Download presentation
Presentation is loading. Please wait.
1
Digital Data Submission (CAD) Standards
Fulton County Department of Public Works Colin Gowens GIS Manager
2
GOAL: KEEPING THE NETWORKS UP-TO-DATE!
WATER NETWORK WASTEWATER NETWORK
3
Why are we doing this? NPDES Permitting GASB 34 MNGWPD
EPD Audit Checklist CMOM More…… Might want to expand on all these a little. Some the developers will be familiar with others they will not be.
4
Why Electronic As-Builts
The “Best” Way More efficient than paper Review process can be automated Imports into GIS making data more timely Our Authority? Section 4.2.3, ~ C-4 of FC Subdivision Regulations Final Plat Remove Satellite; remove vertical bar
5
Electronic As-Builts Standards Review Import Support
Tied to GPS Monument Network Spatially Referenced Topology, Layer Names, Contents Templates created to make easier to implement Review Easy to Flag Errors Review Database Automatic Follow-up Letter Import One Step Hands Free (FME) Convert CAD to GDB keeping scale intact GPS Field Verify Subset of Points Support Training! Information On Web Site Remove Satellite; remove vertical bar
6
How did we develop the standard?
7
Modeled on CCWA Standard
Already is proven and accepted Builds standardization in the Metro Area for development community to follow Other communities are also looking at this model
8
Defining the Standard
9
Work with Development Community
Hold educational workshops for easy transition to new standard Make standards available online Have easy to use templates available Incentives 1) Sharing of GIS data (aerials, contours, etc.) 2) Increase approval turn-around time
10
County Staff Hold training workshops for County staff
Have automated review system to reduce review errors and misunderstanding Have an appeal process if submission fails
11
About the Templates Created for basic & advanced CAD packages including AutoCAD, AutoCAD LT, TurboCAD, IntelliCAD and so on Includes DWG, DWS, DWT, & DXF Working on Microstation seed files & cell libraries
12
FME CAD Verification Application
13
FME CAD Verification Application
14
FME CAD Verification Application
15
FME CAD Verification Application
16
Overview of Process Advantages Data Structures
Eliminate Unnecessary Steps Automation Use of SOP Data Structures Only What is Needed Consistency Receive Report with Errors Remove Satellite; remove vertical bar
17
ANOTHER OPTION FOR WATER/SEWER
Annual Contract for Survey & Inventory Deliver GIS Data Include CCTV Data Increase Impact Fee or Inspection Fee Per Point Cost (Water, Wastewater) Linear Foot Cost (CCTV Inspection) QA/QC Cost Option to do themselves How do we quantify cost savings?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.