Long Term Accommodation Strategy Update Report September 6, 2016
1
Why? In 2014: The Board completed a Long Term Accommodation Strategy
In 2016: the Board completed an update to the LTAS recommendations that took into consideration – 2014/15 & 2015/16 enrolment actuals, updated enrolment projections, updated condition data and recent accommodation decisions made by the Board. In addition, there have been a number of funding and grant changes made by the Ministry of Education since the original report. Current Situation: The 5 year Board-wide renewal event costs total $285 million Board-wide FCI = 49.8% Annual operations costs average approximately $18.1 million Currently (2015/16) the Board operates at: 74% utilization of permanent space on the elementary panel Projected utilization rate of ~80% 63% utilization of permanent space on the secondary panel Projected utilization rate of ~67% 1
2
Updated Enrolment Projection and Accommodation Review Recommendations
Review Areas Updated Enrolment Projection and Accommodation Review Recommendations
3
RA01 (Bruce Peninsula/Peninsula Shores)
3
4
RA01 (Bruce Peninsula/Peninsula Shores) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Amabel-Sauble Community School 256 143 151 147 146 Bruce Peninsula District School (Elem) 249 182 164 145 Hepworth Central School 568 282 261 250 245 Peninsula Shores District School (Elem) 326 345 358 356 357 St. Edmunds Public School 107 33 36 41 43 Total Elementary Enrolment 1,506 984 970 940 936 Total Surplus/Deficit Space -522 -536 -566 -570 Total Utilization Rate 65% 64% 62% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Bruce Peninsula District School (Sec) 159 55 81 76 67 Peninsula Shores District School (Sec) 432 232 233 244 252 Total Secondary Enrolment 591 288 313 320 319 Total Surplus/Deficit Space -303 -278 -271 -272 Total Utilization Rate 49% 53% 54% Overall, the updated enrolment projections are fairly consistent with the original projections on a review area basis 4
5
RA01 (Bruce Peninsula/Peninsula Shores) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Close two elementary schools (St. Edmunds/Bruce Peninsula Elementary) and one secondary school (Bruce Peninsula Secondary) Seek funding to construct 1 new elementary replacement facility (Bruce/St. Edmunds). Consolidated secondary students to be redirected to Peninsula Shores DS (Secondary). Hepworth Central School receives enrolment from the Hillcrest ‘satellite’ area and a portion of enrolment from the Derby closure (see RA03). Amabel-Sauble CS receives enrolment from the GC Huston PS closure (see RA02). RECENT ACCOMMODATION DECISIONS Boundary reconfiguration for Hepworth Central School due to the closure of Derby PS starting September 2016 (see RA03) UPDATED RECOMMENDATIONS Scenario 1: Consistent with original recommendations Scenario 2: Consistent with original recommendations, however Amabel-Sauble CS would be impacted by alternative recommendations made in another review area, whereby this facility would not receive enrolment from a school closure in RA02 (GC Huston). 5
6
RA01 (Bruce Peninsula/Peninsula Shores) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Amabel-Sauble Community School 256 143 225 219 221 Bruce Peninsula District School (Elem) 190 182 200 188 Hepworth Central School 568 282 261 250 245 Peninsula Shores District School (Elem) 326 345 358 356 357 St. Edmunds Public School 33 Total Elementary Enrolment 1,340 984 1,044 1,013 1,011 Total Surplus/Deficit Space -522 -296 -327 -329 Total Utilization Rate 65% 78% 76% 75% Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Bruce Peninsula District School (Sec) 55 Peninsula Shores District School (Sec) 432 232 313 320 319 Total Secondary Enrolment 288 Total Surplus/Deficit Space -303 -119 -112 -113 Total Utilization Rate 49% 73% 74% If implemented, total capacity can be reduced by 325 spaces, resulting in a long term utilization rate of 75% In addition, renewal needs could be reduced by $13.4 million with school closures 6
7
RA01 (Bruce Peninsula/Peninsula Shores) Scenario 2 Enrolment Projections
