Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015 School Bond Construction Program

Similar presentations


Presentation on theme: "2015 School Bond Construction Program"— Presentation transcript:

1 2015 School Bond Construction Program
Current District Managed Projects December 15, 2016 High School #3 Renovation Projects 136th Avenue has been paved Vikan – Design Development drawings are complete, Design Advisory Group selecting alternate design options if budget allows 2,100 linear feet of grade beam has been poured On-site utilities are complete Reunion Elementary BHS – Design Advisory Group continues to meet, Schematic Design will be completed by mid-January First lift of parking lot asphalt has been poured Exterior framing in two-story classroom wing (Area C) Northeast – General contractor has been selected, request for geotechnical services proposals will be solicited by end of month Setting door frames on first floor Area C Brighton Heritage Academy Phase 2 Design Development drawings will be complete by end of December OTMS – General contractor has been selected, Programming and Schematic Design drawings to be completed for OTMS and NE within next two months Pricing received for two mechanical options Deferred Maintenance Gym lighting upgrades – bids received, work to be scheduled Interim roof repairs complete, new roof bids received Project Overview Planning Design Construction Close Out Concept Schematic Design Design Development Construction Drawings ACTIVE PROJECTS HS#3 Site HS#3 Bldg ES#12 BHA Renovation Phase 2 (HVAC & Roof) Bromley East Expansion BHS Renovation/Expansion OTMS Renovation/Expansion Vikan Renovation/Expansion Northeast Renovation/Expansion Complete Safety & Security Upgrades Deferred Maintenance (District-Wide) Roof Replacements Gym Lighting Upgrades COMPLETED PROJECTS Brantner Expansion BHA Renovation Phase 1 (Windows & Abatement) Eagle Ridge Expansion Interoperable Radios Internet Bandwidth Expansion Masonry Waterproofing (North, Thimmig, Turnberry, Trans) Vikan Track Fill Fiber Optic Mapping Artificial Turf Fields (BHS, PVHS, South) BHS Track Re-Surface Sped Changing Rooms (North & Northeast) HVAC Controls Upgrades (Thimmig, Sec Ck) New Chiller at Southeast BHS Auditorium Cooling Modular Ramp Replacements (Pennock & Thimmig) South Stage Partition Replacement Asphalt Replacement (South playground, BHS Auto Shop) Concrete Replacements (Hend, North, South, BHS) Exterior Caulking (Henderson, South, SE) PVMS Shade Structure FUTURE PROJECTS Stuart Middle Modulars MS#5 (open 2020) ES#13 (open 2020)

2


Download ppt "2015 School Bond Construction Program"

Similar presentations


Ads by Google