Download presentation
Presentation is loading. Please wait.
1
ALICE planning meeting
2
ALICE planning meeting
Outline ALICE Christmas break schedule Access UX25, L3 and MNF Services interruption Gas, cooling and electricity DAQ and DCS plans Detectors activities Day-by-day schedule wks 49-7 Visits AOB 21/1/11 ALICE planning meeting
3
Christmas break schedule
Start on Tuesday, 7th December. End on Friday, 18th February Plan: Open both L3 doors Installation of 3 TRD and 6 EMCal modules 21/1/11 ALICE planning meeting
4
ALICE Christmas break schedule
Open L3 doors TRD Close Experiment EMCal Open Experiment Close L3 doors 21/1/11 ALICE planning meeting
5
ALICE planning meeting
Access restrictions The reasons to restrict the access are: Handling of shielding blocks Lowering of heavy structures (yellow-platform, TRD and EMCal rotators and modules) Installation of EMCal modules Removal of L3 ventilation Evacuation tests … The access restrictions concern the UX25 cavern, MNF, L3 and CRs SLIMOS shifts still missing in wks and 4-5 Indications are given (next slides) concerning the access during the whole break – more precise info will be discussed at 5 o’clock daily meetings 21/1/11 ALICE planning meeting
6
ALICE planning meeting
UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25 Gas functional test (10/ hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs) 21/1/11 ALICE planning meeting
7
ALICE planning meeting
L3 (and MNF) access No Ventilation 13 EMCal 3 No Ventilation 24 31 7 EMCal EMCal Evac. No Ventilation Lift Wks 50 and 5: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards 11/2-18/2: TPC Kr calibration: all detectors (mainly PMD, SSD, SDD, TRD and TOF) be switched on by Tue 8/2 and not change conditions anymore since then 21/1/11 ALICE planning meeting
8
Services interruption
9
Maintenance gas systems
New gas monitoring 13 Flowmeters Functional tests 13-15/12: Stop N2, CO2, Neon, Ar (24 hours max N2, CO2 and Neon) TRD backup (N2 bottle in CR5) – HMPID backup (Ar bottle in SG2) 12/1 (during the cooling stop): Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2) 21/1/11 ALICE planning meeting
10
Gas system status over Christmas
TPC: flush CO2 TRD: ON TOF: ON – stop 11-12/12 and during cooling stop (KNF pump stopped) HMPID: ON (Ar backup) PHOS: N2 flushing PMD: ON (except 11-12/12 – gas stop) Muon TRK: backup CO2 Muon TRG: backup Ar No flammable gases from 7 Dec until 25 Jan PM (after maintenance UX25, Muon TRK-TRG ventilation) 21/1/11 ALICE planning meeting Albin
11
Maintenance cooling units Cooling Plants and Primary Network
TPC Maintenance and consolidation L3 and Dipole 10 17 24 SSD/SDD TOF/PHOS EMC TRD TPC RR Chillers Cooling towers 12 TPC HMPID SPD 21 Maintenance on production network. No primary water from 12/1 (14:00) to 21/1 (AM) CR1-2-3, the Wiener PS and detector cooling plants affected (plants can RUN, but no cooling power). DCS will be kept running at all times (dedicated chiller) Maintenance on cooling plants. Replacement of pneumatic actuators for TOF/TRD/TPC plants + TOF/PHOS flowmeter. CP will be stopped during maintenance 21/1/11 ALICE planning meeting
12
Maintenance ventilation units
UX25, Muon TRK-TRG 17 12 SG2 L3 21/1/11 ALICE planning meeting
13
Safety and electrical systems
UX25 fire detect. 20 Evacuation PX24 fire detect. + red phones UPS SNIFFER mainten. UPS Auto-transfert DSS Evacuation LACS doors Evacuation Early morning/late evening (tbc) PX24 PAD 31 Lifts maintenance Guard 8-00 – 18-00 UPS Lifts maintenance AUG UX25 lift DSO 21/1/11 ALICE planning meeting
14
Safety and electrical systems Impact on ALICE
LHC evacuation tests (7/12 after 18:00 and 24/12 tbc) no access UX25 EN/EL: interruption on auto-transfert network (9/12 from 07:00 till 07:05): all wall outlets will be interrupted including all non-UPS outlets in the ACR (so essentially all WRs) including outlets SXL2, offices and barracks non-UPS power for the detector cooling plants will be interrupted power to all gas systems will be interrupted the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption the electronics racks in the cavern and CRs will not be affected. See DSS modification (13/1) Will stop the full DSS, trigger all interlocks, including stopping power to all racks EN/EL: AUG Test (20/1) (Arrêt Urgence General – General Emergency Stop) Major electrical perturbation. Also ACR affected 21/1/11 ALICE planning meeting
15
ALICE planning meeting
DAQ upgrade plans 21st Dec PM till the 04th Jan included The DAQ will be OFF during the CERN closure. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it. 5th to the 11th of January included DAQ restarted on the first working day for 1 week. The DAQ will be switched ON with the present version of all software. Allow a quick commissioning after the installation of new detector modules or the intervention on existing detectors. 12th to the 23rd Jan included The DAQ will be OFF during the cooling interruption at P2. DAQ renovated (see TB December) 24th January The DAQ will be ON again. It will run under SLC5 64 bits unless there would be an unexpected key problem. The electronic logbook will remain available during the whole period. When the DAQ will be OFF, it will be running in the DAQ lab in Meyrin. There will be a few hours of interruption to switch from P2 to Meyrin and back. 21/1/11 ALICE planning meeting Pierre/Uli
16
ALICE planning meeting
DCS plans Baseline: DCS will be operational all times where technically possible With ‘best effort’ support With access restrictions during CERN End-of-Year closure (22/12 – 4/1) Many activities and upgrades are planned Will be coordinated with individual detectors to minimise impact For central systems, as much as possible in shadow of other perturbations (e.g. cooling stop) Perturbations (e.g. for reboots etc.) cannot be excluded Detectors are invited to communicate ‘critical periods’, with services needed Will try to cater for detector needs as much as possible Known perturbations: Tue 7/12 10:00 – 12:00, interruptions of the GPN link to/from P2 Upgrade of router, test impact on ALICE Wk50 (13-17/12) – major updates to all PC (many perturbations to be expected) 12/1 – 21/1 (cooling stop), only minimal central services. All detector DCS switched off, except for special requests and if cooling power allows More detailed planning at weekly and daily meetings 21/1/11 ALICE planning meeting André / Peter
17
ALICE planning meeting
DCS plans (details) Wk 50 Mon 13/12 – Fri 17/12 (daytime): SW upgrades and patches to all systems (Operating system and PVSS) Delayed/extended due to problems with automatic PVSS upgrade procedure (several manual operations needed) Systems unavailable for short (~hrs) periods, frequent reboots Support to detectors restarting/testing their systems after upgrades Detectors shall test functionality as much as possible Wk 51 Contingency for system upgrades Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure Register with your SRC if you require access (see message Peter 2/12/2010) Wk 52 – Wk 01 Only ‘best effort’ support during CERN closure Wk 02 Wed 12/01 – (cooling intervention) shutdown of detector systems except special requests, within limits of cooling power 21/1/11 ALICE planning meeting André / Peter