Scenario 2 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Amabel-Sauble Community School 256 143 151 147 146 Bruce Peninsula District School (Elem) 190 182 200 188 Hepworth Central School 568 282 261 250 245 Peninsula Shores District School (Elem) 326 345 358 356 357 St. Edmunds Public School 33 Total Elementary Enrolment 1,340 984 970 940 936 Total Surplus/Deficit Space -522 -370 -400 -404 Total Utilization Rate 65% 72% 70% Scenario 2 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Bruce Peninsula District School (Sec) 55 Peninsula Shores District School (Sec) 432 232 313 320 319 Total Secondary Enrolment 288 Total Surplus/Deficit Space -303 -119 -112 -113 Total Utilization Rate 49% 73% 74% If implemented, total capacity can be reduced by 325 spaces, resulting in a long term utilization rate of 71% In addition, renewal needs could be reduced by $13.4 million with school closures 7
8
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton)
8
9
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton) Status Quo Enrolment Projections Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Arran Tara Elementary School 400 386 410 426 421 G C Huston Public School 432 243 264 260 270 Chesley District CS (Elem) 329 352 363 351 349 Northport Elementary School 416 428 431 437 Paisley Central School 245 136 118 109 Port Elgin-Saugeen Central School 694 591 632 658 687 Total Elementary Enrolment 2,510 2,124 2,214 2,235 2,273 Total Surplus/Deficit Space -386 -296 -275 -237 Total Utilization Rate 85% 88% 89% 91% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Chesley District CS (Sec) 189 159 179 193 186 Saugeen District SS 933 545 531 683 619 Total Secondary Enrolment 1,122 704 709 876 805 Total Surplus/Deficit Space -418 -413 -246 -317 Total Utilization Rate 63% 78% 72% Overall, the updated enrolment projections are higher than the original projections on a review area basis This is likely the result of local employment trends (i.e. Bruce Power) as well as recent accommodation decisions 9
10
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton) Accommodation Decisions and Recommendations ORIGINAL RECOMMENDATIONS Convert Saugeen DSS to a 7-12 facility; Northport ES and Port-Elgin CS to JK-6 facilities Closure of GC Huston with enrolment directed to Amabel-Sauble Community School, Northport ES and Saugeen DSS. Boundary adjustment between Northport ES and Port Elgin-Saugeen Central School. Closure of Paisley elementary with enrolment directed to Chesley District CS (Elem). Closure of Chesley District CS secondary portion with enrolment directed to Saugeen DSS and John Diefenbaker SS. Arran-Tara ES receives enrolment from Derby PS and Sullivan PS closures. RECENT ACCOMMODATION DECISIONS Kinghurst Community School closed September 2014 Chesley District High School became a grade JK-12 school in September 2014. Boundary reconfiguration for Arran-Tara ES due to the closure of Derby PS starting in September 2016 (see RA03). 10
11
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton) Accommodation Decisions and Recommendations UPDATED RECOMMENDATIONS Scenario 1: Consistent with original recommendations (i.e model). Due to recent accommodation decisions, the recommendation has changed slightly to redirect enrolment from Chesley District closure to Saugeen DSS and Walkerton District (Sec) Scenario 2: Alternative scenario that maintains current grade structure (i.e. JK-8 and 9-12) As a result of this alternate scenario, some of the recommendations in Scenario 1 were revised. Namely, the recommended closure of GC Huston has been removed, as there would not be sufficient space in the surrounding schools to accommodate the additional enrolment from the closure if the current grade JK-8 elementary structure is maintained. 11
12
