1 AGENDA INDUSTRIAL DAY – Rome 25.01.2017
4 novembre 2015 INDUSTRIAL DAY – Rome AGENDA 1) – IDENTIFICATION OF THE MOST SIGNIFICANT SUPPLIES 2) – MANUFACTURER REQUIREMENTS 3) – CONTRACTUAL CONDITIONS

2 PART 1 - IDENTIFICATION OF THE MOST SIGNIFICANT SUPPLIES :
4 novembre 2015 INDUSTRIAL DAY – Rome PART 1 - IDENTIFICATION OF THE MOST SIGNIFICANT SUPPLIES : MATERIAL REQUISITION LIST TYPE OF ACTIVITY ITEM DESCRIPTION 1 MECHANICAL AZIMUTH/ALTITUDE CABLE WRAPS 2 ENCODER SYSTEM 3 AZIMUTH & ALTITUDE DRIVE SYSTEM 4 METROLOGY TILTMETERS 5 DOME SEALING SYSTEM 6 HYDROSTATIC BEARING PADS 7 OIL HYDRAULIC SYSTEMS FOR PADS 8 AZIMUTH & ALTITUDE BRAKE SYSTEMS 9 AZIMUTH & ALTITUDE LIMIT SYSTEMS 10 AZIMUTH & ALTITUDE LOCKING PIN 11 M5 SWITCHING MECHANISM 12 WIND SCREEN 13 LIFTS 14 MASS DUMMIES 15 ELECTRICAL WIRE ROPE WINCHS 16 CHILLERS UNITS 17 AIR COMPRESSOR 18 PUMPS 19 DRY COOLERS 20 FIRE BLADES & DAMPERS 21 AIR TREATMENT UNITS 22 AIR DUCTS 23 AIR DIFFUSERS, GRILLES 24 SPRINKLERS 25 HYDRANT & HOSE REELS 26 FIRE FIGHTING SYSTEM 27 FIRE FIGHTING PUMPS 28 MANUAL VALVES 29 ACTUATED VALVES 30 SAFETY VALVES 31 PIPING SUPPORT 32 METALLIC EXPANSION JOINT 33 PIPES & FITTINGS 34 MECHANICAL FIELD INSTRUMENTS 35 FAN FILTERS UNITS 36 FAN COILS AND HEATERS 37 TANKS & VESSELS 38 COMPRESSED AIR PIPES 39 PLATE HEAT EXCHANGER 40 LOUVERS SYSTEM 41 HANDLING 42 GEAR MOTOR SYSTEM FOR TROLLEY AND SLIT DOORS MECHANISMS 43 BRAKE SYSTEM TROLLEY AND SLIT DOORS MECHANISMS 44 ELECTRICAL DOME THERMAL CONTROL - HVAC REGULATION 45 EMERGENCY DIESEL GENERATOR 46 FIRE DETECTION SYSTEM 47 INVERTER 48 MV SWITCHGEAR 49 LV SWITCHGEAR 50 LV ELECTRICAL CABLES 51 MV ELECTRICAL CABLES 52 MV/LV TRANSFORMERS 53 FIBER OPTIC CABLE 54 CABLE TRAYS 55 EARTHING SYSTEM 56 UPS & BATTERIES 57 FIELD INSTRUMENTATION 58 LIGTHING SYSTEM 59 LIGTHINING AND LAMP PROTECTION SYSTEM 60 SLIP RINGS 61 BUSBARS 62 ELECTRICAL ACCESSORIES 63 SPECIAL CABLE FOR CABLE CHAIN 64 LV INSTRUMENTATION CABLE 65 SERVICE CONNECTION POINT 66 LOCAL CONTROL SYSTEM 67 CIVIL DOORS & WINDOWS 68 GATES 69 SEISMIC DEVICE 70 CLEAN ROOMS 71 FINISHING MATERIALS 72 FALSE CEILING 73 FLOOR CEILING 74 PARTITIONS (REI 120) 75 CONCRETE PREFABRICATED TRENCH 76 STEEL STRUCTURE - (SHEET PLATES, PROFILES, PIPES, …) 77 STEEL STRUCTURE -BOLTS 78 STEEL STRUCTURE -ANCHOR BOLTS 79 STEEL STRUCTURE -PAINTING 80 STEEL STRUCTURE 81 STEEL STRUCTURE -ACCESS 82 STEEL STRUCTURE -RAILS FOR HANDLING 83 CLADDING SYSTEM 84 STEEL STRUCTURE FOR TROLLEY AND SLIT DOORS MECHANISMS 85 WHEELS FOR TROLLEY AND SLIT DOORS MECHANISMS

3 4 curved sectors, each over 40m long and 10m high
4 novembre 2015 INDUSTRIAL DAY – Rome WINDSCREEN 4 curved sectors, each over 40m long and 10m high Made with aluminium tubes and pierced aluminium panels for wind speed reduction

