Christian Michaelson Joe Anderson
The Water Bandits Christian Michaelson Joe Anderson
2
UTAH’S PRESENT WATER SUPPLY
Basin (acre-feet/yr) Present* 2020† 2050† Jordan River 332,000 449,000 650,000 Weber River 170,000 267,000 358,000 Utah Lake 134,000 207,000 338,000 Bear River 50,000 71,000 103,000 TOTAL 686,000 923,000 1,346,000 Basin Developable Supply (acre-feet/yr)* Bear River 250,000 Jordan River & Utah Lake 50,000 Weber River 25,000 325,000 Total available Supply= 1,011,000
3
PROBLEM By the year 2024 Utah’s demand for water will not be met by the present water supply
4
Bring water from the Colorado River
SOLUTION Bring water from the Colorado River (70,000 acre*ft/year)
5
MOVING WATER FROM GREEN RIVER DRAINAGE TO THE WASATCH FRONT
Tasks Use GIS to choose optimal alignment of the transmission system Do hydrologic study to determine water quantities Identify cost items for diversion and transmission facilities for pipes, pump stations, turbines, and construction Benefits of the project Institutional and environmental concerns Conclusion
6
ALIGNMENT OF THE TRANSMISSION SYSTEM
Where to find data What kind of data How to process the data Results of the data processing Objectives met Objectives not met
7
WHERE TO FIND THE DATA AGRC University of Wyoming’s GIS website
USGS seamless website
8
WHAT KIND OF DATA Raster data
because of abilities of the raster calculator Vector data shape files converted to raster data
9
MAKING THE MAP Using Grid Pig 8 DEM’s were into 1
10
STUDY AREA
11
BUILDING COST GRID GIS chooses path with least amount of points
POINT SYSTEM Slope x = degrees Wetlands (50 ft buffer) points Other points National Park points Forest Service points Private Land points Public Land points Elevation elev/100 (m) GIS chooses path with least amount of points
12
SLOPE MAP Was created using Spatial Analyst
13
LAND OWNER AND NATIONAL PARKS
14
WETLANDS Wyoming Wetlands Utah Wetlands
15
COST DIRECTION GRID
16
HILLSHADE AND COST DISTANCE MAP
17
The final project path –
Not exactly what we had expected.
18
QUESTIONS?