Download presentation
Presentation is loading. Please wait.
Published byRebecca Dalton Modified over 10 years ago
1
STEINBUCH CENTRE FOR COMPUTING - SCC www.kit.edu KIT – University of the State of Baden-Württemberg and National Laboratory of the Helmholtz Association GridKa Tier1 Report Christopher Jung
2
INSTITUTS-, FAKULTÄTS-, ABTEILUNGSNAME (in der Masteransicht ändern) 217.05.2014Steinbuch Centre for Computing Dr. Christopher Jung – GridKa Cloud Meeting CPU usage For April 2010: atlas group #jobswalltime [h]CPU time [h] CPU time / walltime average wait time [h] prd542,5691,825,1891,380,9660.760.58 sgm2,559580510.090.06 plt319,701187,583144,2690.630.59 usr52,005157,001113,2860.727.34 d18,54117,1998,1740.480.30
3
INSTITUTS-, FAKULTÄTS-, ABTEILUNGSNAME (in der Masteransicht ändern) 317.05.2014Steinbuch Centre for Computing Dr. Christopher Jung – GridKa Cloud Meeting Space tokens As of 5th of May, 08:30: ATLAS space token size [GB]used [GB]free [GB]usage DATADISK600,000294,571305,42949.1% DATATAPE30,000250297500.8% GROUPDISK10,0008899120.9% HOTDISK1,00042857242.8% MCDISK600,000539,68060,32089.9% MCTAPE20,00016119,8390.8% SCRATCHDISK80,00058,46221,53873.1%
4
INSTITUTS-, FAKULTÄTS-, ABTEILUNGSNAME (in der Masteransicht ändern) 417.05.2014Steinbuch Centre for Computing Dr. Christopher Jung – GridKa Cloud Meeting PBS problems Started on 10 th of April PBS mom demon hanging on some WNs (could not access /proc) PBS server hangs, too Implemented a script that automatically reboots PBS when PBS server hangs Script to reboot WNs with kswapd having high CPU load -> did not work as reboot also needs to access /proc Reinstallation of all WNs with new kernel (with hard reboot if necessary) on 15 th and 16 th of April stable PBS since then Possible reasons: Massive NFS problems on 9 th of April (might have been caused by raising ATLAS job limit from 5,000 to 6,000 on 1 st of April) kswapd had high CPU load (kernel bug) causes /proc problems? (also observed by other sites) Additionally, we updated PBS to the latest version this Monday
5
INSTITUTS-, FAKULTÄTS-, ABTEILUNGSNAME (in der Masteransicht ändern) 517.05.2014Steinbuch Centre for Computing Dr. Christopher Jung – GridKa Cloud Meeting June milestone Major increase! Questions: When will disk be needed? All new storage for disk-only? April 2009June 2010 disk2,092 TB4,035 TB tape1,578 TB2,990 TB computing2843 kSI2k (=11372 HEPSPEC06) 4958 kSI2k (=19832 HEPSPEC06)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.