1 Regulatory Permits for Activities Funded Under FIND’s Assistance Program
Tori White Deputy, Regulatory Division U.S. Army Corps of Engineers Jacksonville District May 19, 2017

2 Regulatory Authorities
2

3 Regulatory Program Goals
Protect navigation and prevent obstructions in the nation’s waters Provide strong protection of the nation's aquatic environment, including wetlands  Enhance the efficiency of regulatory program administration   Provide fair and reasonable decisions 3

4 Types of Permits Individual Permits. Project-unique evaluation & authorization. Standard Permits (SP). Involved process (public notice, agency review). Letters of Permission (LOP). Less controversial / Minor impacts Coordinate with agencies/neighbors (no public notice) General Permits. Similar activities resulting in minimal impacts to water quality and the environment, individually and cumulatively Must be reissued every five years Individual projects verified if meet terms and conditions of the General Permit. Nationwide permits (NWP) issued by Corps HQ Regional permits (RGP) issued by districts and divisions Programmatic permits (PGP) reduce duplication Summarize the IP process Compare GP to IP process 4

5 App Received from State Same process for new/renewal of GP
Corps Permit Process Verify PGP Verify GP/NWP Joint Permit App Submittal to State App Received from State Begin Processing Public Notice Corps Individuals Special Interests Other Agencies Application Approved Permit Issued Same process for new/renewal of GP Federally Recognized Tribes Adjacent Property Owners Application Denied 404(b)(1) Guidelines Public Interest Review Compliance with NEPA, ESA, NHPA, EFH, CZM, WQC ESA w/ NMFS for GP’s provides Project Design Criteria (PDCs)

6 Nationwide Permits (NWPs) (Expires March 18, 2022)
NWPs #1 & #2 – Aids to Navigation & Structures in Artificial Canals [canals within principally residential developments]. NWPs #3, #19 & #35 – Maintenance, Minor Dredging and Maintenance Dredging of Existing Basins. NWP #5 - Scientific Measurement Devices. NWP #7 - Outfall Structures & Associated Intake Structures. NWP #12 - Utility Line Activities. NWPs #13 & #54 - Bank Stabilization & Living Shorelines. NWP #22 - Removal of Vessels [or manmade obstructions]. NWP #27 - Aquatic Habitat Enhancement and Restoration Activities. NWP #28 – Modifications of Existing Marinas. NWP #33 - Temporary Construction, Access and Dewatering (also authorized under NWPs #3, #12 & #13 when associated with those activities). NWP #36 - Boat Ramps.

7 NWPs Major Changes* (Expires March 18, 2022)
*those changes that would be applicable to FIND projects. NWPs #1 - Aids to Navigation: Restrictions & coordination within Federal project channel and/or project lands. NWPs #3 - Maintenance: Can be used for removal of previously authorized works. Adds removal of accumulated sediment vicinity of an existing structure. NWP #35 - Maintenance Dredging of Existing Basins: Submittal required if within submerged aquatic vegetation. NWP #12 - Utility Line Activities: Exclude crossings of Federal channels (instead use Regional General Permits SAJ-13 for aerial crossings and SAJ-14 for subaqueous crossings). (continued next slide)

8 NWPs Major Changes (Expires March 18, 2022)
NWPs #13 Bank Stabilization: Waiver still possible greater than 500 linear feet but now cannot exceed 1,000 linear feet; and, Previously authorized structures adjacent to Federal channel destroyed by act of nature or other event require submittal/review pursuant to current setback guidance (is possible may not be authorized). NWPs #54 - Living Shorelines: New starting 2017 to provide an NWP in addition to the one for traditional stabilization (NWP #13); limit 500 linear feet along bank and 30 feet waterward (but can be waived). NWP #27 - Aquatic Habitat Enhancement and Restoration Activities: Must be planned, designed and implements so that results in aquatic habitat that resembles an ecological reference; and, Coordination required for thin-layer placement projects. NWP #28 – Modifications of Existing Marinas: Restrictions & coordination within Federal project channel and/or project lands.

9 State Programmatic General Permit SPGP-V (Expires July 25, 2021)
Shoreline Stabilization Docks, Piers, Pile Supported Structures Boat Ramps Maintenance dredging Transient Activities PDC prohibit adverse impacts to wetlands, seagrass, corals, and DCH. Other terms and conditions minimize impacts to the aquatic resources.

10 SPGP-V Exclusion Areas
Acropora Critical Habitat (CH) Johnson’s seagrass CH Smalltooth Sawfish CH (except permitted channels maintained greater than 3’) Monroe County (except for boat lifts) Privately owned parcels 90% open water 50% seagrass Neighbors similar to

11 PGP SAJ-42 Minor Activities
in Miami-Dade County (Expires April 29, 2018) Shoreline Stabilization Maintenance dredging of residential canals Subaqueous utility lines Stormwater outfalls Minor Structures Piers and docks Private single-family floating vessel platforms PDC prohibit adverse impacts to wetlands, seagrass, corals, and EFH. Other terms and conditions minimize impacts to the aquatic resources.

