Download presentation
Presentation is loading. Please wait.
1
DE-KIT(GridKa) -- 100G @ LHCONE
Bruno Hoeft / KIT Andreas Petzold / KIT
2
Agenda History 100G @ (DE-)KIT NREN proposal DE-KIT proposal
100G between KIT and Jülich (2010) SC13 – 100G from KIT to SC13 (Caltech-booth) (DE-)KIT Motivation NREN proposal DE-KIT proposal KIT -- proposed Deployment Steps Upgrade Sketch At Upgrade Involved Splitting into Parts Market survey (DE-)KIT deployment 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
3
2010 – KIT – Jülich (DFN/Huawei/Cisco/Gasline)
History 2010 – KIT – Jülich (DFN/Huawei/Cisco/Gasline) Düsseldorf Köln Bonn Koblenz Frankfurt Wiesbaden Mainz Darmstadt Mannheim FZ Jülich KIT Karlsruhe Dernbach Gernsheim Porz Naurod 88 km 60 km 96 km 64 km 29 km 93 km 17 km J– … J– Huawei 100GE DWDM hades-fzj1 ms-fzj1 max. 96,5Gbps Fiber distance 440 km Heidelberg K– … K– Huawei 100GE DWDM ms-kit1 ti-kit1 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
4
KIT @ Caltech SC13 WAN Demo
Storage to storage file transfer File transfer via FastDataTransfer (FDT) application @KIT 20 Fileserver different capacities 10G NIC @Caltech booth 3 Fileserver 1 or 2 40G NIC SSD Harddisk 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
5
… WAN – KIT SC13 @KIT: Nexus 7010 : 100G linecard (LR-4)
Echostream3 40G sc3 sc5 Caltech SC13 booth DFN contributes 100G link Karlsruhe - Amsterdam DFN PoP Karlsruhe ECI 100G to DFN PoP Frankfurt @Frankfurt : peering to Géant Géant PoP Frankfurt to Géant PoP Amsterdam @Amsterdam Géant Peering via MX960 with SURFnet T4000 @KIT: Nexus 7010 : 100G linecard (LR-4) … ANA-100G (transatlantic link) @NewYork MANLAN (Internet2) and via Esnet to SC13 Denver 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
6
Throughput: Monalisa WAN – KIT SC13 70Gbps at monalisa
Echostream3 40G sc3 sc5 Caltech SC13 booth Throughput: Monalisa 70Gbps at monalisa peaks up to 75Gbps 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
7
Agenda History 100G @ (DE-)KIT NREN proposal DE-KIT proposal
100G between KIT and Jülich (2010) SC13 – 100G from KIT to SC13 (Caltech-booth) (DE-)KIT Motivation NREN proposal DE-KIT proposal KIT -- proposed Deployment Steps Upgrade Sketch At Upgrade Involved Splitting into Parts Market survey (DE-)KIT deployment 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
8
DE-KIT / GridKa German LHC Tier-1 status
GridKa (tier-1) Provider Edge Router DWDM DFN R-ir-cn-1-1 KIT Provider Edge Router IT-INFN-CNAF (T1) FR-CCIN2P3 (T1) FZU (Prague) (T2) CERN (T0) Poland (T2) NL-T1 (T1) R-ir-cn-1-2 KIT Provider Edge Router Legend: 10G Ethernet 10G VPN End-to-End LHCOPN: T0 – T1 Direct connected sites: T1 – T[12] 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
9
Géant initiated merging test of dedicated tier-1 connections to LHCONE
DE-KIT Slide of Vincenzo Capone, url: 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
10
LHCOPN link was saturated even during LS1
Upgrade Motivation LHCOPN link was saturated even during LS1 LHCone max. usage 15Gbps DE-KIT to Tier-[123] General Purpose Internet max. usage 10Gbps proposed upgrade General purpose internet traffic 20 GE 50 GE LHCone utilization 15Gbps 20 GE LHCOPN utilization 10Gbps 70+20 GE Proposed upgraded datarate after LS1 Expected 500MB/sec approx. 5Gbps + additional experiment data 2 * 10GE LHCOPN Increased datarate between Tier-1 – Tier-1 communication Increased datarate between Tier-1 and Tier-[23] 1 * 10 GE GridKa --> LHCOPN T0 3 * 10 GE Gridka --> DE-KIT to T1 15 2 * 10 GE GridKa --> LHCONE (T[123]) 15 + Internetconnection - KIT 10 GE 40 GE Status and Trends in Networking at LHC Tier1 Facilities (Andrey Bobyshev (FNAL) at CHEP 2012) 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
11
Current GridKa deployment
