Download presentation
Presentation is loading. Please wait.
1
Capstone Project MIDAS PROJECT
2
Supervisor Project Members Teacher:Nguyễn Tất Trung
Teacher: Huỳnh Anh Dũng Trần Mạnh Thụy Lại Vũ Mão Nguyễn Ngọc Khanh Nguyễn Văn Hiển Trần Đình Đức Đỗ Xuân Bách
3
Table of content Introduction Project Management Requirements
Design and Implementation Testing Result and Future Demo and Q&A 1 2 3 4 5 6 7
4
1. Introduction Introduce CRM
5
1. Introduction Existing system
6
MIDAS 1. Introduction Idea Easy to use Portability
Analyst and Tracking Accessibility Save cost 1. Introduction Idea
7
2. Project management Project goal
Time Success Scope Cost Mucj tiêu cho project Time Scope Cost
8
2. Project management Process model
always have a running version of the program Difficult in specify all requirement Limit time and experience Save effort when requirement changed Neu li do chon model Iterative and incremental Neu loi ich cua viec dung model nay
9
2. Project management Project organization
Supervisor Teacher:Nguyen Tat Trung Teacher: Huynh Anh Dung Project Manager Trần Mạnh Thụy Project Manager Lại Vũ Mão Team Leader/Developer Trần Đình Đức Tester Đỗ Xuân Bách Developer Nguyễn Ngọc Khanh Tester Nguyễn Văn Hiển Team Leader/Developer
10
2. Project management Milestone
Jan Feb Mar Apr Intro R1 Project plan R2 Requirement R3 Design R4 Để đạt được target về time thì define ra các milestones Coding Unit testing R5 Testing R6 User Manual
11
2. Project management Project Plan
12
2. Project management Time management
Weekly meeting Assign Task Personal working Individual Report
13
2. Project management Risk Management
14
3. Requirement Specification User requirement
Function Administrator User Guest View acticle O Profile View X Add – Edit – Delete Contact Create Form Mail Change Theme Change Article [1] X: has right [2] O: has NO right
15
3. Requirement Specification Functional requirement
Manage data (manual by particular record and automatic by excel) Insert Update Delete View
16
3. Requirement Specification NonFunctional requirement
Usability Reliability Availability Security Maintainability Portability Success Criteria
17
4. Design and Implementation System Overview
18
4. Design and Implementation Server App – Architecture
19
4. Design and Implementation Client App – Class diagram
20
4. Design and Implementation Client App – Class diagram
21
4. Design and Implementation Client App – Sequence Diagram
22
4. Design and Implementation Database
23
5. Testing Test strategy Test types: Functional testing
User interface testing Data Volume testing Installation testing
24
5. Testing Test stage Type of Tests Stage of Test Unit Integration
System Functional Tests x User Interface Tests Data Volume Tests
25
5. Testing Test schedule Test Schedule Start Date End Date
Unit Testing 01/03/2012 23/03/2012 Integration Testing 25/03/2012 30/03/2012 System Testing 01/04/2012 06/04/2012
26
5. Testing How to test
27
5. Testing Test report Severity Total Defect Open Defect Assigned
Corrected Accepted Total Open defects Fatal Serious Medium 8 Cosmetic 4 Total (Status) 12 Total (W.def) 28
28
6. Lesson learn Requirement specify Project management Team work
29
Demo & QA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.