18
Access request Cavern and surface
You should submit an ADI and a task procedure Attach task procedure Work breakdown structure – risk associated at each step Two persons minimum ADI Task procedure Template EDMS 21/1/11 ALICE planning meeting
19
Detectors activities
20
ALICE planning meeting
EMCal Status of modules: 6 modules in SXL2 Test station installed in SXL2 Requiring a lot of access to connect everything up, test, and debug as they commission the new SMs Low voltage, high voltage (CR4), and DAQ operating as much as possible during the installation period in January. 21/1/11 ALICE planning meeting
21
ALICE planning meeting
EMCal Surveys Zero measurement (wk 51-52), after insertion of 1st module and after the insertion of 2nd module: A-side: CALframe feet and rails + modules (adaptors) C-side (photogrammetry - 1/2 day) After insertion of 3rd, after insertion of 4th and after insertion of 5th module: A-side: points chosen depending on results previous survey C-side: with theodolite from A-side (or full photogrammetry, depending on results previous survey) After insertion of 6th module: A-side: full C-side: full 21/1/11 ALICE planning meeting
22
ALICE planning meeting
PMD Wk 50: Lift CROCUS (in order to open L3 doors) - can be done by P2 technicians disconnect cables (after 16/12) Wk 51 (20/1): move PMD in parking position (Pieter) Wks 51-3 SPIE: new air cooling system – major installation work in January (should be done by end January) Wks 51-4: repair electronics chains Need Ar/CO2 at all times Wk 4: 24/1 CROCUS platform re-installed Wk 4 (normal hours if compatible with L3 + PMD duct installation, otherwise after 18:00): access to CROCUS Wk 5 (after 18:00): access to CROCUS; 31/1 PM: start new cooling system; 1-2/2: test detector with new cooling; 3/2 (or later, in wk 6): move PMD to final position Wk 7: survey of PMD 21/1/11 ALICE planning meeting
23
ALICE planning meeting
TOF/PHOS TOF: HV hardware checks on SM13 (December) TRM replacement (14 TRMs on the A side) (3/01 – 12/01) Replacement DC-DC (with no LV spare channels): 16/12 (after 18:00) PHOS: (A.Vinogradow at CERN 1/12 end January) Investigate module 2 pedestal issues Try to understand behavior of unstable branch in Module 3 Remake ISEG crate to connect to the hardware interlock Maintenance crystal cooling plant (January) 21/1/11 ALICE planning meeting Gilda/Yury
24
ALICE planning meeting
Muon TRG RPC Detector/gas system: Check gas leak on few RPC detectors and repair 2 gas distribution channels. Replacement of 1 HV cable. From Monday 10/01 (afternoon) to Friday 14/01 Upgrade Sensor gas humidity and pressure regulator (CR5, schedule to be defined with the gas team) Replace few RPC modules with high current: under discussion Will restart the flammable gas flow at end of January/beginning of February, to check the detectors with HV at least 15 days before the first beam injection Electronics: Maintenance Local decision electronics (December 8th after 18:00) Done Upgrade FE threshold distributors, higher segmentation (level 4 gangway, December 8th after 18:00) Done Upgrade firmware DARC and Regional board in order to speed up MTR decision electronics configuration (wk 6, after the DAQ upgrade) 21/1/11 ALICE planning meeting Pascal/Ermanno/Paolo/Anna
25
ALICE planning meeting
Muon TRK plans December: CROCUS firmware upgrade (protection against spurious busy reset signal): Access to Crocus, Dipole and FASS. Need nacelle wk 49 Done High occupancy bus patches: Remove one "bad" slat (and replace by one spare) to test it in lab Done Access to Dipole and to muon side with nacelle in December Done Fix all remaining “bad” slats in January, wks 2-5. Need local DAQ setup (2 tables) + ITECO 13 January: replacement 1 quadrant ST2 (faulty wires) Done Test spare quadrants in lab (December) 21/1/11 ALICE planning meeting Ermanno/Herve
26
ALICE planning meeting
ZDC plans Check platform displacement with survey One week – depending on surveyors availability 21/1/11 ALICE planning meeting Paolo
27
ALICE planning meeting
SPD cooling plans Wk 49 (8/12 after 18:00): cut pipes in order to open the doors Wks 2-3 (during cooling stop): wash 4 bad sectors (machine installed on I-side, close to HMPID pump). Access to the outer side of MNF (side I) to work on the heater of sector 0 (nacelle or scaffolding needed) Wks 3-4 (as soon as the door is closed): reconnect temporarily pipes and test with dummy sector inside MNF (in parallel with shielding in wk 4) 21/1/11 ALICE planning meeting
28
ALICE planning meeting
SSD/SDD SSD: Ton: remove a cooling pipe from SSD corrosion test setup (week 2) Replacement CAEN module (C-side) + repair bad temperature signal at the C-side (week 2) SDD: Calibration of 78 pressure sensors in L3 and on miniframe (January 12 to 14) 21/1/11 ALICE planning meeting
29
ALICE planning meeting
Activities planned from 7-19 December (after 18:00): Done Check/repair the amplifiers from A and C side (inside L3) Check the signal cables from A-side Check/repair fast electronics modules (racks O18-19) Need possibility to do standalone runs in parallel 21/1/11 ALICE planning meeting
30
TRD installation - weeks 51, 52
4 modules at P2 (SM2, SM11, SM 15 and SM16) Installation sequence: 16 → 15 → 11 (or 16 → 11 → 15) 2 technicians (Philippe and Didier) + Survey (Nail from 6/12) + TC permanently at P2 Connection done right after installation Survey: Space-frame deformations and displacement of beampipe (flange), miniframe and TPC feet. Before-after each insertion Modules (2 points/SM on 4/7 SM) in wk 50 Modules (3 points/SM on 10/10 SM) after EMCal (wk 3) 21/1/11 ALICE planning meeting
31
ALICE planning meeting
TRD Week 49: LV Wiener ~70 PSU Back-Plane modifications (to improve mechanical stability, same as TPC applied already) Netgear switches replacements (1 day) LV line fixation: installation of improved patch panels on front of module (C-side) and replacing cables Repair pretrigger (A-side, below PMD) – after 20/12 Week 1: Finalizing connections, start commissioning Week 2: Stable running with cosmics 3 to 4 weeks in January or February: Stable running with cosmics for alignment and with Krypton for gain calibrations (to be still discussed) 21/1/11 ALICE planning meeting
32
ALICE planning meeting
