Presentation is loading. Please wait.

Presentation is loading. Please wait.

ELCITA UPDATE January 2017.

Similar presentations


Presentation on theme: "ELCITA UPDATE January 2017."— Presentation transcript:

1 ELCITA UPDATE January 2017

2 Smart City – Water Meter

3 Smart City – Camera Pole

4 Modification of Existing street light pole with LED lights, Splitters, Camera, Advertisement Board, etc

5 SUSTAINABILITY 300 KLD ELCITA STP We are treating 150KLD average

6 KSPCB workshop at Electronics city on Waste Management Rules 2016, 119 people attended the conference which was co-ordinated by ELCITA and Infosys

7 Installed a new conveyor system at SWM facility

8 Estate Management Footpath Restoration work executed along Infosys Avenue sponsored by Infosys. Expansion of BWSSB UG sump 1097KL Installation of 15HP Booster pumps for Bore well E – Toilets 16 e-toilets operational. 2 More E- Toilet Installation Work in Progress Estate survey Final Data check & Software Training work in Progress

9 Installation of 15HP Booster pumps for Borewell – Completed

10 Footpath Restoration work executed along Infosys Avenue sponsored by Infosys.

11 Improvement work– Completed
Bus & Autobay (Infosys Avenue) Curve Improvement (Lord Plaza)

12 Replacing existing chamber cover -RCC slab with Chequered Plate,
Footpath Work – Completed Replacing existing chamber cover -RCC slab with Chequered Plate, @ Tata Power

13 Footpath Works – Completed
Footpath works at HP Avenue Speed Hump Marking opp MSME

14 Footpath Works – Completed
Footpath works at Shanthipura Road Concrete Drain at Pumphouse

15 Misc Work – Completed Pavers Laying work @ SWM
E-Toilet installation work in progress Compound wall at Schneider

16 Footpath Works – Under Progress
Siemens Side, West Avenue-1 (Infosys Avenue) Tata Power Side, West Avenue-1 (Infosys Avenue)

17 Road Works – Under Progress
East Avenue-5 (SBI Road) West Avenue-1 (IIITB Side)

18 KSSIDC Complex Internal Road
Road Works – Under Progress KSSIDC Complex Internal Road

19 Culvert Works – Under Progress
Culvert Work along West Lane-1 (Goa Estate)  Culvert Work along West Avenue-7 (Wipro Neeladri) 

20 Drain Works – Under Progress
West Avenue-9 (Petrol Bunk Road) West Avenue-8 (Police Station Side)

21 Estate Management Contract Awarded
Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road

22 Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road, Electronics City (East Phase) Along Shanthipura road (East Phase) Erkadi System to Arvind Mills (West Phase) Construction of 500 KLD STP in KIADB Land, Electronics City East Phase.