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton) Scenario 1 Enrolment Projections Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Arran Tara Elementary School 400 386 410 426 421 G C Huston Public School 243 Chesley District CS (Elem) 539 352 481 459 457 Northport Elementary School 416 404 405 415 Paisley Central School 136 Port Elgin-Saugeen Central School 694 591 580 602 625 Total Elementary Enrolment 2,043 2,124 1,876 1,892 1,919 Total Surplus/Deficit Space -386 -167 -151 -124 Total Utilization Rate 85% 92% 93% 94% Scenario 1 Projected 7-12 Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Chesley District CS (Sec) 159 Saugeen District SS (7-12) 933 545 831 992 935 Total Enrolment 704 Total Surplus/Deficit Space -418 -102 59 2 Total Utilization Rate 63% 89% 106% 100% If implemented, total capacity can be reduced by 656 spaces (18%), resulting in a long term utilization rate of ~100%. In addition, renewal needs could be reduced by $10 million with school closures 12
13
RA02 (Saugeen Shores, Arran-Elderslie, North Kincardine, North Brockton) Scenario 2 Enrolment Projections Scenario 2 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Arran Tara Elementary School 400 386 410 426 421 G C Huston Public School 432 243 264 260 270 Chesley District CS (Elem) 539 352 481 459 457 Northport Elementary School 416 428 431 437 Paisley Central School 136 Port Elgin-Saugeen Central School 694 591 632 658 687 Total Elementary Enrolment 2,475 2,124 2,214 2,235 2,273 Total Surplus/Deficit Space -386 -261 -240 -202 Total Utilization Rate 85% 89% 90% 92% Scenario 2 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Chesley District CS (Sec) 159 Saugeen District SS 933 545 567 722 656 Total Secondary Enrolment 704 Total Surplus/Deficit Space -418 -366 -211 -277 Total Utilization Rate 63% 61% 77% 70% If implemented, total capacity can be reduced by 242 spaces, resulting in a long term utilization rate of 86% In addition, renewal needs could be reduced by $3 million with school closures 13
14
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs)
14
15
Status Quo Projected Elementary Enrolment Trends:
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Status Quo Enrolment Projections Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1** Year 5 Year 10 Year 15 Alexandra Community School 271 196 222 247 273 Bayview Public School* 219 Derby Public School (recently closed) Dufferin Elementary School* 200 Hillcrest Elementary School 660 526 625 599 612 Holland-Chatsworth Central School 340 248 234 226 230 Keppel-Sarawak Elementary School 377 320 368 369 371 Sullivan Community School 236 148 150 141 145 Sydenham Community School* 528 New Owen Sound CVI Elementary* 800 778 814 Total Elementary Enrolment 2,684 2,385 2,377 2,383 2,446 Total Surplus/Deficit Space -797 -307 -301 -238 Total Utilization Rate 75% 89% 91% *Bayview PS, Dufferin ES and Sydenham CS will be closed effective September The New Owen Sound CVI Elementary will be open effective September 2017 **Total Capacity for Year 1 = 3,182 Most of the updated projections are consistent with the original projections, with the exception of Keppel-Sarawak ES and Sydenham CS For those schools, the actual enrolment in recent years was higher than originally anticipated 15
16
Status Quo Projected Secondary Enrolment Trends:
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Status Quo Enrolment Projections Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Owen Sound District SS (formerly West Hill SS) 1,242 1,330 1,185 1,178 1,204 Total Secondary Enrolment Total Surplus/Deficit Space 88 -57 -64 -38 Total Utilization Rate 107% 95% 97% Overall, the updated enrolment projections are relatively consistent with the original projections on a review area basis 16
17
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Accommodation Decisions and Recommendations ORIGINAL RECOMMENDATIONS Convert both Owen Sound CVI and West Hill SS to grade 7-12 facilities. Convert Alexandra CS and Sydenham CS to JK-6 facilities with grade 7-8 enrolment directed to Owen Sound CVI. Move grade 7-8 program from Hillcrest ES to West Hill SS. Closure of Bayview PS with JK-6 enrolment directed to Alexandra CS and Sydenham CS and grade 7-8 enrolment to Owen Sound CVI. Closure of Dufferin ES with enrolment directed to Hillcrest CS. Closure of Derby PS with enrolment directed to Hillcrest CS, Arran-Tara CS, Holland-Chatsworth CS and Hepworth CS Closure of Sullivan CS with enrolment directed to Holland-Chatsworth CS/Arran-Tara CS. Owen Sound CVI receives a portion of enrolment from Georgian Bay SS closure Keppel Sarawak ES receives enrolment from a Hillcrest ‘satellite’ boundary. Submit business case to Ministry of Education to seek funding for a new replacement school for Hillcrest ES. 17