12 Other General Permits RGP SAJ-17 Minor Structures
RGP SAJ-33 Government Piers RGP SAJ-34 Commercial Piers PGP SAJ-67 Minor Activities in the Okeechobee Waterway PDC prohibit adverse impacts to wetlands, seagrass, corals, and EFH; Dock & Johnson’s Construction Guidelines; piers limited to 1000 sf and 5 slips.

13 Statewide Programmatic Biological Opinion (SWPBO)
SWPBO PDC All projects/permit types Activity specific Critical Habitat specific Noise Best Management Practices Metal pilings/sheet piles by impact hammer not authorized If 5 or more concrete pilings a day using impact hammer in confined space, must use noise abatement measures

14 SWPBO Covered Activities
Shoreline stabilization Pile-supported structures Maintenance and minor dredging Reconfiguration and repair of docking facilities within a marina Outfall structures Scientific survey devices Boat ramps Aquatic habitat enhancement and restoration activities Aerial and subaqueous utility and transmission lines Marine debris removal Temporary platforms, access fill, and cofferdams

15 SWPBO PDC NMFS Sea Turtle & Smalltooth Sawfish Construction Conditions
Vessels cannot be closer than 500 yards of a right whale Turbidity control measures Exclusion areas Reporting of collisions with listed species In-water rope or chains that do not loop or tangle Best Management Practices Prior approval from Marine Sanctuary All work during daylight hours

16 Shoreline Stabilization PDC
500’ in length or 18” waterward of MHWL or existing seawall Riprap cannot extend more than 10’ waterward of MHWL Pile Supported Structures PDC Dock construction guidelines Johnson’s seagrass construction guidelines Mangrove removal limited to 4’ in width Allows up to 20 slips

17 Dredging PDC Maintenance dredging limited to authorized depth or -5’ MLW New dredging limited to 1200 sf Excludes federal channel Excludes impact to listed seagrass, corals

18 Marina Reconfig/Repair PDC
No increase in the total number of slips or an increase in size of the outer perimeter Excludes impact to listed seagrass, corals, mangroves Dock construction guidelines

19 Boat Ramp PDC Debris Removal PDC
Motorized new ramps limited to 40’ wide, 2 lanes, & 70 spaces for trailers Non-motorized new ramps limited to 60’ wide Excludes impact to listed seagrass, coral, mangroves Debris Removal PDC Requires visual confirmation and removal by lifting

20 Aquatic Restoration PDC
Excludes impact to listed seagrass, corals, mangroves Reefs limited to 20’ in length separated by 3’ wide channel Exclusion cages around seagrass transplant sites Living shorelines limited to 500’ in length, 35’ waterward of HTL, 0.5 ac between shore and waterward structure New artificial reef sections limited to 40 ac with 500’ buffer

21 Acropora CH Seawalls, Pile Supported Structures, Boat Ramps:
New or expanded activity not authorized where essential features are present Repair and replacement allowed within existing footprint Dredging, Marina reconfig/repair Excluded where essential features are present Aquatic Restoration:

22 Johnson’s Seagrass CH Marina Reconfig/Repair: Boat Ramps:
Allowed if area of impact does not exceed original marina Boat Ramps: Activities that remove essential features are not authorized Aquatic Restoration: Living shorelines excluded Reefs can be authorized if in waters deeper than 12’ deep

23 Essential Features Acropora CH (73 FR 72210, 11/26/2008)
Natural consolidated hard substrate or dead coral skeleton that is free from fleshy or turf macroalgae and sediment cover Johnson’s Seagrass CH (65 FR 17786, 04/05/2000) Adequate water quality, salinity levels, water transparency, and stable, unconsolidated sediments that are free from physical disturbance

24

25

26 NMFS Pilot Project for Informal Consultation
Implemented in March 2016 Minimal effects to NMFS ESA resources & DCH & low litigation risk Action Agency develops consultation request document of potential effects NMFS provides written concurrence Avg time frame of 60 days

27 Jacksonville Programmatic Biological Opinion (JAXBO) (pending)
Informs SPGP-V AND consolidates ESA consultation requirements with NMFS for covered activities Provides more flexibility for PDCs No limit on repair/replacement of shoreline stabilization Includes new Dock Construction Guidelines Covers up to 50 slips for new construction Boat ramp parking reduced to 50 spaces Increases dredging depth and area Includes muck removal as aquatic restoration activity Includes Mooring Fields - will require EFH consultation & modification of SPGP-V

28 Entanglement and Entrapment
NMFS provided report on Potential Impact of Artificial Reefs on Sea Turtle Conservation in FL, January 2017 Numerous documented accounts of entanglement and entrapment of sea turtles in artificial reef materials Entanglement in marine debris affects over 200 species ESA Consultation is typically formal for structures such as artificial reefs, fishing piers pyramidal modules should have openings >4’ recommend periodic line removal in depths < 40m

29 Helpful Hints Submit permit applications EARLY
Maximize use of efficiencies e.g.NWPs, GPs, SWPBO Ensure Pre-construction notification includes PDCs Request pre-application meeting for “big” projects Ensure application is COMPLETE (Corps supplemental form; ENG 4345) Include Section 7 Checklist if not covered programmatically Include survey of aquatic resources

30 SAJ Permit Offices

31 FIND Assistance Applicants
BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District

32 Questions ? BUILDING STRONG® US ARMY CORPS OF ENGINEERS | Jacksonville District