Download presentation
Presentation is loading. Please wait.
142
Brett Shearer, C.O. Real Estate
PROPOSED RIGHT OF WAY DESIGN _______________________________________________________________
143
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
144
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
145
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
146
PROPOSED RIGHT OF WAY DESIGN
147
Channel Easement Used to acquire the right to construct and maintain, a perpetual watercourse within the area described in the easement. This type of easement is used for the construction of an open watercourse channel that falls outside of the regular highway rights of way. No permanent structures are permitted within a Channel Easement. Such as headwall, wing wall, culvert, pipe, guardrail, etc.
148
Channel Easements-CH
149
PROPOSED RIGHT OF WAY DESIGN
150
Utility Easement Used to acquire an easement in the name of a railroad or public utility. The Summary of Additional Right of Way Sheet and Right of Way Detail Plan Sheet shall show by note the name in which the easement will be acquired when this type of easement is needed. An agreement is required between the Department and the Grantee giving the Department authority to acquire the parcel in the name of the Grantee and stipulating that the Grantee accepts the parcel. No Betterments.
151
Utility Easements-U
152
3106 Proposed Right of Way 3106.3 Construction Limits
Establishing R/W Lines and Widths Determining Types of Right of Way Takes Fee Simple vs. Easement Cost effectiveness of Acquisition vs. Construction Total Takes and/or Land Locked Parcels Sight Distance Access Control, Rules and Regulations Drives “Industrial, Commercial, Residential & Field Drainage Utility Conflict's and Relocation Railroad Property Today during this portion of the training I’m going to discuss: Existing R/W and give you a brief overview of the history of Ohio roads. I will talk about the establishment of County/Township Roads which led to the Inter County Highways and eventually to State Highways. Were going to discuss Deed research and investigation Lastly in this portion you will learn about ODOT’s title reports.
153
PROPOSED RIGHT OF WAY DESIGN
Construction Limits Assist in defining the minimum R/W required. Construction limits are typically placed 4 feet outside the area required for construction activities. Will include removal of any item inside proposed limits; signs, parking areas, structures, trees, (may include root system outside R/W limits)
154
Construction Limits
155
Construction Limits
157
PROPOSED RIGHT OF WAY DESIGN
Establishing Right of Way Lines & Widths Federal regulations specify that: “The State shall acquire rights of way of such nature and extent as are adequate for the construction, operation, and maintenance of a project.” Right of Way lines, either permanent or temporary MUST encompass all construction limits. Many additional factors must be taken into consideration before final right of way lines are established.
158
PROPOSED RIGHT OF WAY DESIGN
Establishing Right of Way Lines & Widths Factors that should be considered in the selection right of way widths include, but are not limited to: Utilities Drainage Terrain Maintenance of Traffic during Construction Access Land Use Future Maintenance Sufficient Construction Area Real Estate Values
159
PROPOSED RIGHT OF WAY DESIGN
Establishing Right of Way Lines & Widths Right of Way Lines must be outside construction limits and encompass enough R/W to construct and maintain the road. All drainage structures shall be constructed within permanent right of way. Right of way lines should be kept parallel or concentric to the C/L when and where possible Maintain a uniform right of way width on each side of the centerline when and where possible.
160
WAR
161
Station
162
Station
163
Station
164
Station
165
Station
166
Station
167
Proposed R/W Design - Limited Access
600’ 600’ 600’ measurement starts from outside radius return of the ramp & crossroad intersection
168
PROPOSED RIGHT OF WAY DESIGN
Determining Types of R/W Takes The project scope of services document may outline the type of title to be acquired OR You may need to contact the District Real Estate Administrator or LPA. Fee vs. Standard Highway Easement consider: FHWA Funding in any part of the job Right of Way funding type (Federal/State/LPA) Existing R/W Type of Title Most beneficial to owner (ODOT or Property) Property owner conflicts in the area Type of development in the area: Residential vs Commercial vs Industrial Encroachments Mood of property owners being effected Ownership of PRO (present road occupied)
169
PROPOSED RIGHT OF WAY DESIGN
Cost effectiveness of Real Estate vs. Construction Design Must have open communications between R/W Design & Roadway Design Avoidance and proximity High Impacts on Real Estate vs. Tailored Construction Design Parking Spaces Eliminated
170
…..a R/W line too far... 15’ 15’
171
3-5’
174
PROPOSED RIGHT OF WAY DESIGN
Total Takes and/or Land Locked Parcels are typically Identified in Phase 2 - Preliminary Engineering The design agency shall identify total take or landlocked parcels. Residential or commercial structures Excess Land Protective buys/Hardship acquisition Property Rights
175
PROPOSED RIGHT OF WAY DESIGN
EXCESS LAND
176
PROPOSED RIGHT OF WAY DESIGN EXCESS LAND
177
PROPOSED RIGHT OF WAY DESIGN EXCESS LAND
178
M.O.T.