18
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Accommodation Decisions and Recommendations RECENT ACCOMMODATION DECISIONS Closure of Derby PS (September 2016). Students redirected to surrounding schools. Owen Sound CVI students directed to Owen Sound District SS (formerly West Hill SS) effective September 2016 Closure of Bayview and Sydenham elementary schools with enrolment directed to Owen Sound CVI (conversion) (2017) Closure of Dufferin elementary school (2017) UPDATED RECOMMENDATIONS Board staff has worked through the original recommendations made in the 2014 report. It is recommended that the Board consider the closure of Sullivan CS with enrolment redirect to Holland-Chatsworth Central School. Due to poor condition and high renewal needs, it is recommended that the Board seek funding for two replacement facilities for Owen Sound District SS (formerly West Hill SS) and Hillcrest ES. Business Case Submission In Process 18
19
Scenario 1 Projected Elementary Enrolment Trends:
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Scenario 1 Enrolment Projections Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1** Year 5 Year 10 Year 15 Alexandra Community School 271 196 222 247 273 Bayview Public School* 219 Dufferin Elementary School* 200 Hillcrest Elementary School 660 526 625 599 612 Holland-Chatsworth Central School 340 248 383 367 375 Keppel-Sarawak Elementary School 377 320 368 369 371 Sullivan Community School 148 Sydenham Community School* 528 New Owen Sound CVI Elementary* 800 778 814 Total Elementary Enrolment 2,448 2,385 2,377 2,383 2,446 Total Surplus/Deficit Space -797 -71 -65 -2 Total Utilization Rate 75% 97% 100% *Bayview PS, Dufferin ES and Sydenham CS will be closed effective September The New Owen Sound CVI Elementary will be open effective September 2017 **Total Capacity for Year 1 = 3,182 19
20
Scenario 1 Projected Secondary Enrolment Trends:
RA03 (Owen Sound, Chatsworth, West Meaford, East Georgian Bluffs) Scenario 1 Enrolment Projections Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Owen Sound District SS (formerly West Hill SS) 1,242 1,330 1,185 1,178 1,204 Total Secondary Enrolment Total Surplus/Deficit Space 88 -57 -64 -38 Total Utilization Rate 107% 95% 97% If implemented, total capacity can be reduced by 236 spaces resulting in a long term utilization rate of approximately 100% In addition, renewal needs could be reduced by more than $4 million with school closure If replacement facilities for Owen Sound District SS (formerly West Hill SS) and Hillcrest ES are approved by the Ministry of Education, the renewal needs could be further reduced by more than $37.5 million 20
21
RA04 (Huron-Kinloss, Kincardine South)
21
22
RA04 (Huron-Kinloss, Kincardine South) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Elgin Market Public School 222 193 233 248 263 Huron Heights Public School 344 325 337 397 416 Kincardine Township-Tiverton Public School 375 321 350 367 388 Lucknow Central Public School 306 132 120 112 114 Ripley-Huron Community School 351 272 264 242 239 Total Elementary Enrolment 1,598 1,243 1,303 1,366 1,420 Total Surplus/Deficit Space -355 -295 -232 -178 Total Utilization Rate 78% 82% 85% 89% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Kincardine DSS 714 451 522 547 585 Total Secondary Enrolment Total Surplus/Deficit Space -263 -192 -167 -129 Total Utilization Rate 63% 73% 77% 82% Overall, the updated enrolment projections are higher than the original projections on a review area basis. Most of the differences in facility enrolment projections are due to actual enrolment in recent years that was either higher (i.e. Huron Heights PS, Kincardine Township-Tiverton PS) or lower (i.e. Elgin Market PS) than originally anticipated. 22
23
RA04 (Huron-Kinloss, Kincardine South) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Closure of Lucknow Central PS with enrolment redirected to Hillcrest Central School (see RA07) Monitor enrolments at new single track French immersion program at Elgin Market PS RECENT ACCOMMODATION DECISIONS Elgin Market PS has become a JK-8 French immersion only schools (September 2013) Kincardine Township-Tiverton PS has become a JK-3 English stream only school (September 2013) Huron Heights PS has become a Gr 4- 8 English stream only school (September 2013) UPDATED RECOMMENDATIONS No changes to original recommendations 23