GridKa (tier-1) Provider Edge Router DWDM DFN R-ir-cn-1-1 R-ir-cn-1-2 IT-INFN-CNAF (T1) IT-INFN-CNAF (T1) FR-CCIN2P3 (T1) FR-CCIN2P3 (T1) FZU (Prague) (T2) NL-T1 (T1) FZU (Prague) (T2) CERN (T0) CERN (T0) Poland (T2) Poland (T2) NL-T1 (T1) Direct link DE-KIT to CERN (2*10G) LHCOPN Migration to-LHCONE Direct link DE-KIT to FR-CCIN2P3 (10G) to LHCONE (100G) Direct link DE-KIT to IT-INFN-CNAF (10G) to LHCONE (100G) Direct link DE-KIT to Poznan (1G) to LHCONE (100G) Direct link DE-KIT to FZU (Prague) (10G) to LHCONE (100G) Direct link DE-KIT to NL-T1 (10G) to LHCONE (100G) 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
12
100G @ KIT – upgrade perimeter
DFN Areas needed to be included in the 100G upgrade: 2 border routers (one VSS) (provider edge) (2* KIT-CN) 6* 100GE interfaces 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
13
100G @ KIT – upgrade perimeter
DFN Belwue Areas needed to be included in the 100G Upgrade: 2 border routers (one VSS) (provider edge) (2* KIT-CN) 6* 100GE interfaces 2 border routers (one VSS) (provider edge) (2* KIT-CS) 14* 100GE interfaces 4* 100GE transponder firewall 22* 100GE interfaces 6* 100GE transponder 4 backbone routers (2* VSS) (KIT core router) 16* 100GE interfaces routers of different projects (per project): 5* 100GE interfaces DWDM DWDM 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
14
100G @ KIT – upgrade perimeter
DFN Belwue Areas needed to be included in the 100G Upgrade: border router (provider edge) (KIT-CN) 4* 100GE interfaces border routers (provider edge) (KIT-CS) 7* 100GE interfaces 2* 100GE transponder firewall 14* 100GE interfaces 6* 100GE transponder 2 backbone routers (KIT core router) 6* 100GE interfaces 1* 100GE transponder routers of different projects (per project): 2* 100GE interfaces DWDM DWDM 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
15
Splitting the 100G upgrade into affordable parts
2013 Project LSDF 100G link to BioQuant Heidelberg via Belwue 2014 Project GridKa 100G link to LHCONE via DFN 2015/6 KIT-CN – provider edge router 2016/7 KIT-CS – provider edge router DWDM 2017/8 ? Firewall ? KIT core router (6* router) 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
16
100G-WAN@KIT Result of market survey 100GE – cfp2
Brocade MLXe 100GE – cfp2 All required protocols bgp (2 * internet routing table and still space) ospf pbr IPv4 + IPv6 VLAN ... adaptation required snmp cacti netgraphs sflow currently netflow netdoc home grown inventory and configuration database … First deployments steps are in progress 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
17
GridKa deployment after KIT 100G upgrade
second deployment phase (2015): 1* 100G to Frankfurt 1* 100G to Erlangen “traffic shaping“ to 50Gpbs at each 100G link Border router of KIT receiving 100G uplinks Project will get WAN access through KIT provider edge router 2* 10G LHCOPN link will stay separate VPN DE-KIT -- CERN IT-INFN-CNAF (T1) FR-CCIN2P3 (T1) NL-T1 (T1) FZU (Prag) (T2) CERN (T0) Poland (T2) LHCONE 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
18
Planned 100G Upgrade of DE-KIT (GridKa) (2016/17)
EDGE MPO/MPT r-ig-I r-ig-II Raum 168 198 r-grid145 r-grid3 r-grid2 r-grid6 FileServer TOR ECMP ComputeNode TOR Nexus 7000 Nexus 7700 Current four Catalyst 6509 will get replaced by two Nexus7700 Nexus N2K-C2348TQ Aggregation Switches for ComputeNodes FileServer aggregation switch Nexus 5696Q introduced Edge router upgrade catalyst 6509 to Nexus 7700 planned for 2017 CORE … Legend: 10Gbps 40Gbps 100Gpbs 100G / ISGC 2016, Bruno Hoeft / Andreas Petzold (KIT)
19
100G Deployment@(DE-KIT)
thanks for your attention ? Questions 100G Bruno Hoeft / KIT Andreas Petzold / KIT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.