TPC Recover all water inside cooling plant (week 50) Replacement of 15 damaged FECs (equally distributed A-C sides) ~3 days per FEC. Therefore, we would like to use all available time slots where access to the L3 is possible At the end of this activity we will need a period of about 2 weeks where all aforesaid systems are available for final verification, and access to the TPC in case something is not working correctly. Kr data taking at the end of the shutdown, in wk 7 21/1/11 ALICE planning meeting
33
TPC Replacement of the laser
Start the dismantling of the Spectron laser (week 50, Th-Sat after 18:00): dismount back wall of laser hut (help of P2 technician) stop cooling water (help of P2 technician) prepare new water connection (electrical power should be OK) Install new Ekspla laser (week 1): remove old laser and install new (use crane to transport laser) connect cooling water (help of P2 technician) reinstall back wall (maybe after cutting a hole in it) Testing and alignment of new laser (week 2): possibility to run laser behind closed doors (inside hut) maybe install laser tube temporarily and shoot into TPC whenever compatible with other installation work Possible further testing and adjustment (week 3) 21/1/11 ALICE planning meeting Borge
34
ALICE planning meeting
ACORDE Check some ACORDE modules (PMTs optical conections, connectors, etc) above the magnet The plan is to start this activities on January 21st 21/1/11 ALICE planning meeting
35
ALICE planning meeting
Other activities SPIE + CV: refurbishment ITS dehumidifier in CR – February Replacement part at P2 in January. Installation – transport needed Recirculation air - SPIE New air-flowmeter (connect to ELMB: Frederick) EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker. VIC 16/12 10:30 – Intervention 11/1 whole day SPIE: cabling UX25-CR4 – 17/1 New magnet emergency buttons + flashing lights L3 and dipole Frederick: humidity sensor L3 ventilation (extraction) + redo CTP connectors Intervention on cavern lift. From 28/1 17:00 to 29/1 (whole day) One day stop – no access to UX25 21/1/11 ALICE planning meeting
36
ALICE planning meeting
Other activities Google propose to produce a custom Streetview application for CERN showing both outside and underground areas Visit Tuesday 21 December at 16:15 18/1 filming Philippe: replace rack filters during cooling stop. Install temporary line PHOS cooling (PS rack and crystal cooling plant). Clean all WIENER PS racks with special machine 21/1/11 ALICE planning meeting
37
Magnet control upgrade
Wk 49: nous devons intervenir dans la MCR pour: changement des alimentations 24V et 48 V des systèmes MSS et MCR (préventif) changement des modules convertisseurs PT100 des hots points du Solénoïde (correctif suite à deux incidents ayant entrainés l'arrêt du Solénoïde) et en UX25, comme Philippe Bouvier l'a déjà signalé: recâblage des AU du dipôle et du Solénoïde signalisation du champ magnétique du dipôle et du Solénoïde Nous étudions toujours une solution pour le monitoring des températures du Solénoïde. L'arrêt de fin d'année va permettre de faire une meilleure approche de ce qui est existant en UX25. En ce qui concerne l'alimentation électrique de la MCR, nous dépendons actuellement d'une seule source de courant sous UPS avec secours diesel. Afin d'établir une redondance pour l'alimentation de la MCR je souhaiterais installer une seconde source d'alimentation sous UPS. Je sais qu'une étude est faite à ALICE pour augmenter la puissance des UPS existants en 2012. Je souhaiterais que cette demande soit incluse pour le calcul de puissance des nouveaux UPS (besoin pour la MCR: 16A en monophasé) 21/1/11 ALICE planning meeting Pascal
38
Day-by-day schedule UX25 and MNF - Wk 49
39
ALICE planning meeting
Week /12 Monday Program 18:00: end HI program Ramp down both magnets. !!! Emergency dump !!! 18:00 – 22:00: access system test. No access UX25 22:00: RPE survey (Jiri + 2nd person) Then go to restricted mode 21/1/11 ALICE planning meeting
40
Activities in UX25 - Week 49 - 6/12 Monday
No access UX-25 - possibility of access from 22:00 TRD team at CERN: 6 to 10/12 ITECO It H HAULOTTE 21/1/11 ALICE planning meeting
41
Week 49 - 7/12 Tuesday Program
8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport, VAC, TC and RP) 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre) Collect RP samples (Fernando, Philippe) Survey L3 and Dipole 18: :00: evacuation test – No access UX25 From 21:00 - Cavern in General mode 14: :00: Portuguese Press visit. 10 persons 21/1/11 ALICE planning meeting
42
Week 49 - 7/12 Tuesday Activities
ALTEAD: PX24 shielding blocks – top layer removed 8:00 to 18:00: no access CR5 Reinstall crane electronics - Problems (ongoing) 14:00 to 15:00: put SM16 into the rotator - Ongoing VAC: Neon injection preparation - Started Transport needed (EDH ) – Rack moved by hand Remove “green fence” (P2 technician) - Done Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done 8:30: Lock L3+Dipole power converter + compensator magnet - Done Test transmission of alarm lift to FB - Done 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done (will install temporary line) 15:15: VIC SPD – Done + Gas VIC DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck. Investigating why MCR (Magnet Control Room): HW modifications (Pascal B.) – Started TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3) 21/1/11 ALICE planning meeting
43
Activities in UX25 - Week 49 - 7/12 Tuesday
TRD Wiener PS PX24 shielding: blocks It VAC H RP samples TRD Wiener PS 21/1/11 ALICE planning meeting
44
Week 49 - 8/12 Wednesday Program
8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport, VAC, TC and RP) From 18:00 - Cavern in General mode 18:00: Confined Space Training Tour in L3 at the end of the course 21/1/11 ALICE planning meeting
45
Week 49 - 8/12 Wednesday Activities
ALTEAD: PX24 shielding beams (35t) - Done 8:00 to 16:30: no access CR1-5 and Expo Move ITECO C-side - Ongoing EN-HE: Reinstall crane electronics – Done. Crane operational VAC: Neon injection – injection table prepared. Neon injected tomorrow afternoon Annular ion pump (PI.45.1L2.X) switched off Activities after 16:30: EN-CV: empty TPC tank - Ongoing TPC: replacement of damaged FECs (C-side) - Ongoing TRD: pretrigger PS work done. Wiener PS back-plane modification (SXL2, almost done). Start re-installing Wieners tonight. SPD: cut inox pipes - Done Muon TRK: CROCUS firmware upgrade Muon TRG: Maintenance Local decision electronics and upgrade FE threshold distributors – Done T0: investigation broken amplifier (MNF and L4-rack) - Ongoing 21/1/11 ALICE planning meeting
46
PX24 shielding: beams (35t)
Activities in UX25 - Week /12 Wednesday Move TRD Wiener PS T0 PX24 shielding: beams (35t) It VAC Muon TRK: CROCUS firmware upgrade TPC FEC and TRD LV Cut SPD pipes TPC cooling TRD Wiener PS Muon TRG 21/1/11 ALICE planning meeting
47
Activities in MNF - Week 49 - 8/12 Wednesday
21/1/11 ALICE planning meeting
48
Week 49 - 9/12 Thursday Program