24
RA04 (Huron-Kinloss, Kincardine South) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Elgin Market Public School 222 193 233 248 263 Huron Heights Public School 344 325 337 397 416 Kincardine Township-Tiverton Public School 375 321 350 367 388 Lucknow Central Public School 132 Ripley-Huron Community School 351 272 264 242 239 Total Elementary Enrolment 1,292 1,243 1,183 1,254 1,306 Total Surplus/Deficit Space -355 -109 -38 14 Total Utilization Rate 78% 92% 97% 101% Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Kincardine DSS 714 451 522 547 585 Total Secondary Enrolment Total Surplus/Deficit Space -263 -192 -167 -129 Total Utilization Rate 63% 73% 77% 82% If implemented, total capacity can be reduced by 306 spaces, resulting in a long term utilization rate of ~90% In addition, renewal needs could be reduced by approximately $650,000 with school closure 24
25
RA05 (Hanover, West Grey, West Southgate)
25
26
RA05 (Hanover, West Grey, West Southgate) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Dawnview Public School 239 193 207 198 194 Egremont Community School 210 204 186 168 164 Hanover Heights Community School 517 382 357 368 362 Normanby Community School 317 165 166 160 Spruce Ridge Elementary School 516 409 402 428 433 John Diefenbaker SS (Elem) 161 139 143 136 Total Elementary Enrolment 1,960 1,521 1,461 1,463 1,449 Total Surplus/Deficit Space -439 -499 -497 -511 Total Utilization Rate 78% 75% 74% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 John Diefenbaker SS (Sec) 918 637 563 522 515 Total Secondary Enrolment Total Surplus/Deficit Space -281 -355 -396 -403 Total Utilization Rate 69% 61% 57% 56% Overall, the updated enrolment projections are relatively consistent with the original projections on a review area basis 26
27
RA05 (Hanover, West Grey, West Southgate) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Expand the grade 7-8 program at John Diefenbaker SS (Elem) to encompass Spruce Ridge ES and Normanby CS. Closure of Egremont CS with enrolment directed to Spruce Ridge ES and Normanby CS. Convert Spruce Ridge ES and Normanby CS to JK-6 facilities with grade 7-8 enrolment to Diefenbaker SS (Elem). John Diefenbaker SS (Sec) receives a portion of secondary enrolment from Chesley District CS consolidation. Spruce Ridge ES receives a portion of enrolment from Beavercrest Community School. Business Case to the Ministry of Education to seek funds for a new replacement grade 7-12 facility to replace the existing John Diefenbaker SS. RECENT ACCOMMODATION DECISIONS In 2015, the Board received notice on funding for construction of a replacement facility for John Diefenbaker SS (set to open in September 2018). UPDATED RECOMMENDATIONS It is still recommended that the Board close Egremont CS Due to recent accommodation decisions (i.e. replacement facility), it is recommended that the Board maintains current grade structure at remaining facilities. In addition, John Diefenbaker SS will no longer receive enrolment from the Chesley District (Sec) closure. 27
28
RA05 (Hanover, West Grey, West Southgate) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Dawnview Public School 239 193 207 198 194 Egremont Community School 204 Hanover Heights Community School 517 382 357 368 362 Normanby Community School 317 295 283 274 Spruce Ridge Elementary School 516 409 500 524 528 John Diefenbaker SS (Elem) 161 139 143 136 Total Elementary Enrolment 1,750 1,521 1,503 1,508 1,495 Total Surplus/Deficit Space -439 -247 -242 -255 Total Utilization Rate 78% 86% 85% Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 John Diefenbaker SS (Sec) 576 637 563 522 515 Total Secondary Enrolment Total Surplus/Deficit Space -281 -13 -54 -61 Total Utilization Rate 69% 98% 91% 89% If implemented, total capacity can be reduced by 552 spaces, resulting in a long term utilization rate of 86% Renewal needs could be reduced by $44.5 million with school closure. 28