179
Maintenance of Traffic
180
Maintenance of Traffic
181
Maintenance of Traffic
182
Maintenance of Traffic
183
PROPOSED RIGHT OF WAY DESIGN
Sight Distance must be taken into consideration when determining the type and amount of R/W at intersections and in the vicinity of Horizontal curves
184
PROPOSED RIGHT OF WAY DESIGN
Access Control, Rules and Regulations ODOT’s goal is to manage the highway system effectively, reduce congestion, improve safety, and operation. Access Management Manual
185
PROPOSED RIGHT OF WAY DESIGN
Drives- Commercial, Residential, Etc. Identify ALL existing drives/access points. Review, evaluate drives to be relocated/closed. Appropriate drive widths Existing permits
186
PROPOSED RIGHT OF WAY DESIGN Property Rights
187
PROPOSED RIGHT OF WAY DESIGN
Property Rights
188
PROPOSED RIGHT OF WAY DESIGN ACCESS
189
ACCESS MANAGEMENT
190
ACCESS MANAGEMENT
191
PROPOSED RIGHT OF WAY DESIGN
Drainage Some major items of concern are: Open water course (ditches) Channels Storm Water/Sewers Catch basins Manholes Culverts Headwalls Field tiles (contact the property owner) Erosion control Post construction storm water management
192
PROPOSED RIGHT OF WAY DESIGN
Utility Conflicts and Relocation Many major conflicts and relocation issues are identified during Phase 1 Planning (PL). However continual attention must be given to utility conflicts and relocation during development of the right of way plan. Many utility conflicts and relocation issues are not clear until detailed roadway design is complete. These conflicts may have a major impact on the type of right of way acquired as well as the amount of land acquired.
193
Utilities
194
Utility Relocation Needs (2)
Utilities Utility Relocation Needs (2)
195
PROPOSED RIGHT OF WAY DESIGN
Railroad Property It is the responsibility of the right of way design agency to prepare the railroad plat when the acquisition of the railroad property is necessary. An extensive title search is necessary on Railroad Property, to determine what title the railroad company holds to the real estate e.g. fee title or easement rights. Root Title (private property owner conveyed to RR) Coordination with the District Real Estate Administrator
196
PROPOSED RIGHT OF WAY DESIGN
Adherence to Environmental Document and Environmental Commitments R/W Plan Designer must maintain coordination and communication with the project manager and the Office of Environmental Services during the right of way plan development. Changes in temporary or permanent right of way may lead to different resource impacts than those approved in the environmental document. Should be addressed in Phase PE Talking Point…re-evaluation is typically not conducted on projects that have a reduction in ROW. Increase in ROW, in most cases will require the environmental document to be re-evaluated, especially if impacts will occur to known or previously unidentified environmental resources. The type of re-evaluation will depend on the potential for impacts and is conducted by the DEC, in conjunction with possible coordination.
197
Avoid Headaches! If anything is unclear or there are issues or concerns, contact the District Real Estate Administrator early in the R/W design process.
198
Questions?
199
Innovative design ideas that save right of way acquisition costs:
Service roads Retaining walls Modified design Bridge span extension. Innovative Design ideas must have a substantial real estate cost saving as service roads, walls and extended bridges all have future maintenance costs.
200
Project 1 HEN/LUC-24 service road addition saves +/- $ 1,300,000.
201
Stage 1 plans did not include the green shaded service road
Stage 1 plans did not include the green shaded service road. Without it +/- 73 acres at a before value of +/- $30,000 per ace would be legally land locked at a damage of +/- $ 1,500,000 parcels are owned by family but under different title. The service road costs +/- $200,000. including design, thus saved +/- $ 1,300,000.
202
HEN/LUC-24 stage 1 plans included an earth slope embankment that would remove most of a 4 rail siding for a major manufacturer. Wetland and other site restrictions would prohibit reconstruction/relocation of the required siding. The plant relies on rail shipping for its products. Financial loss or costs were in estimated at in excess of $ 3,000,000.
203
The earth slope was reduced by designing a partial retaining wall structure estimated at a cost of +/- $ 600,000. including design. Only about 400 Lineal feet of rail siding was impacted. Extensions of the unaffected rails at a cost of $ 200,000 restored capacity. Thus the savings was in excess of +/ $ 2,000,000.
204
Project 2 LUC- Wheeling Street an LPA minor arterial widening
Project 2 LUC- Wheeling Street an LPA minor arterial widening. Stage one plans included foot wide lanes, +/- 6 foot wide paved berms and 2 foot curbs. The effect would take 5 or 6 homes and significant parking.
205
After design discussion and a study, 2 lanes were reduced to 10 foot wide. Berms and curbs were reduced to provide a safe design and similar level of service. The result, no homes taken due to widening and no parking lost. This reduced r/w costs in excess of +/- $1,000,000.
206
WAR
212
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.