8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport, VAC and TC) From 18:00 - Cavern in General mode Interruption on auto-transfert network (from 07:00 till 07:05). No access underground all wall outlets will be interrupted including all non-UPS outlets in the ACR (so essentially all WRs) including outlets SXL2, offices and barracks non-UPS power for the detector cooling plants will be interrupted power to all gas systems will be interrupted the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption the electronics racks in the cavern and CRs will not be affected. See 21/1/11 ALICE planning meeting
49
Week 49 - 9/12 Thursday Activities
ALTEAD: MNF shielding – 2/4 “T” blocks removed 8:00 to 18:00: No access CR1-5 during lifting up of 5 big beams Stabilizers (after 18:00) - OK Move ITECO I-side VAC: Neon injection – Beampipe under Neon RAMSES: removal of Data Acquisition modules CR5 - Done EMCal team at CERN: fit rollers on all SMs (SXL2). Start 13:30 - OK Dipole-Solenoid cooling stopped (Philippe) Purge TRD cooling flexibles + replace o-rings (Philippe + Frederick) - Done Activities after 18:00: TPC: replacement of damaged FECs (C-side) TRD: Wiener PS back-plane modification and LV consolidation (SXL2) Muon TRK: CROCUS firmware upgrade T0: investigation broken amplifier (MNF and L4-rack) 21/1/11 ALICE planning meeting
50
Activities in UX25 - Week 49 - 9/12 Thursday
TRD Wiener PS T0 Stabilizers It MNF shielding VAC Muon TRK: CROCUS firmware upgrade TPC FEC and TRD LV H Stabilizers H TRD Wiener PS Move No access CR1-5 during lifting up of 5 big beams 21/1/11 ALICE planning meeting
51
Activities in MNF - Week 49 - 9/12 Thursday
21/1/11 ALICE planning meeting
52
ALICE planning meeting
Week /12 Friday Program 8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport and TC) From 17:00 - Cavern in General mode 9:00 – 12:30: functional test gas systems 9:00 – 11:00: No access UX25 and CR1-5 All gas systems will be stopped-started several times Stop Ar/H2 at end of test 21/1/11 ALICE planning meeting
53
Week 49 - 10/12 Friday Activities
ALTEAD: MNF shielding: I-side wall EMCal: fit rollers on all SMs Maintenance PX24 MAD (transparent) Activities after 18:00: TPC: replacement of damaged FECs (C-side) TRD: Wiener PS back-plane modification and LV consolidation (L3) Muon TRK: CROCUS firmware upgrade T0: investigation broken amplifier (MNF and L4-rack) 21/1/11 ALICE planning meeting
54
Activities in UX25 - Week 49 - 10/12 Friday
TRD Wiener PS It TPC FEC and TRD LV MNF shielding LV156 H TRD Wiener PS 21/1/11 ALICE planning meeting
55
Activities in MNF - Week 49 - 10/12 Friday
21/1/11 ALICE planning meeting
56
Week 49 - 11/12 Saturday Program
8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport and TC) From 17:00 - Cavern in General mode 18 KV Autotransfert tests from 8h00 to 20h00 Frequent power cuts will occur on the Meyrin site. The group EN-EL recommends that you turn off all your critical equipment, computers and computer equipment. For any further information please refer to the "note de coupure": 21/1/11 ALICE planning meeting
57
Week 49 - 11/12 Saturday Activities
ALTEAD: MNF shielding: I-side wall Activities after 17:00: TRD: Wiener PS back-plane modification and LV consolidation (L3) 21/1/11 ALICE planning meeting
58
Activities in UX25 - Week 49 - 11/12 Saturday
TRD Wiener PS It TRD LV MNF shielding LV156 H TRD Wiener PS 21/1/11 ALICE planning meeting
59
Activities in MNF - Week 49 - 11/12 Saturday
21/1/11 ALICE planning meeting
60
Activities in UX25 - Week 49 - 12/12 Sunday
Access in general mode It H 21/1/11 ALICE planning meeting
61
Activities in MNF - Week 49 - 12/12 Sunday
Access in general mode 21/1/11 ALICE planning meeting
62
Day-by-day schedule UX25 and MNF - Wk 50
63
ALICE planning meeting
Week /12 Monday Access status: 8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: ALTEAD: MNF shielding: O-side wall Lift PMD CROCUS SPIE: removal L3 ventilation Philippe: cut SPD pipe (chillers) Activities after 18:00: TRD: access to L4 racks T0: investigation broken chains 21/1/11 ALICE planning meeting
64
Activities in UX25 - Week 50 - 13/12 Monday
No access L3 (no ventilation) It LV156 MNF shielding L3 ventilation LV156 H 21/1/11 ALICE planning meeting
65
No access L3 (no ventilation)
Activities in MNF - Week /12 Monday No access L3 (no ventilation) 21/1/11 ALICE planning meeting
66
ALICE planning meeting
Week /12 Tuesday Access status: 8: :00: UX25 cavern in Restricted mode No access UX25 (except Transport and TC) From 18:00 - Cavern in General mode No access L3 (no ventilation) Activities: ALTEAD: MNF shielding: O-side wall Opening I-side door done Gas upgrade (SG2): stop all gas systems Ar, CO2, N2 and Neon done. The others must be done on January 11!!! Evacuation all Ar/H2 bottles (Fayet, morning) X-ray at night SPIE: new PMD ventilation (removal filter) VIC at 10:00 Activities after 18:00: T0: investigation broken chains 21/1/11 ALICE planning meeting
67
MNF shielding (green bridges)
Activities in UX25 - Week /12 Tuesday Visit 13:30 (Karel) T0 No access L3 (no ventilation) It MNF shielding (green bridges) LV156 Open I-side door PMD ventilation H 21/1/11 ALICE planning meeting
68
T0 Activities in MNF - Week 50 - 14/12 Tuesday No access L3
(no ventilation) T0 21/1/11 ALICE planning meeting
69
ALICE planning meeting
Week /12 Wednesday Access status: Cavern in General mode Activities: ALTEAD: yellow-platform rails. Put YP on rails. Removal MNF staircase. Shielding on O-side gone TRD: test LV inside magnet TPC: replacement FE cards (C-side) Release all TOF crates supports (Yannick-Samuel) Gas upgrade (SG2): restart gas systems EN-CV: maintenance TRD cooling unit TPC laser: dismount back wall of laser hut + start removal laser TOF: removal DC/DC converters VIP visit: Finance and Council Delegates – 16:45 (1hour) 21/1/11 ALICE planning meeting
70
Release all TOF crates supports (Yannick-Samuel) + TOF DC/DC
Activities in UX25 - Week /12 Wednesday Access in general mode EMC Release all TOF crates supports (Yannick-Samuel) + TOF DC/DC It TRD cooling Laser TPC/TRD YP rails H 21/1/11 ALICE planning meeting
71
Removal MNF staircase Activities in MNF - Week 50 15/12 Wednesday
Access in general mode Removal MNF staircase (access with ladder) 21/1/11 ALICE planning meeting
72
ALICE planning meeting
Week /12 Thursday Access status: Cavern in General mode Arrival PMD team Visit (W.Riegler). 14:30 Activities: ALTEAD: yellow-platform rails Open O-side door – by afternoon SPIE: PMD ventilation Survey: baby-frame zero-measurement + TRD EN-EL: motorize L3-Dipole-Miniframe circuit breaker (T.Bourrel, VIC at 10:30) TRD: test LV inside magnet TPC: replacement FE cards (C-side) Release all TOF crates supports (Yannick-Samuel) Re-arrange TPC cooling pipes (MNF, Yannick) EN-CV: maintenance TRD cooling unit TPC laser: removal laser + take out laser-hut back door. Take out old power supply EMCal: installation HV PS (CR4) and LV PS (L4-O-side) Done 21/1/11 ALICE planning meeting