29
RA06 (Grey Highlands, Southgate East)
29
30
RA06 (Grey Highlands, Southgate East) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Beavercrest Community School 314 192 170 182 181 Dundalk Highpoint School 322 207 228 248 264 Macphail Memorial Elementary School 600 507 519 502 498 Osprey Central School 351 327 297 301 Dundalk & Proton Community School 300 225 230 244 Total Elementary Enrolment 1,887 1,457 1,462 1,472 1,487 Total Surplus/Deficit Space -430 -425 -415 -400 Total Utilization Rate 77% 78% 79% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Grey Highlands SS 1,011 622 617 686 668 Total Secondary Enrolment Total Surplus/Deficit Space -389 -394 -325 -343 Total Utilization Rate 61% 68% 66% Overall, the updated enrolment projections were lower than the original projections for most schools This is likely a result of an updated growth forecast for Grey County that was lower than the previous residential forecast used 30
31
RA06 (Grey Highlands, Southgate East) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Closure of Beavercrest CS with enrolment directed to Macphail Memorial ES, Spruce Ridge ES and Holland-Chatsworth CS. Boundary change between Macphail Memorial ES, Dundalk Highpoint School and Dundalk & Proton CS. Grey Highlands SS receives a portion of enrolment from the Georgian Bay SS closure. RECENT ACCOMMODATION DECISIONS No recent accommodation decisions UPDATED RECOMMENDATIONS No significant changes were made to the original recommendations Lower enrolment projections in the area has likely eliminated the need to conduct a boundary change between Macphail Memorial ES, Highpoint School and Dundalk & Proton CS In addition, due to recent accommodation decisions made by the Board (i.e. JK-12 replacement facility in Meaford), Grey Highlands SS will no longer receive a portion of enrolment from Georgian Bay SS closure. 31
32
RA06 (Grey Highlands, Southgate East) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Beavercrest Community School 192 Dundalk Highpoint School 322 207 228 248 264 Macphail Memorial Elementary School 600 507 647 638 633 Osprey Central School 351 327 314 297 301 Dundalk & Proton Community School 300 225 230 244 Total Elementary Enrolment 1,573 1,457 1,419 1,427 1,442 Total Surplus/Deficit Space -430 -154 -146 -131 Total Utilization Rate 77% 90% 91% 92% Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Grey Highlands SS 1,011 622 617 686 668 Total Secondary Enrolment Total Surplus/Deficit Space -389 -394 -325 -343 Total Utilization Rate 61% 68% 66% If fully implemented, total capacity could be reduced by 314 spaces, resulting in long term utilization rates of approximately 82% for this review area In addition, renewal needs could be reduced by more than $2.6 million with the elementary school closure 32
33
RA07 (South Bruce, Brockton South)
33
34
RA07 (South Bruce, Brockton South) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Hillcrest Central School 245 106 103 101 100 Mildmay-Carrick Central School 268 144 129 109 Walkerton DSS (Elem) 445 369 328 308 305 Total Elementary Enrolment 958 619 561 518 509 Total Surplus/Deficit Space -339 -397 -440 -449 Total Utilization Rate 65% 59% 54% 53% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Walkerton DSS (Sec) 468 342 328 271 256 Total Secondary Enrolment Total Surplus/Deficit Space -126 -140 -197 -212 Total Utilization Rate 73% 70% 58% 55% Overall, the updated enrolment projections are relatively consistent with the original projections on a review area basis. 34
35
RA07 (South Bruce, Brockton South) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Closure of Mildmay-Carrick Central School with enrolment directed to Walkerton District (Elem). Hillcrest Central School receives enrolment from the Lucknow PS closure (see RA04). Monitor secondary enrolments at Walkerton District (Sec). RECENT ACCOMMODATION DECISIONS No recent accommodation decisions made by the Board UPDATED RECOMMENDATIONS No significant changes were made to original recommendations with the exception of Walkerton District (Sec) Due to the secondary closure in RA02 (i.e. Chesley District), some enrolment has be redirected to Walkerton District Secondary School in the updated recommendations, which has resulted in an increased utilization of space at this facility. 35
