Download presentation
Presentation is loading. Please wait.
1
Introducing Coolnomix™
2
Contents Setting the Scene: Energy Consumption
Introduction to Coolnomix™ Case Studies Q & A
3
Energy Consumption (1) Environmental pressures:
governments are increasingly legislating to reduce energy consumption governments are exploring “carbon” taxation consumers and business partners are beginning to discriminate based on environmental factors
4
Energy Consumption (2) Business pressures:
global competition continuously puts pressure on costs Cooling is a significant contributor to energy consumption and costs air-conditioning accounts for nearly 29% of all electricity consumption air-conditioning + refrigeration accounts for more than 35% of all consumption for comparison, lighting accounts for 12.5% of all consumption Note 1: Hong Kong End-use Data 2010 (EMSD, Sep 2012)
5
Coolnomix™ is a patent pending product range of Agile8
Agile8’s objective is to reduce worldwide running costs of refrigerant based cooling systems by 30% Both retrofit and new systems
6
Some of our customers…
7
Coolnomix ORS™ leverages a key cooling plant design objective
Energy savings are achieved by patent pending Coolnomix ORS™ - Optimized Refrigerant Supply Coolnomix ORS™ leverages a key cooling plant design objective designed plant capacity exceeds peak demand to provide a margin of safety Coolnomix ORS™ operates to reduce operational costs whilst improving temperature stability
8
Coolnomix™ employs dual temperature sensors, one for the space temperature the other for the cold supply single sensor cooling systems operate “blind” Coolnomix™’s second sensor provides feedback on compressor’s hydraulic work Energy savings: cold supply temperature used as a proxy for deciding when the compressor has completed its work compressor then switched off until further refrigerant compression is needed
9
Improved temperature stability:
Coolnomix™’s dual sensors maintain space temperatures within +/- 0.25˚C ORS™ incorporates: a priority on achieving and maintaining space set temperature protection against frequent stop/start of the compressor ORS™ eliminates dripping, increasingly a focus of legislation
10
COOLNOMIX ORS Technology
11
Retrofit Applications
12
Retrofit Applications (1)
Coolnomix™ units can be deployed for savings on: any refrigerant based air-conditioner or refrigerator, including split-type air-conditioners window-type air-conditioners package type air-conditioners industrial size air-conditioners and refrigerators VRV/VRF/Inverter type air-conditioners cooling systems operating between 0oC and 31oC
13
Retrofit Applications (2)
Coolnomix™ retrofit units are suitable for commercial premises deployments One Coolnomix™ unit is required per cooling system thermostat Retrofitting is about one hour per system Coolnomix™ retrofit deployment is not intrusive to the system: the Coolnomix™ only displaces the thermostat function Coolnomix™ does not interfere with the system control functions
14
Business Proposition Current pricing policy is positioned to provide pay-back on investment within the first 12 months
15
Case Study: air-conditioning (1)
CHI Residences: boutique serviced apartments Trial performed June-July 2013 Daikin split-type air-conditioners 41.8% savings Production roll-out to 7 properties – 1,000 air-conditioners
16
Case Study: air-conditioning (2)
ASM Pacific Technology: provider of fabrication machinery to the chip industry Trial performed June-July 2013 Mitsubishi Package Air-conditioner Unit (30hp/22kW) 33.85% savings Production roll-out to all production facilities – 200 air-conditioners
17
Case Study: refrigeration
Shine and Shine: fresh fruit-juice manufacturer Trial performed June 2013 Custom-built walk-in refrigerator – 750 sq ft 24.5% savings see graphic on following slide Production roll-out to three walk-in refrigeration units
18
Case Study: refrigeration
19
Key Messages Coolnomix™ delivers genuine and significant energy/cost savings on your existing cooling systems Coolnomix™ improves temperature stability Pricing is positioned to achieve payback on investment within 12 months
21
Q & A
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.