Download presentation
Presentation is loading. Please wait.
1
REGIONAL BICYCLE AND PEDESTRIAN PLAN
EAC Item 45 Presentation April 27, 2017 EXECUTIVE ADVISORY COMMITTEE REGIONAL BICYCLE AND PEDESTRIAN PLAN April 27, 2017
2
WHAT AND WHY UPDATE 2008 REGIONAL BICYCLE & PEDESTRIAN PLAN
CHANGING BICYCLE & PEDESTRIAN ATTITUDES AND PRACTICES, LOCALLY & NATIONALLY DESIRED OUTCOMES ROLE OF THE PLAN
3
GOAL 3: EDUCATION & ENCOURAGEMENT
GOAL 1: COMFORT & SAFETY VISION & GOALS Southern Nevada will develop a safe, connected, and convenient walking and bicycling system that serves as a viable transportation and recreation asset while advancing the region’s economic, educational, health, and environmental goals. GOAL 2: ACCESS GOAL 3: EDUCATION & ENCOURAGEMENT GOAL 4: EQUITY & HEALTH
4
PERFORMANCE MEASURES Major and Fatal Crash Rates
Enhanced intersections Right-of-way space for active transportation % Population served by active transportation facilities Number and quality of crossings Bicycling and walking mode share School walking and biking programs Permanent counters Minutes of Physical Activity Transportation-limited populations served COMFORT & SAFETY ACCESS EDUCATION & ENCOURAGEMENT EQUITY & HEALTH
5
PUBLIC ENGAGEMENT OVERVIEW
Blasts Pop Up Meetings Online Survey Mapping Tool Charrette/Workshop Social Media Web updates Blasts: 1,122 subscribers (14) Pop Up Meetings Online Survey: 1,076 responses Mapping Tool, Round 1: 692 data points Mapping Tool, Round 2: 495 data points Charrette: attendees (staff, citizens) Social Media, webpage updates, bus posters
6
POLICIES & PROGRAMS POLICIES INCENTIVIZE END OF TRIP FACILITIES
EXPAND BIKE SHARE PROGRAMS ENCOURAGE DEVELOPMENT & ADOPTION POLICIES EXPAND CLUB RIDE TO SCHOOLS PROMOTE DIFFERENT BIKE/WALK ACTIVITIES AND EVENTS ENHANCE POSITIVE REINFORCEMENT
7
DESIGN GUIDELINES: FACILITIES
BICYCLE LANE BUFFERED BICYCLE LANE ONE-WAY SEPARATED BIKE LANE SHARED USE PATH / SIDEPATH
8
Existing Facility Network
868 total miles (1.2 mi/sq mi) 46% existing high comfort (6% on-street)
9
PROPOSED NETWORK Total network: 2,023 miles
10
RECOMMENDED FACILITY NETWORK
11
15% of collector and arterial mileage have high comfort bikeways
Existing Conditions 15% of collector and arterial mileage have high comfort bikeways (Level 1 or 2)
12
Future Conditions 46% of collector and arterial mileage will have high comfort bikeways (Level 1 or 2)
13
REGIONAL SIGNIFICANCE
PRIORITIZATION CRITERIA COMFORT & SAFETY ACCESS EQUITY & HEALTH REGIONAL SIGNIFICANCE FEASIBILITY
14
FUNDING SOURCES & STRATEGIES
30 different funding sources were identified: Local (municipal) State and regional (county and MPO) Federal Private, non-profit, and corporate
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.