Presentation is loading. Please wait.

Presentation is loading. Please wait.

John Dorney Process Manager

Similar presentations


Presentation on theme: "John Dorney Process Manager"— Presentation transcript:

0 Metro North Railroad 2017 C3RS User Group Meeting
Mechanical PRT Group Cambridge, Massachusetts Metro North Railroad

1 John Dorney Process Manager
Mechanical PRT Group John Dorney Process Manager Our group represents about 1700 M Of E Employees Metro North Railroad

2 CR3S PRT Group includes the following Unions
Unions Participating ARASA/TCU/IAM IAMAW (locals 226,753,1112) IBEW – System Council Number 7 IBEW – Local 1573 NCFO SMART-SM TWU ACRE – Signalman Division Local 166 ACRE – Power Directors Local 37 IBT Metro North Railroad

3 C3RS Implementation : M of E signed the IMOU on January 19, 2016
Management and union reps met with the FRA on March 1st, 2nd, and 3rd for PRT training The week of April 11th 2016, C3RS was rolled out to participating members The “Go Live” date was April 18th, 2016 Metro North Railroad

4 Benefits of C3RS Complements MNR existing programs – IR1/IR2 process
Builds a positive safety culture – Operation Deep Dive identified a poor safety culture at MNR Proactive (early warning system) Focuses on problems, not people Provides incentive for learning from error Targets the root cause, not the symptom(why are things the way they are) Metro North Railroad

5 M of E Corrective Actions Implemented: 2
Cases to Date: M of E: 35 M of E Cases Worked:25 M of E Corrective Actions Implemented: 2 Several Corrective Actions in Development Metro North Railroad

6 M of E Experience So Far:
There have been some near misses reported The Majority of the cases that have been submitted Included the employee identifying a cause or causes of the cases when filed with NASA. Employee failed to follow operating procedures. Taking shortcuts Real-time observations Situation Awareness reminders discussed during JSBs and Safety Focus days We have had some safety concerns on general work practices. Responding to those conditions we enlisted the safety department to conduct a JOB SAFETY ANALYSIS on the task. Metro North Railroad

7 There has been collaboration with our Transportation counterparts, which has been very helpful
We plan on continuing meeting with our counterparts for any shared cases The M of E team is enthusiastic and meets monthly based on our current caseloads Metro North Railroad

8 M of E Corrective Actions Implemented:
Placement of mirrors in yards with blind spots making train traffic difficult to see at road crossing This structure creates a blind spot when attempting to cross Metro North Railroad

9 M of E Corrective Actions Implemented:
Addition of the mirror allows fork truck operators and other employees to see oncoming train traffic heading towards the roadway New Mirror installed Metro North Railroad

10 M of E Corrective Actions Implemented:
The PRT Group is watching this area since it is under construction to make any correction if needed. Metro North Railroad

11 Questions? Metro North Railroad


Download ppt "John Dorney Process Manager"

Similar presentations


Ads by Google