36
RA07 (South Bruce, Brockton South) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Hillcrest Central School 245 106 223 213 215 Mildmay-Carrick Central School 144 Walkerton DSS (Elem) 445 369 457 417 409 Total Elementary Enrolment 690 619 680 630 623 Total Surplus/Deficit Space -339 -10 -60 -67 Total Utilization Rate 65% 99% 91% 90% Scenario 1 Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Walkerton DSS (Sec) 468 342 471 425 405 Total Secondary Enrolment Total Surplus/Deficit Space -126 3 -43 -63 Total Utilization Rate 73% 101% 91% 87% If fully implemented, this strategy could reduced capacity by 268 spaces, resulting in long term utilization rates of more than 89% for this review area In addition, renewal needs would be reduced by approximately $3 million with the elementary school closure. 36
37
RA08 (Georgian Bay) 37
38
RA08 (Georgian Bay) Status Quo Enrolment Projections
Status Quo Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Beavervalley Community School 525 397 437 430 Meaford Community School 420 264 287 289 293 St. Vincent-Euphrasia Elementary School 357 311 328 326 314 Total Elementary Enrolment 1,302 972 1,051 1,045 1,038 Total Surplus/Deficit Space -330 -251 -257 -264 Total Utilization Rate 75% 81% 80% Status Quo Projected Secondary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Georgian Bay SS 936 341 320 380 374 Total Secondary Enrolment Total Surplus/Deficit Space -595 -616 -556 -562 Total Utilization Rate 36% 34% 41% 40% Overall, the updated enrolment projections are relatively consistent with the original projections on a review area basis. 38
39
RA08 (Georgian Bay) Accommodation Decisions and Recommendations
ORIGINAL RECOMMENDATIONS Closure of Georgian Bay SS with enrolment directed to Owen Sound CVI and Grey Highlands secondary schools. Attendance boundary change between Beaver Valley CS, Meaford CS and St. Vincent-Euphrasia ES. Closure of Meaford CS and St. Vincent-Euphrasia ES with enrolment directed to a new JK-8 elementary replacement facility. RECENT ACCOMMODATION DECISIONS The Board recently submitted a Business Case to consolidate two elementary schools (Meaford Community School and St. Vincent-Euphrasia Elementary School) and one secondary school (Georgian Bay Secondary School) and construct a new JK-12 facility in September 2019. In the interim, Meaford CS will close effective September All JK-3 enrolment in the area will attend St. Vincent and all grade 4-8 enrolment will attend Georgian Bay SS. The MOE has recently approved this Business Case. 39
40
RA08 (Georgian Bay) Accommodation Decisions and Recommendations
UPDATED RECOMMENDATIONS Board staff has worked through the original recommendations from the 2014 report and modified the recommendations made for this area in an effort to retain a secondary presence The Board recently received approvals to consolidate two elementary schools and the secondary school and build a new grade JK-12 school as a replacement. In addition, due to these recent accommodation decisions, the proposed boundary change with Beaver Valley Community School is no longer necessary 40
41
RA08 (Georgian Bay) Scenario 1 Enrolment Projections
Scenario 1 Projected Elementary Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Beavervalley Community School 525 397 437 430 Meaford Community School St. Vincent-Euphrasia Elementary School 311 Total Elementary Enrolment 707 Total Surplus/Deficit Space -175 -88 -95 Total Utilization Rate 80% 83% 82% Scenario 1 Projected JK-12 Enrolment Trends: School/Facility Capacity Year 1 Year 5 Year 10 Year 15 Replacement JK-12 Georgian Bay Facility 1,033 605 934 995 981 Total JK-12 Enrolment Total Surplus/Deficit Space -331 -99 -38 -52 Total Utilization Rate 65% 90% 96% 95% This strategy will eliminate 680 surplus spaces from the Board’s inventory, and result in long term utilization rates of above 90% for this review area In addition, more than $40 million in renewal needs has been eliminated as a result of school closures in this area 41