73
Release all TOF crates supports (Yannick-Samuel)
Activities in UX25 - Week /12 Thursday Access in general mode LV156 Open O-side door Release all TOF crates supports (Yannick-Samuel) It TRD cooling Laser Survey TPC/TRD PMD ventilation H EN-EL 21/1/11 ALICE planning meeting
74
TPC cooling pipes (Yannick)
Activities in MNF - Week /12 Thursday Access in general mode TPC cooling pipes (Yannick) 21/1/11 ALICE planning meeting
75
ALICE planning meeting
Week /12 Friday Access status: Cavern in General mode Visit (C-E.Sala) DAQ: the experiment logbook and data taking will be unavailable from 10:00 to 12:00 for a maintenance operation Arrival 2 (last) EMCal modules from Grenoble. Unload in SXL2 Activities: ALTEAD: lower TRD 16. No access low-beta platform SPIE: PMD ventilation Survey: baby-frame zero-measurement + TRD TRD: test LV inside magnet TPC: replacement FE cards (C-side, and A-side (tbc)) Decoupling TPC-Space-Frame (Yannick-Samuel) EMC: investigate a part of the EMCal readout that was noisy (~16 channels on one "T-card") (L3) PMD: disconnect services EN-CV: maintenance TRD cooling unit 21/1/11 ALICE planning meeting
76
Decoupling TPC-Space-Frame (Yannick-Samuel) & EMC
Activities in UX25 - Week /12 Friday Access in general mode Decoupling TPC-Space-Frame (Yannick-Samuel) & EMC It TRD cooling Survey TPC FEC TPC FEC PMD ventilation H 21/1/11 ALICE planning meeting
77
Disconnect PMD services
Activities in MNF - Week /12 Friday Access in general mode Disconnect PMD services 21/1/11 ALICE planning meeting
78
Decoupling TPC-Space-Frame (Yannick-Samuel)
Activities in UX25 - Week /12 Saturday Access in general mode Decoupling TPC-Space-Frame (Yannick-Samuel) It Survey H 21/1/11 ALICE planning meeting
79
Activities in MNF - Week 50 - 18/12 Saturday
Access in general mode 21/1/11 ALICE planning meeting
80
Activities in UX25 - Week 50 - 19/12 Sunday
Access in general mode TRD team at CERN: 19 (PM) to 23/12 It H 21/1/11 ALICE planning meeting
81
Activities in MNF - Week 50 - 19/12 Sunday
Access in general mode 21/1/11 ALICE planning meeting
82
Day-by-day schedule UX25 and MNF - Wk 51
83
ALICE planning meeting
Week /12 Monday GS/ASE: UX25 fire detection maintenance ALTEAD: unload in SXL2 2 EMCal modules Activities: TRD: installation BBF rails SR16-15 Survey: TRD and EMCal survey TPC: replacement 1 FE card (A-side) PMD+Pieter: move detector in parking position 21/1/11 ALICE planning meeting
84
Activities in UX25 - Week 51 - 20/12 Monday
TRD and EMCal Survey EMCal Survey (1/2 day) TPC FEC TPC FEC Prepare TRD 16 installation H 21/1/11 ALICE planning meeting
85
Move PMD in parking position
Activities in MNF - Week /12 Monday Move PMD in parking position 21/1/11 ALICE planning meeting
86
ALICE planning meeting
Week /12 Tuesday Google Streetview visit (5 people). 16:15 GS/ASE: UX25 fire detection maintenance DAQ: switch off DAQ. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it DCS: the access restrictions to the DCS network will be enforced from December 21st towards the end of working hours Activities: TRD: install TRD16 + insert TRD15 into rotator Survey TRD16 The beampipe (i.e. also ITS and TPC) have moved 0.35mm to the O-side and 0.14mm down during the installation of TRD16. This is consistent with Yannick’s measurements of the spaceframe position with respect to the backframe Philippe+Didier: removal ladder BKF PMD: replacement electronics chains 21/1/11 ALICE planning meeting
87
Activities in UX25 - Week 51 - 21/12 Tuesday
TRD Survey Install TRD 16 H 21/1/11 ALICE planning meeting
88
PMD: replacement electronics chains
Activities in MNF - Week /12 Tuesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
89
ALICE planning meeting
Week /12 Wednesday Visit: RIKEN RIBF Accelerator technical coordination group. Ken Oyama Activities: TRD: install TRD15 + connect TRD16 Philippe+Didier: removal ladder BKF PMD: replacement electronics chains 21/1/11 ALICE planning meeting
90
Activities in UX25 - Week 51 - 22/12 Wednesday
TRD Survey Install TRD 15 Connect TRD 16 H 21/1/11 ALICE planning meeting
91
PMD: replacement electronics chains
Activities in MNF - Week 51 22/12 Wednesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
92
Activities in UX25 - Week 51 - 23/12 Thursday
TRD Survey Connect TRD 15 H 21/1/11 ALICE planning meeting
93
PMD: replacement electronics chains
Activities in MNF - Week /12 Thursday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
94
Activities in UX25 - Week 51 - 24/12 Friday
LHC evacuation test. no access UX25 It H 21/1/11 ALICE planning meeting
95
Activities in MNF - Week 51 - 24/12 Friday
LHC evacuation test. no access UX25 21/1/11 ALICE planning meeting
96
Activities in UX25 - Week 51 - 25/12 Saturday
Christmas day It H 21/1/11 ALICE planning meeting
97
PMD: replacement electronics chains
Activities in MNF - Week /12 Saturday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
98
Activities in UX25 - Week 51 - 26/12 Sunday
TRD team at CERN: 26 to 30/12 It H 21/1/11 ALICE planning meeting
99
PMD: replacement electronics chains
Activities in MNF - Week /12 Sunday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
100
Day-by-day schedule UX25 and MNF - Wk 52
101
Activities in UX25 - Week 52 - 27/12 Monday
Diego at CERN (noon) Including installation BBF rails SR11 It Prepare TRD 11 installation TRD Survey Connect TRD 15 PMD ventilation H 21/1/11 ALICE planning meeting
102
PMD: replacement electronics chains
Activities in MNF - Week /12 Monday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
103
Activities in UX25 - Week 52 - 28/12 Tuesday
Prepare TRD 11 installation PMD ventilation H 21/1/11 ALICE planning meeting
104
PMD: replacement electronics chains
Activities in MNF - Week /12 Tuesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
105
Activities in UX25 - Week 52 - 29/12 Wednesday
Install TRD 11 TRD Survey PMD ventilation H 21/1/11 ALICE planning meeting
106
PMD: replacement electronics chains
Activities in MNF - Week 52 29/12 Wednesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
107
Activities in UX25 - Week 52 - 30/12 Thursday
Move EMCal rotator + SM5 onto low beta platform, and perform handling test Connect TRD 11 It EMCal infrastructure TRD Survey H 21/1/11 ALICE planning meeting
108
PMD: replacement electronics chains
Activities in MNF - Week /12 Thursday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
109
Activities in UX25 - Week 52 - 31/12 Friday
EMCal infrastructure H 21/1/11 ALICE planning meeting
110
PMD: replacement electronics chains
Activities in MNF - Week /12 Friday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
111
Activities in UX25 - Week 52 - 1/1/2011 Saturday
New Year day It H 21/1/11 ALICE planning meeting
112
Activities in MNF - Week 52 - 1/1/2011 Saturday
New Year day 21/1/11 ALICE planning meeting
113
Activities in UX25 - Week 52 - 2/1 Sunday
H 21/1/11 ALICE planning meeting
