Operations Directors Conference October 9, 2001
Transwestern Pipeline Company Steve Harris Vice President Commercial Group
2
Overview 2001 Results 2002 Plan Market Environment Upside/Downside
Projects
3
2001 Third Current Estimate
As of 9/17/2001
4
2001 Successes $14.7 MM above Plan as of 3rd Current Estimate
Subscribed 106,700/d of Red Rock Expansion Capacity (15.5% ROE) All West & East mainline capacity, San Juan & Ignacio to Blanco capacity subscribed New Deal Structures: IT Pool to Pool at CA border (Reliant, Texaco) Index to Index deals (Sempra & Richardson) East to East sharing with alternate West (USGT & Astra)
5
2001 Successes (continued)
Renewed Navajo R-O-W Renewed Laguna R-O-W Marketing capacity through Enron Online Connected 26,000/d of new supply New 200,000/d pipeline interconnect with Oneok Dashboard & Pipeline Profile systems
6
Transwestern Pipeline Company Commercial Contribution
Commercial Group 2002 Operating Plan Commercial Contribution (Millions)
7
Capacity Subscription Level on Transwestern
(including Red Rock)
8
Expansions to California
Filed With the FERC WA 200,000 MMBtu/d Southern Trails PGT Kern EPNG TWPL OR ID WY NV 1,010,000 MMBtu/d UT CO CA 120,000 MMBtu/d OK 150,000 MMBtu/d AZ NM 230,000 MMBtu/d TX
9
Expansions to California Filed With the FERC
Project In-Service Volume TW Red Rock June, 2002 150,000/d EPNG August, 2001 230,000/d PGT (Phase I) November, 2001 200,000/d Southern Trails July, 2002 120,000/d Kern River May, 2002 125,000/d May, 2003 885,000/d TOTAL 1,710,000/d
10
Additional Expansions Announced
Project In-Service Volume TW Sun Devil January, 2004 330,000/d Sonoran (Phase I) Summer, 2003 750,000/d EPNG 320,000/d PGT November, 2003 400,000/d CIG Ruby December, 2003 TOTAL 2,550,000/d
11
NYMEX Prices ($/MMBtu)
12
Basin Prices, Border Prices & Transport Rates *
($/MMBtu) $0.320 $0.074 * Transport Rates are net of fuel.
13
Unhedged Fuel 2001 Actual prices 107% of plan prices
Actual unhedged volumes 213% of plan volumes 2002 Volumes to be significantly impacted by Red Rock outages (180,000/d April-May) I to I deals reduce volumes received in-kind
14
Fuel Prices 2001 vs. 2002 ($/MMBtu)
$3.96 $3.55
15
Potential Impacts 2002 Plan
Upside Negotiated rate proceeding: $10MM SoCal rate dispute: $2.2MM Downside Red Rock in-service delay: $1.124MM Gas prices: $.4MM (per $.10 variance) Agave & Amoco options to reduce MAXDTQ: $1.3MM
16
Load Factor Upside/Downside (Million $)
Revenue Difference 85% $202 90% $203 ($1.8) 92% $204 $0.7 95% $205 $1.7
17
Projects Red Rock Expansion Sun Devil Trans Pecos Southern Trails
Caithness/Big Sandy PG&E Potential Opportunities
18
Red Rock Expansion Incremental 120,000/d delivered to California & East of California Additional hp at Stations 1, 2, 3 & 4 1.210 Bcf/d total deliveries West Supplies from East of Thoreau In-service June, 2001 106,700/d subscribed, resulting in 15.5% ROE
19
Sun Devil Project $550 MM capital cost 450,000/d capacity to Phoenix
Nevada Utah Colorado NNG California Kansas New Mexico Sun Devil Oklahoma TWPL Phoenix Arizona Texas $550 MM capital cost 450,000/d capacity to Phoenix 780,000/d Blanco to Thoreau on TW 330,000/d to CA border on TW
20
Sun Devil Open Season Results
Path San Juan to Thoreau Thoreau to CA Border Thoreau to Phoenix Total Bids Received 651,000/d 265,000/d 440,000/d
21
TransPecos Project TW/KM LOI executed TP/Pemex LOI tendered:
Nevada Utah Colorado NNG California Kansas New Mexico Oklahoma TWPL Arizona Texas TW/KM LOI executed TP/Pemex LOI tendered: $.2950/MMBtu Pemex counter-offer: $.25/MMBtu NGPL TransPecos
22
Southern Trails Project
Nevada Utah Colorado NNG California Kansas Southern Trails New Mexico Oklahoma Arizona TWPL RFP to purchase West leg, due Oct 15th In-service 7/2002 “East” San Juan to CA border: 87,500 MMBtu/d “West” CA border to Long Beach: -120,000 MMBtu/d Texas
23
Caithness/Big Sandy Project
Nevada Utah Colorado NNG California Kansas New Mexico Arizona Oklahoma TWPL Big Sandy Texas Caithness will build 41 miles to TW Interconnect cost to TW, $550 K 780 MW baseload generating plant Phase I: 520 MW, 90,000/d, Q4 2003 Phase II: 260 MW, 40,000/d, Q3 2004
24
PG&E Potential Opportunities