Download presentation
Presentation is loading. Please wait.
1
Technical Meeting ESA/ESRIN, 2009-09-18
© EOX IT Services GmbH, 2009
2
Agenda Introduction of Participants Contract signing
Introducing Task 3 The Work Breakdown Structure Screening of the WPs (discuss approach/identify risks) WCS (issues related to ongoing definition at OGC) Questions: (JUB) WebMapViewer developemnts (GIM) Discuss possibility of reusing EO Profiles from WMS/CSW (GIM) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
3
Agenda Update on status of OWS-7 (JUB)
Discuss method for analysis of EO-Chain from Discovery to Delivery (GIM,JUB,EOX, other Tasks) Discuss what shall/will be presented at OGC Meeting in Darmstadt Preliminary overall planning and relationship with Task 3 PMP Issues identified at KickOff Organisational project arrangements © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
4
Introduction Introduction of Participants Contract signing
Introducing Task 3 © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
5
© EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
6
Screening of the WPs (discuss approach/identify risks)
Requirements Marine parameters (SPOT, EOX, JUB?) Radar: Use cases Radar (EOX) Get examples (ESA, DLR, ...) & Data formats (EOX) EO metadata (Spot) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
7
WCS (issues related to ongoing definition at OGC) Questions (JUB)
What is consolidated, What will change Information model compatibility with HMA one... Relationship with discovery Relationship with EO WMS WCPS and its relationship with WPS Task 3 and peer to peer - this was part of the SOW Relationship with VAROS activity (EOP-S) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
8
WebMapViewer developments (GIM)
what are the plans (e.g. GENESIS developments) which version will be used for WCS extension functionalities and look of the new WebMapViewer Discuss possibility of "exploiting" EO Profiles from WMS/CSW (GIM) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
9
Miscellaneous Update on status of OWS-7 (JUB)
Discuss method for analysis of EO-Chain from Discovery to Delivery (GIM,JUB,EOX, other Tasks) GML Structure to descibe linking between EO products (KO-MoMs A13) (i.e. ComposedOf, SubsetOf, LinkedWith) GIM to handle communication/ information between Task-1 and Task-3 ?? ( Defining and Handling of Metadata for Coverages, ...) Discuss what shall/will be presented at OGC Meeting in Darmstadt Preliminary overall planning and relationship with Task 3 PMP © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
10
Issues identified at KickOff
Colocation meeting schedule Roadmap for GML 3.3 WCS 2.0 will be based on GML GML 3.3 no issue ? Marine Parameters (MyOcean) - Planning for EMSA Meeting at Toulouse ? check ordering spec (OGC ), a number of use cases shall demonstrate how both specs work together (which is the 2nd, EOLI?) (KO-MoMs A17) Security issues (KO-MoMs A18-A21) ? © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
11
Organisational project arrangements
Source Code / Document repository and SVN Internal: Present SVN at EOX (--> for daily work, code & documents) use of SVN reduces -traffic and ensures that everybody is on the same update-level for every document External: Decide Sourceforge / Google-Code / ( for SW releases ) plus HMA-Wiki pages where relevant (released documents, etc) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
12
Organisational project arrangements
Agree on Software: Microsoft or OpenOffice Word / Writer Powerpoint / Impress Excel / Calc referred Teleconference Platform Skype PowWowNow others ?? © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
13
Organisational project arrangements
Source Code / Document repository and SVN Internal: Present SVN at EOX (--> for daily work, code & documents) use of SVN reduces -traffic and ensures that everybody is on the same update-level for every document External: Decide Sourceforge / Google-Code / ( for SW releases ) plus HMA-Wiki pages where relevant (released documents, etc) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
14
Roadmap Timeline Action Items (AI-List)
Deliverables at PR (~15. Jan.2010) Requirement Baseline (RB) Technical Specification (TS) Design Justification File (DJF) incl. Technical Notes (TN) Design Definition File (DDF) © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
15
Contacts EOX GIM JUB SPOT christian.schiller@eox.at
JUB SPOT © EOX IT Services GmbH, 2009 © EOX IT Services GmbH, 2009
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.