114
Activities in MNF - Week 52 - 2/1 Sunday
21/1/11 ALICE planning meeting
115
Day-by-day schedule UX25 and MNF - Wk
116
Activities in UX25 - Week 1 - 3/1 Monday
Lower SM6 onto low beta platform Move HAULOTTE SM5 Connect TRD 11 Install EMCal 40deg-C (PM) It H TOF TRM PMD ventilation 21/1/11 ALICE planning meeting
117
PMD: replacement electronics chains
Activities in MNF - Week 1 - 3/1 Monday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
118
Activities in UX25 - Week 1 - 4/1 Tuesday
SM6 Install EMCal 40deg-A (PM) It H EMC Survey (AM) EMC Survey TOF TRM PMD ventilation Reconnect PMD cooling 21/1/11 ALICE planning meeting
119
PMD: replacement electronics chains
Activities in MNF - Week 1 - 4/1 Tuesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
120
Activities in UX25 - Week 1 - 5/1 Wednesday
RAMSES: reinstallation of Data Acquisition modules CR5 Maintenance UPS ESS307/2X (transparent) EN-CV: maintenance chillers (transparent) GS/ASE: PX24 fire detection maintenance Lower SM7 onto low beta platform It H TPC FEC EMC Survey TPC RR cooling TOF TRM PMD ventilation 21/1/11 ALICE planning meeting
121
PMD: replacement electronics chains
Activities in MNF - Week 1 - 5/1 Wednesday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
122
Activities in UX25 - Week 1 - 6/1 Thursday
GS/ASE: PX24 fire detection + red phones maintenance Lower SM8 onto low beta platform EN-CV: maintenance chillers (transparent) SM7 Install EMCal 60deg-C It H TPC FEC EMC Survey TOF TRM TPC cooling PMD ventilation 21/1/11 ALICE planning meeting
123
PMD: replacement electronics chains
Activities in MNF - Week 1 - 6/1 Thursday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
124
Activities in UX25 - Week 1 - 7/1 Friday
GS/ASE: PX24 fire detection + red phones maintenance Lower SM9 onto low beta platform EN-CV: maintenance chillers (transparent) SM8 Install EMCal 60deg-A It H TPC FEC EMC Survey TOF TRM TPC cooling 21/1/11 ALICE planning meeting
125
PMD: replacement electronics chains
Activities in MNF - Week 1 - 7/1 Friday PMD: replacement electronics chains 21/1/11 ALICE planning meeting
126
Activities in UX25 - Week 1 - 8/1 Saturday
Visit (6 people at 15:30). P.Kuijer It H 21/1/11 ALICE planning meeting
127
Activities in MNF - Week 1 - 8/1 Saturday
21/1/11 ALICE planning meeting
128
Activities in UX25 - Week 1 - 9/1 Sunday
Visit (1 person at 11:00). C.Blume It H 21/1/11 ALICE planning meeting
129
Activities in MNF - Week 1 - 9/1 Sunday
21/1/11 ALICE planning meeting
130
Day-by-day schedule UX25 and MNF - Wk 2
131
Activities in UX25 - Week 2 - 10/1 Monday
VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25 Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda 14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda Philippe: install PHOS temporary cooling pipes Yannick: re-install TPC cooling pipes MNF (I-side) It H Laser TPC FEC Muon TRG: RPC (PM) TOF TRM TPC cooling SDD/ SSD Install new Ekspla laser Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles) SDD: calibration of 78 pressure sensors (10-12/1) SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side) 21/1/11 ALICE planning meeting
132
Activities in MNF - Week 2 - 10/1 Monday
21/1/11 ALICE planning meeting
133
Activities in UX25 - Week 2 – 11/1 Tuesday
EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side Visit (15 people at 14:00). Werner Power cut: 9:05 – 9:45 Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water 15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6 2 tables (DAQ) It H TRD cables Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC SPD cooling TOF TRM SSD/SDD cooling Use RED nacelle Wash 4 bad sectors SSD: removal of cooling pipe from corrosion test setup Move new laser down to platform 21/1/11 ALICE planning meeting
134
Activities in MNF - Week 2 - 11/1 Tuesday
21/1/11 ALICE planning meeting
135
Activities in UX25 - Week 2 - 12/1 Wednesday
Cooling towers maintenance (start 14:00) (No primary water) SNIFFER maintenance Maintenance UPS EBS106/2X and EBS128/2X (transparent) Lower SM10 onto low beta platform Cleaning rack filters (Philippe) PH-DT: new gas monitoring. Restart Ar/H2 afterwards Visit (P-A.Giudici + 3 persons) Euronews visit SM9 It Install EMCal 80deg-C H Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC EMC Survey TPC cooling SPD cooling 21/1/11 ALICE planning meeting
136
Activities in MNF - Week 2 - 12/1 Wednesday
21/1/11 ALICE planning meeting
137
Activities in UX25 - Week 2 - 13/1 Thursday
Cooling towers maintenance (No primary water) DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks EN/CV: maintenance SG2 ventilation RAMSES: radiation source tests SNIFFER maintenance Visit: (15 p.) Danish high school class (C. Søgaard) SM10 It H Install EMCal 80deg-A Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC EMC Survey TRD LV ST2 SPD cooling HMPID cooling ST2: replace chamber 3BR 21/1/11 ALICE planning meeting
138
Activities in MNF - Week 2 - 13/1 Thursday
PMD: new T sensors 21/1/11 ALICE planning meeting
139
Activities in UX25 - Week 2 - 14/1 Friday
Cooling towers maintenance (No primary water) SNIFFER maintenance RAMSES: radiation source tests Visit (2 people). Resp. L.Pinsky EN/CV: maintenance SG2 ventilation Start pumping out LACS: revision UX25 access doors It Removal EMCal infrastructure H VAC Laser TPC FEC TRD LV Muon TRK: bus-patches Muon TRG: RPC EMC Survey EMC Survey SPD cooling TOF TOF: HV test SM13 + move SM15 21/1/11 ALICE planning meeting
140
Activities in MNF - Week 2 - 14/1 Friday
PMD: new T sensors 21/1/11 ALICE planning meeting
141
Activities in UX25 - Week 2 - 15/1 Saturday
Cooling towers maintenance (No primary water) It H Laser 21/1/11 ALICE planning meeting
142
Activities in MNF - Week 2 - 15/1 Saturday
21/1/11 ALICE planning meeting
143
Activities in UX25 - Week 2 - 16/1 Sunday
Cooling towers maintenance (No primary water) D.Budnikov at CERN It H 21/1/11 ALICE planning meeting
144
Activities in MNF - Week 2 - 16/1 Sunday
21/1/11 ALICE planning meeting
145
Day-by-day schedule UX25 and MNF - Wk 3
146
Activities in UX25 - Week 3 - 17/1 Monday
Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Maintenance ITECO (9:00 to 11:00) SPIE: cabling UX25-CR4 It H Removal EMCal infrastructure EMCal ladders VAC TRD/EMC Survey TPC FEC Muon TRK: bus-patches SPD cooling Repair heater (nacelle) 2 nacelles on low-beta Fault on compressed air -> tripped all cooling plants ALICE pump-down until the 27 January 21/1/11 ALICE planning meeting
147
Activities in MNF - Week 3 - 17/1 Monday
TRD pre-trigger PMD: new T sensors 21/1/11 ALICE planning meeting
148
Activities in UX25 - Week 3 – 18/1 Tuesday
Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Google Street View: from 15:00 Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30 Maintenance AS 715 (CRs) 9:30 to 11:30 SPIE: cabling UX25-CR4 Visit 10:00 (16 persons). Resp.: Naomi van der Kolk It TOF/PHOS/EMC cooling VAC TRD/EMC Survey TPC FEC Muon TRK: bus-patches ST2 SPD cooling SPD cooling ST2: replace 2nd chamber Washing bad sectors 3/4 done. Last tomorrow Start 9:30 21/1/11 ALICE planning meeting