4 Sandwich panels, for thermal insulation and air tightness
4 novembre 2015 INDUSTRIAL DAY – Rome CLADDING Over m2 of cladding Sandwich panels, for thermal insulation and air tightness

5 About 240m total length of cable wraps
4 novembre 2015 INDUSTRIAL DAY – Rome CABLE WRAP For relative movement of cables and pipes between fixed and moving Azimuth and Altitude structures About 240m total length of cable wraps

6 Fail safe brakes for operation, emergency and parking functionality
4 novembre 2015 INDUSTRIAL DAY – Rome BRAKE SYSTEM Fail safe brakes for operation, emergency and parking functionality Around n.44 callipers for Azimuth and around n.34 half callipers for Altitude

7 DRIVE SYSTEM Direct Drive Linear Motors
4 novembre 2015 INDUSTRIAL DAY – Rome DRIVE SYSTEM Direct Drive Linear Motors Around n.24 segments for Azimuth structure Around n.16 segments for Altitude structure

8 HYDROSTATIC BEARING SYSTEM
4 novembre 2015 INDUSTRIAL DAY – Rome HYDROSTATIC BEARING SYSTEM Altitude Pads Azimuth Pads Support Azimuth and Altitude structures and allow a very low friction movement Around 120 pads (Az & Alt) + 1 Oil Power Unit + relevant hydraulic instrumentation

9 LOUVERS About 1200m2 of total free surface to be guaranteed
4 novembre 2015 INDUSTRIAL DAY – Rome LOUVERS Motorized, thermally insulated and watertight / air-tight louvres About 1200m2 of total free surface to be guaranteed

10 PART 2 - Manufacturer Requirements
4 novembre 2015 INDUSTRIAL DAY – Rome PART 2 - Manufacturer Requirements 1) – Proven past experience with hard climatic condition: High altitude environment (3060m) with Strong winds up to 45m/s Wide temperature range (-15°C to +25°C) Extremely low humidity (down to 3%) with a median relative humidity of 15% High ozone concentration up to 180µg/m3 Lifetime of polymeric, rubber and plastic materials heavily affected ONLY QUALIFIED MATERIAL

11 PART 2 - Manufacturer Requirements
4 novembre 2015 INDUSTRIAL DAY – Rome PART 2 - Manufacturer Requirements 2) – Good post order service and/or representative service in Chile

12 PART 2 - Manufacturer Requirements
4 novembre 2015 INDUSTRIAL DAY – Rome PART 2 - Manufacturer Requirements 3) – Language required:

13 PART 3 - Contractual Conditions
4 novembre 2015 INDUSTRIAL DAY – Rome PART 3 - Contractual Conditions 1) – Payment Terms in relation of the principal manufacturer’s milestone 2) – Avoiding the using of Letter of Credit 3) – Declaration of the country for the main activities 4) – Guarantee 5) – Confidentiality 6) – Delivery Point Ex-work loaded (incoterms 2010) 7) – Spare parts for 5 and 15 years (as option) 8) – Supervision at the site installation & start-up activities (as option)

14 4 novembre 2015 INDUSTRIAL DAY – Rome 1) – Payment Terms in relation of the principal manufacturer’s milestone E-ELT PROJECT - MANUFACTURING MILESTONE FOR CENTRIFUGAL PUMPS - SUBCONTRACT N. XXXXXX TIME 0 TIME 0 + X PROTOTYPE ITEM SUBCONTRACT ISSUE DATE FIRST ISSUE AND APPROVAL OF THE FIRST TEC. DOCS ISSUE OF THE SUB-ORDERS FINAL ACCEPTANCE TEST AT MANUFACTURER PREMISES (MRR) PACKING INSPECTION (SRR) SUPPLY DELIVERY FINAL DOC. APPROVAL SITE ACCEPTANCE TEST GUARANTEE PERIOD

15 2) –Letter of Credit not accepted
4 novembre 2015 INDUSTRIAL DAY – Rome 2) –Letter of Credit not accepted

16 3) – Declaration of the country for the main activities
4 novembre 2015 INDUSTRIAL DAY – Rome 3) – Declaration of the country for the main activities

17 Guarantee Bond will required
4 novembre 2015 INDUSTRIAL DAY – Rome 4) – Guarantee 10 Years for all the Structural elements, Building and Cladding 3 Years for all the other Supplies Guarantee Bond will required

18 4 novembre 2015 INDUSTRIAL DAY – Rome 5) – Confidentiality

19 6) – Delivery Point Ex-work loaded (incoterms 2010)
4 novembre 2015 INDUSTRIAL DAY – Rome 6) – Delivery Point Ex-work loaded (incoterms 2010)

20 7) – Spare parts for 5 and 15 years (as option)
4 novembre 2015 INDUSTRIAL DAY – Rome 7) – Spare parts for 5 and 15 years (as option)

21 4 novembre 2015 INDUSTRIAL DAY – Rome 8) – Supervision at the site installation & start-up activities (as option)

22 Thanks https://cdn.eso.org/images/thumb300y/eso0104c.jpg