PATTERN RAFTER
2
Roof plan
3
Information required Pitch of roof = 22.5° Half span of roof = 2150mm
Eaves overhang Rafter spacing Thickness – ridge hip rafters = 22.5° = 2150mm = 300mm = 450mm = 25mm = 35mm = 45mm
4
Calculations required
Rise per metre = rise/m = True length per metre = t.l./m = Set out length of rafter = set out length = Tan pitch angle 0.414 1.082 tl/m x half span 2.327m
5
Bevels required 1. Plumb bevel rafter 2. Level bevel rafter 1. Rise 2.
Half span
6
Steel square application
Rise/m ÷ 2 207 1000 ÷ 2 500
7
Pattern rafter Set out length Half span
8
Reduction : Common rafter
Ridge Half thickness of ridge Half thickness ridge measured square to plumb bevel
9
Reduction : Crown end Half rafter thickness Crown end
measured square to plumb bevel
10
Creeper spacing calculations
Rafter spacing x tl/m ½ mitre thickness hip ½ rafter thickness = x 1.082 = 0.487 = = 24.75mm = 22.5mm
11
Long point: first creeper
a Crown end Creeper spacing b 487mm a a c b Half mitre thickness out c is long point first creeper Half rafter thickness back
12
Continuous creeper spacing
X tl/m 487mm 487mm long point first creeper 487mm 450mm 487mm 450mm overhang x tl/m 325mm 450mm 450mm 300mm
13
Mark edge bevel creeper
Summary Plumb bevel centre line Set out length and birdsmouth Reduction common rafter Reduction crown end Long point 1st creeper Continuous creeper reduction Eaves overhang Square marks across top edge and label Mark edge bevel creeper