149
Activities in MNF - Week 3 - 18/1 Tuesday
21/1/11 ALICE planning meeting
150
Activities in UX25 - Week 3 - 19/1 Wednesday
Cooling towers maintenance (No primary water) Maintenance UX25, Muon TRK-TRG ventilation Google Street View ZDF (9:00) Maintenance harmonic filter (EOF128/2X) De Gennaro (photographer, PM) Visit: (23 students). Dutch high school. About 14:00-17:00. (P. Kuijer) SPIE: cabling UX25-CR4 Reinstall laser hut door It TOF/PHOS/EMC cooling SDD fibers/ cooling VAC TRD/EMC Survey TPC FEC Muon TRK: bus-patches Muon TRG: gas leaks SDD fibers/ cooling SPD cooling TOF SPD cooling Nacelle + driver needed TOF: re-cable 2 crates SM2-3 Yannick: rearrange TPC pipes MNF (O-side). If SDD done (need nacelle) 21/1/11 ALICE planning meeting
151
Activities in MNF - Week 3 - 19/1 Wednesday
21/1/11 ALICE planning meeting
152
Activities in UX25 - Week 3 - 20/1 Thursday
AUG test. No access UX25 Cooling towers maintenance (No primary water) Maintenance L3, UX25, Muon TRK-TRG ventilation VIP visit (12: :00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany It VAC Philippe: all racks with Wieners (15) have been cleaned + all filters cleaned From CV e-log: “Following AUG test during the whole day, TOF, TRD, SSD/SDD, TPC Rod and HMPID cooling plants have been reset and switched on several times. Note that Mixed and Chilled water are still missing so HMPID cannot stay running”. 21/1/11 ALICE planning meeting
153
Activities in MNF - Week 3 - 20/1 Thursday
21/1/11 ALICE planning meeting
154
Activities in UX25 - Week 3 - 21/1 Friday
Restart primary water: late afternoon Restart ITS ventilator (CR5) PM Maintenance L3, UX25, Muon TRK-TRG ventilation. Restart all units Reinstall PMD CROCUS platform Visit (6 people) between 16:30 and 18:30 – Resp. J.Pierre Revol Confined space training ACO It Close O-side door VAC TRD Survey (I-side) TPC FEC TRD Muon TRK: bus-patches PHOS cooling SPD cooling PMD Dmitry: refurbish cooling plant Removal machine (PM) Check ACORDE modules (PMTs optical connections, connectors, etc) Install ventilator 21/1/11 ALICE planning meeting
155
Activities in MNF - Week 3 - 21/1 Friday
No access L3 (no ventilation) 21/1/11 ALICE planning meeting
156
Activities in UX25 - Week 3 - 22/1 Saturday
No access L3 (no ventilation) It VAC Close both doors 21/1/11 ALICE planning meeting
157
Activities in MNF - Week 3 - 22/1 Saturday
No access L3 (no ventilation) 21/1/11 ALICE planning meeting
158
Activities in UX25 - Week 3 - 23/1 Sunday
No access L3 (no ventilation) It 21/1/11 ALICE planning meeting
159
Activities in MNF - Week 3 - 23/1 Sunday
No access L3 (no ventilation) 21/1/11 ALICE planning meeting
160
Day-by-day schedule UX25 and MNF - Wk 4
161
Activities in UX25 - Week 4 - 24/1 Monday
EN-CV: maintenance L3-Dipole cooling (UW25) Peter Ginter. Whole week 16:00 to 17:30: Korean TV crew ACO No access L3 (no ventilation) It Green bridge VAC Transfer survey to MNF (AM) ST1 L3 ventilation PHOS cooling SPD cooling PMD 9:00 switch back to mixed water (Philippe) Reconnect pipes 14:00 Change Manu Extraction: AM Injection: PM Control (CCM equipment) 21/1/11 ALICE planning meeting
162
Activities in MNF - Week 4 - 24/1 Monday
9:00: Lower PMD crocus (Pieter) Normal hours if compatible with L3,PMD ventilation, otherwise after 18:00 Photogrammetry ITS patch-panels (PM) No access L3 (no ventilation) PMD: access to CROCUS TPC RR Replace the heat exchanger module and the filters 21/1/11 ALICE planning meeting
163
Activities in UX25 - Week 4 – 25/1 Tuesday
Maintenance L3-Dipole cooling PLC upgrade for PMD, TPC, TRD. These gas systems have to be turned off for about half an hour Access possible if L3 ventilation on ACO No access L3 (no ventilation) It Green bridge VAC Laser (PM) Muon TRK: bus-patches L3/PMD ventilation PMD Fix problem with computer communication of new laser - if access is granted to engineer !! 21/1/11 ALICE planning meeting
164
Activities in MNF - Week 4 - 25/1 Tuesday
Possible if L3 ventilation on SPD: test with dummy sector (PM) TPC RR PMD ventilation SPD cooling No access L3 (no ventilation) Photogrammetry ITS patch-panels PMD: access to CROCUS Normal hours if compatible with L3,PMD ventilation, otherwise after 18:00 21/1/11 ALICE planning meeting
165
Activities in UX25 - Week 4 - 26/1 Wednesday
Maintenance L3-Dipole cooling Philippe-Didier ACO L3 bus-bar It MNF wall VAC TPC RR and FEC. TRD panels Laser TPC FEC Muon TRK: bus-patches gas connectors Muon TRG: PHOS PMD ventilation HMPID PMD 9:00 Inspection crystal cooling plant Pneumatic valves, and fix radiator 21/1/11 ALICE planning meeting
166
Activities in MNF - Week 4 - 26/1 Wednesday
PMD ventilation SPD cooling PMD: access to CROCUS Normal hours if compatible with PMD ventilation, otherwise after 18:00 21/1/11 ALICE planning meeting
167
Activities in UX25 - Week 4 - 27/1 Thursday
Maintenance L3-Dipole cooling Visit: TV team from The Economist Remove the heating rack (crane) ACO It MNF wall VAC TPC RR and FEC. TRD panels gas connectors Muon TRG: Laser TPC FEC Muon TRK: bus-patches PMD ventilation HMPID 21/1/11 ALICE planning meeting
168
Activities in MNF - Week 4 - 27/1 Thursday
VAC: switch on annular ion pump and open the manual valve PMD ventilation SPD cooling PMD: access to CROCUS VAC Normal hours if compatible with PMD ventilation, otherwise after 18:00 21/1/11 ALICE planning meeting
169
Activities in UX25 - Week 4 - 28/1 Friday
Intervention L3 lift. No access UX25 after 17:00 Visit: TV team from The Economist ACO It MNF wall TPC RR and FEC. TRD panels TPC FEC Muon TRK: bus-patches Laser Green bridge HMPID 21/1/11 ALICE planning meeting
170
Activities in MNF - Week 4 - 28/1 Friday
SPD cooling PMD: access to CROCUS 21/1/11 ALICE planning meeting
171
Activities in UX25 - Week 4 - 29/1 Saturday
Intervention L3 lift. No access UX25 whole day It 21/1/11 ALICE planning meeting
172
Activities in MNF - Week 4 - 29/1 Saturday
Intervention L3 lift. No access UX25 whole day 21/1/11 ALICE planning meeting
173
Activities in UX25 - Week 4 - 30/1 Sunday
Access in general mode It 21/1/11 ALICE planning meeting
174
Activities in MNF - Week 4 - 30/1 Sunday
Access in general mode 21/1/11 ALICE planning meeting
175
Day-by-day schedule UX25 and MNF - Wk 5
176
Activities in UX25 - Week 5 - 31/1 Monday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode Visit (60 students from Italy). Resp. Despina. After 18:00 Maintenance PX24 PAD (guard 8:00 to 18:00) Wk 5 or 6: L3-Dipole powering test (2 hours lunch-time – need to search magnets) TRD Kr calibration. Whole week It MNF shielding TPC FEC Muon TRK: bus-patches PHOS cooling Refurbishment crystal cooling plant. VIC needed. After 18:00 Normal hours Normal hours 21/1/11 ALICE planning meeting
