Presentation is loading. Please wait.

Presentation is loading. Please wait.

LHeC Coordination Meeting, 9 June 2017

Similar presentations


Presentation on theme: "LHeC Coordination Meeting, 9 June 2017"— Presentation transcript:

1 LHeC Coordination Meeting, 9 June 2017
Report from Berlin FCC Week 2017 Frank Zimmermann LHeC Coordination Meeting, 9 June 2017

2 FCC Week 2017, 29 May – 2 June, Berlin
260 presentations and 50 posters showcasing significant progress FCC-hh and FCC-ee: well on track for CDR; FCC-eh: baseline defined; HE-LHC: design ramping up with still a lot of work ahead FCC Week 2017, 29 May – 2 June, Berlin # participants over the years 2017 participant composition 147 Institutes 27 Countries Geneva W. DC Rome Berlin

3 Collaboration & Industry Relations
111 Institutes 25 Companies 32 Countries EC H2020 M. Benedikt

4 FCC Layout Changes (profile)
Jo Stanyard Rome 2016 Layout Reduced Depth & alignment change; area surrounding L no longer in limestone. Berlin 2017 Layout O. Bruning

5 Long models and prototypes
16 T magnet R&D schedule Total duration of magnet program: ~20 years Would follow on HL-LHC Nb3Sn program with long models with industry from 2023/24 Superconductor Qualification Long models and prototypes Scale up Series production (1100 tons/y) Magnets Euro-CirCol Design Short models Long models Prototypes Pre Series Series production (1200 magnets/y) Cold tests Hub 1 Series tests (1200 magnets/y) Hub 2 Hub 3 M. Benedikt

6 Draft Schedule Considerations
20 22 24 26 28 30 32 34 36 38 40 42 Technical Design Phase Strategy Update 2026 – assumed project decision Dipole short models Dipole long models SC Magnets 16 T dipole indust. prototypes 16 T dipoles preseries 16 T series production Civil Engineering FCC-hh ring FCC-hh CE TL to LHC LHC Modification Installation + test FCC-hh CE FCC-ee ring + injector FCC-ee Injector Installation + test FCC-ee LHC Removal HE-LHC Installation HE-LHC M. Benedikt

7 Conceptual Design Report Physics opportunities across all scenarios
2 Hadron Collider Summary 3 – Hadron Collider Comprehensive Required for end 2018, as input for European Strategy Update Common physics summary volume Three detailed volumes FCChh, FCCee, HE-LHC Three summary volumes FCChh, FCCee, HE-LHC Physics opportunities across all scenarios Accelerator Injectors Technologies Infrastructure Operation Experiment eh 4 Lepton Collider Summary 5 – Lepton Collider Comprehensive Accelerator Injectors Technologies Infrastructure Operation Experiment 6 High Energy LHC Summary 7 – High Energy LHC Comprehensive Accelerator Injectors Infrastructure Refs to FCC-hh, HL-LHC, LHeC M. Benedikt

8 CDR planning 2017 2018 PRINT FINISHED | Oct 26 END of Final edit
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May PRINT FINISHED | Oct 26 END of Final edit | Aug 31 END OF VOLUME EDIT | June 30 Guidelines, tools ready, editorial teams operational | Sep VOLUME EDIT STARTS | Oct Contents review by IAC (FCCWeek) | Apr 9-13 Review session with IAC | May 15 Overall editing: Proofread, homogenization, cross-referencing, polishing ToC & Volume layout definition | Jun Editing package “Overleaf” During summer nomination of editors and author groups FCC CDR available for publication in November 2018. M. Benedikt

9 O. Bruning


Download ppt "LHeC Coordination Meeting, 9 June 2017"

Similar presentations


Ads by Google