Download presentation
Presentation is loading. Please wait.
Published byPaul Gilbert Modified over 6 years ago
1
Introduction to COG Guarantee Business System Project
Hui Xu
2
Project Goal Project name Areas Product applied to
COG Guarantee Business System Areas Product applied to Applying guarantees the service domain in the credit guarantee group, including Guangdong, Beijing, Shanghai, Hunan, Hubei, Fujian, Zhejiang, jiangsu, and Chongqing Provinces. Start and End date of project 20/08/2007~ 01/10/2010 Budget of project ¥84 ten thousand
3
Project general situation
Estimated effort 141 Person month Estimated size 246 KLOC Selected lifecycle model Incremental Model Numbers of project member 18
4
Project general situation
Coding language JAVA Platform of technology Technical Architecture: WebWork 2+spring Operating System: Linux Suse10/AIX5.3 Database: Oracle 10g Application server: InforSuite v5.1.0 Development tool: Eclipse v
5
Project Phases Phase name Start date End date Phase goal
Analyze and validate requirements Sign the user requirements requirements reviewing and validation High level design high level design reviewing coding, testing and deploying for personal business sub-system Personal business system running on-line coding, testing and deploying for enterprise business sub-system Enterprise business system running on-line Approval and maintenance Sign the approval reports
6
Current Status Current phase Current status
coding, testing and deploying for enterprise business sub-system. Current status Personal business sub-system is running on-line. coding of Enterprise business sub-system is on-going
7
Plan Change Change reason Nothing
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.