Martin Jones – Superfast Cymru Programme Manager
2
Roll-Out Superfast Cymru roll-out priorities defined by Welsh Government Economic e.g. Enterprise Zones & Local Growth Zones Social e.g. help with digital exclusion Approach Rural and urban deployment at the same time Business and consumer at the same time A massive engineering project Over 1.31 million premises in Wales now have access to Fibre Broadband – a fantastic success story. 681K premises built to date under NGBW 629K premises built under BT’s commercial programme.
4
Video URL’s Fibre Big Build Video Superfast Scotland Fibre Delivery Videos
5
Phase 1 Install FTTP solution to PCP 1 to feed properties connected to Distribution Points circled in RED
6
1.2km of Cable to include New poles and ducts and associated power and civils works plus an All-in-one DSLM Phase 2 – Install a new All-in-one cabinet in Llanvaches fed by a new Fibre run from PCP 1 once phase 1 is compete – 80 premises covered at a cost of £42,750 or £534/ prem
7
7.7km of Cable to include New poles and ducts and associated power and civils works Phase 3 – Run a new fibre solution from a virtual PON to the outlying areas and provide an FTTP solution – 38 Premises a cost of £125k or £3292/prem
8
Fibre Checker Fibre Journey Website
9
And What About Those Not Covered By Superfast Cymru
Welsh Government’s Access Broadband Cymru Grants of £400 and £800 available to individuals and businesses to obtain 10mb and 30mb broadband through satellite for example Welsh Government’s Ultrafast Scheme Grants of up to £10,000 available for businesses to obtain 100mb connections through leased lines for example BT Community Fibre BT will work with communities and co-invest in order to bring fibre broadband to those missed out by Superfast Cymru
10
Interactive Information
Case Study