

2 Current Treatment Flow
Evolution of the Treatment – Metropolitan Region Current Treatment Flow Treatment Capacity

3 Sabesp TIETÊ PROJECT Sabesp accounted for 37% of the sanitation investments made by brazilian state companies, from 2011 to 2014. The Tietê Project is the largest environmental Program in Brazil. In 1992, when the project was implemented, 70% of sewage was collected, and 24% was treated and the pollution reached an extension of 530 km (50% of the length of the river). In 2015 – the sewage collection was 84% , the sewage treatment was 68% and the pollution reduced to a km.

4 Sabesp PRINCIPAL PLANTS Q = 16m³/s Q = 2.5 m³/s Q = 1.5 m³/s
Barueri Started in 1988 Pq. N. Mundo Started in 1998 S.Miguel ABC Started in 1998 Suzano 1982 Q = 16m³/s Q = 2.5 m³/s Q = 1.5 m³/s Q = 3 m³/s

5 Sabesp WTP BARUERI ETE Barueri

6 Sabesp WTP BARUERI . Population Served …………………… 4,460,000 inhabitants
. Treatment Capacity ……….………..… 11.0 m³/s (after january/2017) .Treatment Capacity ……….………..… 16.0 m³/s (after april/2017) . Average Flow ………………………… 10.5 m³/s

7 Sabesp WTP BARUERI 11 - Pumping stations 245 km - network

8 WTE BARUERI THE PROJECT
PROVISION OF ENVIRONMENTALLY SOUND FINAL DISPOSAL SERVICES FOR WASTE GENERATED IN THE PROCESSES EMPLOYED IN SEWAGE TREATMENT, PRECEDED BY THE EXPLOITATION OF ENERGY POTENTIAL THROUGH THE USE OF BIOGAS AND SLUDGE FROM THE FACILITIES OF ETE BARUERI.

9 WTE BARUERI MT – Metropolitan Wastewater Treatment Business Unit
ABC NOVO MUNDO SÃO MIGUEL SUZANO SISTEMAS ISOLADOS The generated amount of sewage sludge grows in proportion to the increase in the sewage collection and treatment services, which, in turn, should accompany the population growth.

10 WTE BARUERI Current Situation – Sludge to landfills
Essencis Bandeirantes CDR ETE S.Miguel ETE Barueri ETE PNM ETE Suzano High costs and shortage of areas, either due to the end of useful life of those landfills or the excessive distance from those areas to the treatment plants. ETE ABC CTL São João

11 WTE BARUERI Sludge Production (Barueri)

12 WTE BARUERI Idea - SUSTAINABLE SEWAGE SLUDGE. BIOGAS and SLUDGE are proprietary assets. GRANTING OF THE RIGHT TO EXPLOIT THE USE OF ENERGY POTENTIAL.

13 WTE BARUERI

14 Solution WTE BARUERI CONTRACT SCOPE SLUDGE / BIOGAS EPBL ELECTRICITY
WASTE DULY TREATED FOR FINAL DISPOSAL ELECTRICITY

15 WTE BARUERI Required Scope Thermal drying of 500 tons / day of SLUDGE to convert them into DRY SLUDGE ELECTRICITY Production from Biogas processing obeying the following assumptions. Maintaining the temperature of the raw sludge stored within the currently existing digesters in the range of 35 °C to 37 °C by suppling thermal energy. Treat and allocate an environmentally appropriate way to all waste generated in the processes in place.

16 WTE BARUERI Obligations of Sabesp:: Digested Sludge supply ; quantity and quality. Biogas Delivery to the specified quality and in the following amounts: Up to 50,000 Nm3 / day from 1st to 5th year. Up to 100,000 Nm3 / day from the 6th year.

17 “Wastewater Treatment, is an important energy source”
WTE BARUERI INNOVATION PROJECT TO SANITATION SECTOR WIN WIN WIN SABESP Energy Plant SOCIETY “Wastewater Treatment, is an important energy source”

18 Thank you !!! Nivaldo Rodrigues da Costa Junior Head of Department
WTE BARUERI Nivaldo Rodrigues da Costa Junior Head of Department Metropolitan Wastewater Treatment Business Unit - MT Thank you !!!


Download ppt "Waste to Energy BARUERI"

Similar presentations


Ads by Google