1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING

Similar presentations


Presentation on theme: "1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING"— Presentation transcript:

1 1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
City of Santa Monica ESA PCR October 20, 2016

2 Planning ProCess Community Meeting (August 25, 2016)
ARB Concept Design Review EIR Process Planning Commission Hearing to Consider Approval of Projects and EIR Coastal Commission Approval ARB Final Design Approval

3 Purpose of scoping meeting
Inform the public of the proposed projects Provide an overview of the environmental review process Identify environmental issues for analysis in the EIR Receive public comments regarding environmental topics, issue of concern, and alternatives to be evaluated

4 Project locations

5 Existing Project Sites
Ocean Avenue Pico Boulevard Bay Street

6 1828 Ocean Avenue Conceptual Site Plan

7 1828 Ocean Avenue Elevations

8 1828 Ocean Avenue Elevations

9 1921 Ocean Front Walk conceptual Site Plan

10 1921 Ocean Front Walk Elevations

11 1921 Ocean Front Walk Elevations

12 Project components Residential Units 83 22 105 Sf 88,135 41,779
Use 1828 Ocean Avenue 1921 Ocean Front Walk Total – Both Sites Residential Units 83 22 105 Sf 88,135 41,779 129,914 Restaurant/Cafes 1 tenant – 2,000 sf 2 tenants – 3,880 sf 3 independently operated restaurants – 5,880 sf Indoor 1,250 sf 2,910 sf 4,160 sf Outdoor 750 sf 970 sf 1,720 sf Parking 277 spaces (incl. 127 Casa del Mar valet) 61 spaces 338 spaces (incl. 127 Casa del Mar valet) Minimum Outdoor Living Area 8,300 sf 2,200 sf 10,500 sf Building Height 47 feet Total Area for Calculation of FAR 89,385 sf 44,689 134,074 SOURCE: Project plans current as of October 20, 2016.

13 California Environmental Quality Act (CEQA)
Purpose: to inform decision-makers and the public of a project’s potential physical effects on the environment Applies to discretionary projects Increases public understanding of and participation in environmental review process Discloses potential impacts on the environment Identifies ways to avoid or reduce potential significant impacts through feasible mitigation measures or alternatives

14 CEQA EIR is an informational document that represents “good faith” effort to disclose projects’ potential environmental impacts and identify ways to lessen such impacts CEQA does not deny or approve a project

15 Overview of CEQA Process
Notice of Preparation (NOP) Extended public comment period (9/13/16 through 10/27/16) Scoping Meeting Prepare & Publish Draft EIR 45-day public review Prepare & Publish Final EIR Response to comments on Draft EIR Corrections or additions to Draft EIR Planning Commission Considers Final EIR and Projects Certifies EIR If significant impacts, PC must make Findings, adopt a mitigation monitoring program, and adopt Statement of Overriding Considerations

16 The CEQA EIR Process Prepare/Distribute Notice of Preparation
(30-day review period extended to 44 days) Prepare Final EIR Including Response to Comments Public Scoping Meeting Review of Responses by Commenting Agencies Prepare Draft EIR Planning Commission Hearing Prepare Public Notice of Draft EIR Availability File Notice of Determination Public and Agency Review of Draft EIR (45 days) = Opportunities for Public Input

17 Preliminary scope: Environmental topics For Analysis in EIR
Aesthetics (including Shadows) Neighborhood Effects Noise Air Quality Population/Housing Cultural Resources Public Services (Fire/Police) Construction Effects Geology/Soils Transportation/Circulation Greenhouse Gas Emissions Utilities (Water/Sewer) Land Use and Planning Mandatory Findings of Significance

18 Contents of Draft EIR Description of the Projects
Existing Environmental and Regulatory Setting (baseline) Analysis of Projects Impacts on the Environment Based on CEQA Guidelines and Thresholds and substantial evidence in the record Includes analysis of cumulative impacts Feasible Mitigation Measures, as necessary Analysis of Reasonable Range of Alternatives

19 Opportunities for Public Comment
Public Comments on Scope, Focus, Content of EIR Provide comments at tonight’s meeting Form for written comments provided Turn in to staff Mail/drop off to City Hall comments Comments will be reviewed by EIR consultant and City to ensure that environmental issues/concerns are addressed in the EIR Comments accepted through October 27, 2016

20 Contact Information Please direct your comments to: Russell Bunim, Associate Planner City Planning Division City of Santa Monica 1685 Main Street, Room 212 Santa Monica, California 90407

21 Q&A/Public Comments Questions? Public Comments