1
Charlotte Region Fast Lanes Study
Presentation at 6th Annual Transportation Summit Charlotte Chamber December 18, 2008
2
AGENDA Managed Lanes: National and Charlotte Region Perspectives Review of Fast Lanes Study Background and Status Phase 1 Results & Phase 2 Status
3
Managed Lanes: National and Charlotte Region Perspectives
4
What Are Managed or Fast Lanes?
Dedicated lane system for one or more user groups Proactively managed to provide reliability and unimpeded travel during peak demand periods So that future operating capacity is preserved After Before Orange County, SR-91
5
Managed Lane Benefits System Benefits Greater throughput
Opens up mainline capacity Encourages transit & carpool use Preserves options in corridor Decreased fuel consumption Improved air quality Revenue generation Transit Lane, NJ Truck Lanes, NJ User Benefits Reliable travel time Reduced delay More Choices
6
Managed Lane Strategies
Eligibility/Occupancy Access Control Variable Pricing Active Traffic Management
7
Managing Throughput means more efficiency
LOS F=1400 vph/lane at 25 mph LOS C=1600 vph/lane at 60 mph
8
Types of HOV/ Managed Lane Designs
Not separated I-5, Portland Buffer separated I-405, Orange Co, CA Barrier separated US- 59, Houston Pylon separation, SR- 91, Orange Co. CA
9
What are HOT Lanes? Managed priced lanes giving preference to HOVs.
I-394 Minneapolis Managed priced lanes giving preference to HOVs. Highest HOVs are typically free. Offers unimpeded travel and reliability benefits during peak periods SR 91, Orange County
10
HOT Lane Tolling Applications
Cashless operation: most accepted means of implementing HOT Lanes Roadside or overhead radio frequency devices, interoperable throughout the East Coast
11
HOT Lane Tolling Applications
On-board vehicle identification units in passing vehicles Vehicle ID is combined with other real-time transaction data (current toll rate) and processed against toll account
12
HOT Lane Tolling Applications
Tolls could be determined by traffic conditions by time-of-day Tolls may change in real-time or according to a fixed schedule
13
Where Freeway HOV Lanes Are Located
This map shows where most HOV projects are currently located. High concentrations of these treatments exist in the most congested urban areas, primarily on the East and West coasts. Only six projects have been terminated for a number of reasons since The projects in red represent project terminations. The projects in orange are the first value pricing demonstrations to be tested on HOV lanes.
14
Where HOT Lanes Are Located/Being Planned
HOV lanes HOT lanes Proposed This map shows where most HOV projects are currently located. High concentrations of these treatments exist in the most congested urban areas, primarily on the East and West coasts. Only six projects have been terminated for a number of reasons since The projects in red represent project terminations. The projects in orange are the first value pricing demonstrations to be tested on HOV lanes.
15
Where Truck Lanes Are Located/Proposed
HOV lanes HOT lanes Truck lanes Proposed Proposed This map shows where most HOV projects are currently located. High concentrations of these treatments exist in the most congested urban areas, primarily on the East and West coasts. Only six projects have been terminated for a number of reasons since The projects in red represent project terminations. The projects in orange are the first value pricing demonstrations to be tested on HOV lanes.
16
Where Other Types Of Managed Lanes Are Proposed
HOV lanes HOT lanes Truck lanes Toll/express Multiple lanes and concepts Proposed Proposed This map shows where most HOV projects are currently located. High concentrations of these treatments exist in the most congested urban areas, primarily on the East and West coasts. Only six projects have been terminated for a number of reasons since The projects in red represent project terminations. The projects in orange are the first value pricing demonstrations to be tested on HOV lanes.
17
Lessons Learned Be realistic with expectations Don’t take anything away that will be missed Toll demand on managed lanes is highly discretionary Capital cost recovery through tolling typically requires more than one lane and restricting free use Agency partnering is critical
18
Existing I-77 HOV Lanes, Charlotte
State’s first HOV Facility and only HOV lanes in the Carolinas, opened in 2004 Restricted to vehicles with 2+ occupants, buses & motorcycles at all times (24/7) HOV lane carries 1000 persons in peak direction in AM peak hour in 300 vehicles Average general purpose lane carries 1700 persons in 1600 vehicles during same period
19
Existing I-77 HOV Lanes, Charlotte
Access Prohibited Double white solid lines Continuous Access Wide single white skip line
20
Review of Fast Lanes Study: Background and Status
21
Study Background Began in June 2007
Co-managed by N.C. Department of Transportation and City of Charlotte Analyzing 12 corridors in nine-county region for managed lanes feasibility Organizations throughout the region are helping to fund the study
22
Study Corridors (340 Miles)
23
Study Partners Cabarrus-Rowan MPO Gaston Urban Area MPO
Lake Norman Rural Planning Organization Mecklenburg-Union MPO North Carolina Department of Transportation Rock Hill-Fort Mill Area Transportation Study Rocky River Rural Planning Organization South Carolina Department of Transportation Town of Mooresville
24
Why Consider Fast Lanes in This Region?
Travel demand is growing faster than population Rush-hour congestion is expanding into more hours Travel patterns are diverse Travel distances are increasing $65 billion gap between projected needs and future revenues in North Carolina alone to the year 2030 $41 billion gap identified in South Carolina in 2005
25
Feasibility Study Purpose
Are there any potential corridors where HOV, HOT or Truck-Only Toll (TOT) Lanes are viable Where and how these facilities might be connected to form a regional Fast Lanes system
26
Fast Lanes Study: Review of Phase 1 Results And Phase 2 Status
27
Two-Phase Study Process
Phase 1 screening designed to quickly identify most promising corridors Phase 2 involves detailed evaluation of most promising roadways
28
Phase 1 Screening Criteria
Presence of Congestion HOV Demand HOT/TOT Demand Physical Attributes
29
Phase 1 Screening Results
About 167 miles (49%) advanced to Phase 2 HOV and HOT options appear most feasible Primary corridors moving to second phase: I-85 North and South I-77 North and South US-74 East I-485 South, West & Northeast NC-16 West
30
Phase 1 Screening Results
31
Phase 2 Answers… Type of lane treatment Type of operation strategy
HOV and HOT policy Truck potential Revenue potential (based on toll optimization model and different pricing strategies) Access Connectivity Packaging/Phasing
32
Study Schedule
33
I-77 North Feasibility Studies
Address congestion along I-77 North in short and long-term periods Financed with Federal and State funds Analysis of HOV lane extension to Exit 30 in Davidson Assessment of converting HOV lanes to HOT facility Feasibility of operating traffic on shoulders until freeway is widened Studies begin in January 2009