177
Activities in MNF - Week 5 - 31/1 Monday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode PMD: access to CROCUS Start new cooling system (PM) After 18:00. Use CROCUS platform 21/1/11 ALICE planning meeting
178
Activities in UX25 - Week 5 – 1/2 Tuesday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode It MNF shielding Muon TRK: bus-patches TPC FEC 21/1/11 ALICE planning meeting
179
PMD: test with new cooling
Activities in MNF - Week 5 - 1/2 Tuesday 8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode PMD: access to CROCUS PMD: test with new cooling 21/1/11 ALICE planning meeting
180
Activities in UX25 - Week 5 - 2/2 Wednesday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode It MNF shielding TPC FEC T0 Muon TRK: bus-patches Continue the work with amplifiers (from C-side) and with the electronics (rack 018,019). After 18:00 21/1/11 ALICE planning meeting
181
PMD: test with new cooling
Activities in MNF - Week 5 - 2/2 Wednesday 8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode PMD: access to CROCUS PMD: test with new cooling 21/1/11 ALICE planning meeting
182
Activities in UX25 - Week 5 - 3/2 Thursday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode It MNF shielding Laser TPC FEC T0 Muon TRK: bus-patches After 18:00: alignment and tests with laser beam into TPC 21/1/11 ALICE planning meeting
183
PMD: move detector to final position
Activities in MNF - Week 5 - 3/2 Thursday 8:00 – 18:00 access in restricted mode Move PMD to final position. Date tbc 18:00 – 8:00 access in general mode PMD: move detector to final position 21/1/11 ALICE planning meeting
184
Activities in UX25 - Week 5 - 4/2 Friday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode It MNF shielding Laser TPC FEC T0 Muon TRK: bus-patches Return to Meyrin 21/1/11 ALICE planning meeting
185
Activities in MNF - Week 5 - 4/2 Friday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode PMD: access to CROCUS 21/1/11 ALICE planning meeting
186
Activities in UX25 - Week 5 - 5/2 Saturday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode It MNF shielding Laser 21/1/11 ALICE planning meeting
187
Activities in MNF - Week 5 - 5/2 Saturday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
188
Activities in UX25 - Week 5 - 6/2 Sunday
Access in general mode It Laser 21/1/11 ALICE planning meeting
189
Activities in MNF - Week 5 - 6/2 Sunday
Access in general mode 21/1/11 ALICE planning meeting
190
Day-by-day schedule UX25 and MNF - Wk 6
191
Activities in UX25 - Week 6 - 7/2 Monday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode Restart Muon TRG flammable gas Transport “red” nacelle to surface MNF shielding Laser After 18:00: software and tests 21/1/11 ALICE planning meeting
192
Activities in MNF - Week 6 - 7/2 Monday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
193
Activities in UX25 - Week 6 – 8/2 Tuesday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode T stability in view of TPC Kr calibration. All detectors (mainly PMD, SSD, SDD, TRD and TOF) switched on and not change conditions anymore PX24 shielding beams Laser 8:00 to 18:00: no access CR1-5 and Exhibition 21/1/11 ALICE planning meeting
194
Activities in MNF - Week 6 - 8/2 Tuesday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
195
Activities in UX25 - Week 6 - 9/2 Wednesday
Upgrade firmware DARC and Regional board in order to speed up MTR decision electronics configuration. Might need some short (~1/2 hours) access during the restricted access hours 8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode Muon TRG PX24 shielding beams Survey ST 4-5 Laser 8:00 to 18:00: no access CR1-5 and Exhibition If access possible 21/1/11 ALICE planning meeting
196
Activities in MNF - Week 6 - 9/2 Wednesday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
197
Activities in UX25 - Week 6 - 10/2 Thursday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode Muon TRG PX24 shielding blocks Survey ST 4-5 Laser 8:00 to 18:00: no access CR5 If access possible 21/1/11 ALICE planning meeting
198
Activities in MNF - Week 6 - 10/2 Thursday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
199
Activities in UX25 - Week 6 - 11/2 Friday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode Start TPC Kr calibration. Till end wk 7 PX24 shielding blocks Survey ST 4-5 Laser 8:00 to 18:00: no access CR5 If access possible 21/1/11 ALICE planning meeting
200
Activities in MNF - Week 6 - 11/2 Friday
8:00 – 18:00 access in restricted mode 18:00 – 8:00 access in general mode 21/1/11 ALICE planning meeting
201
Activities in UX25 - Week 6 - 12/2 Saturday
DSO test – NO ACCESS 21/1/11 ALICE planning meeting
202
Activities in MNF - Week 6 - 12/2 Saturday
DSO test – NO ACCESS 21/1/11 ALICE planning meeting
203
Activities in UX25 - Week 6 - 13/2 Sunday
DSO test – NO ACCESS 21/1/11 ALICE planning meeting
204
Activities in MNF - Week 6 - 13/2 Sunday
DSO test – NO ACCESS 21/1/11 ALICE planning meeting
205
Day-by-day schedule UX25 and MNF - Wk 7
206
Activities in UX25 - Week 7 - 14/2 Monday
TPC Kr calibration (whole week) Survey ST 2 21/1/11 ALICE planning meeting
207
PMD survey Activities in MNF - Week 7 - 14/2 Monday 21/1/11
ALICE planning meeting
208
Activities in UX25 - Week 7 – 15/2 Tuesday
Survey ST 2 21/1/11 ALICE planning meeting
209
Activities in MNF - Week 7 - 15/2 Tuesday
21/1/11 ALICE planning meeting
210
Activities in UX25 - Week 7 - 16/2 Wednesday
Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30 Maintenance AS 715 (CRs) 9:30 to 11:30 21/1/11 ALICE planning meeting
211
Activities in MNF - Week 7 - 16/2 Wednesday
21/1/11 ALICE planning meeting
212
Activities in UX25 - Week 7 - 17/2 Thursday
21/1/11 ALICE planning meeting
213
Activities in MNF - Week 7 - 17/2 Thursday
21/1/11 ALICE planning meeting
214
Activities in UX25 - Week 7 - 18/2 Friday
Removal crane electronics Patrol UX25 cavern Reinstall RP samples ITECO It 21/1/11 ALICE planning meeting
215
Activities in MNF - Week 7 - 18/2 Friday
21/1/11 ALICE planning meeting
216
Activities in UX25 - Week 7 - 19/2 Saturday
Restart LHC – NO ACCESS 21/1/11 ALICE planning meeting
217
Activities in MNF - Week 7 - 19/2 Saturday
Restart LHC – NO ACCESS 21/1/11 ALICE planning meeting
218
Activities in UX25 - Week 7 - 20/2 Sunday
Restart LHC – NO ACCESS 21/1/11 ALICE planning meeting
219
Activities in MNF - Week 7 - 20/2 Sunday
Restart LHC – NO ACCESS 21/1/11 ALICE planning meeting
220
ALICE planning meeting
VIP visits 7/12 14:00 to 15:00: portuguese press visit to CERN. 10 persons.F.Baltasar 15/12 16:30: finance and Council Delegates 10/1 (16:15): Mr Herman Josef Lamberti, Deutsche Bank, Germany 20/1 (12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany 21/1/11 ALICE planning meeting
221
ALICE planning meeting
AOB - 21/1/11 ALICE planning meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.