1 Project planning The systems life cycle

2 Feasibility study Initial study
Looks to see if a new system can be built At reasonable cost In reasonable time

3 Feasibility study Fact finding finds out what people want from the new system by using: Questionnaires Interviews Observation Inspection of records

4 Analysis Identifies the problems to be solved
Looks in detail at the current system Understands the existing system

5 Design Designs the system in line with the user requirements
Chooses input, storage and output methods Decides on the processes Designs input/output screens and layouts spreadsheets, databases, etc. Designs validation tests Designs test plans

6 Implementation Produces a working solution according to the design
Produces framework for databases, spreadsheets, etc. Programmers produce the program code Uses software tools to produce a solution Produces the working system according to the design

7 Testing Test plan created during design stage is used to test the system Test data is entered Results are compared with what was expected Remedial action is taken to correct faults Validation tests are tested

8 Training and documentation
User training on how to use the new system Documentation to help the user is created

9 Evaluation and monitoring
Checking user requirements and performance criteria have been met Assessment of client/user satisfaction Setting up review cycle so new system is periodically reviewed

10 Maintenance Set up help-desk facilities
Add extra functions when required Improve performance Investigate system crashes to prevent them happening again

11 Project Management Some in charge of the project – Project Manager
Work divided among team members Appropriate task for their skills Conflicts sorted out Budget managed Reviewed regularly Work produced is fit for purpose and deadlines are met

12 ICT in projects Production of computer games Business Education
Cultural interaction

13 System investigation methods
Questionnaires Interviews Observation Inspection of records

14 System implementation strategies
Direct changeover Parallel changeover Phased changeover Pilot changeover


Download ppt "Project planning The systems life cycle."