Presentation is loading. Please wait.

Presentation is loading. Please wait.

Swakopmund desalination plant EIA: Numerical modelling results

Similar presentations


Presentation on theme: "Swakopmund desalination plant EIA: Numerical modelling results"— Presentation transcript:

1 Swakopmund desalination plant EIA: Numerical modelling results
Hardus Diedericks CSIR NATURAL RESOURCES AND THE ENVIRONMENT

2 Outline Assumed project description
Assumptions and limitations of the study Model results: waves, hydrodynamics, brine discharge and sediment transport Additional requirements Guidelines

3 Project description Provide numerical results to assess potential environmental impacts Brine disposal at two possible intake/discharge pipe layouts Sediment impacts at an intake basin Results are for an EIA

4 Conceptual layout of intake & discharge structures

5 Limitations and assumptions
Assessment based on project description as supplied Uncertainties: Pipeline locations, orientation, distance between intake and discharge pipes (parallel and perp.) Potable Water Produced (m3/day) Brine Discharge Volumes Intake Volumes Discharge Salinity (ppt) Increased Discharge Temperature (deg C) 80 000 90 000 65.9 1.0

6 Limitations and assumptions
Near-field behaviour based on conceptual designs, very near-field not resolved Diffuser length 200 metres 3D modelling needs improved input data and calibration data

7 Input data: NCEP waves

8 Wave reliability NCEP vs Slangkop wave climate Annual
Hmo exceedance: Slangkop (NCEP) 1% % % 25% % (5.7) (4.4) (3.8) (2.9) (2.3)

9 Input data: bathymetry

10 Model results: waves

11 Wave applications Waves are used in hydrodynamic simulations
(per month (season)) Make a look-up table (rapid transformation) (1997 – 2008)

12 Waves at northern discharge position
Pipe orientation approx 249o Waves approx 225o All waves

13 Waves at locations (10 years)
Northern location Southern location Proposed basin

14 Hydrodynamic modelling
Input requirements Wind, waves, offshore water temperature, surface heat fluxes (all concurrent) Bathymetry, beach profiles, D50 Calibration and verification data Simulation periods Jan 2007 (summer) June 2007 (winter) Calm season (still to do)

15 Input data: Winds (NCEP)

16 Model results: Currents

17 Model results: Currents

18 Near-field behaviours

19 Model results: Salinity (north option)

20 Model results: Salinity (south option)

21 Basin bathymetry

22 Suspended sediment transport

23 Required information Hydrodynamics: wind and atmospheric data
Hydrodynamics: calibration data (ADCP) Details of discharge and intake pipe locations Chemical discharged (biocides) Nearshore beach profiles at basin site Median grain sizes (offshore and onshore)

24 Analyses of results Salinity, temperature, biocides and achievable dilutions 80% to 99% exceedance contours Days of exceedance of a selected guideline

25 WQ Guidelines Salinity (< 1 psu or < 36 psu; < 40 psu)
Temperature (ΔT < 1ºC; ANZECC) Biocides (< 3 µg/ℓ) Achievable Dilutions (nominally > 100)