Beyond the Business Case: AMR Operational Experiences and Benefits
Beyond the Business Case: AMR Operational Experiences and Benefits Michael S Godorov Mgr. - AMR Operations PPL Electric Utilities
2
Project Overview Project goal: reduce costs, improve service, position for the future Meters: 1.3 million single phase and 3 phase Uses: billing, call center, special reads, etc. Secure hourly interval, daily demand data for 100% of the customers Roles: PPL: customer, field installation, IT integration PLC Vendor: 1.3 million 1 and 3 phase meters Wireless vendor: 6,000 highest revenue custs.
3
AMR PLC System SCE APP RCE Communications/ Application Servers CSS
Meter Retrofitted with Module CSS Client Workstations (PC) SCADA, Energy Management, Outage Management Systems and/or Other Platforms Communications/ Application Servers Distribution Substation Telecommunications Link Power Lines Substation Control Equipment Service To Home PPL Net SCE APP RCE
4
Operational Experiences
Billing Reads reduced estimate bills: 99.6% read success reduced calls to call center reduced billing memos Special Reads used to final bill customers and supply initial read for new customer avoids trip to the field
5
Operational Experiences
View readings on line employee access to data to satisfy customer inquiry, billing transactions employee access to satisfy Avoided trip to the field - ‘check read’ reduced call time to justify usage Demand overload employees work reports that display meters with demands that exceed maximum KW rating for the meter added benefit as a result of implementing AMR
6
Operational Experiences
Failed Meter/Module Analysis Tool implemented an automated process to remedy failed meter issues field order issued to exchange meter or improve the service conditions to enable communication. Metering integrity complete installation checks remotely analyze phase angle issues, bad CTs/VTs issue order to field automatically
7
Operational Experiences
Reliability Outage verification application of PLC application hierarchical view of feeders, devices from a substation Enables circuit monitoring use of blink count data identify potential neutral and phase issues on circuit
8
Day 2 Items Logical connect/disconnects on weekends
Enable customers to select billing date Optimize cash flow Block meters remotely Consumption Monitoring
9
Day 2 Items Import data to meter data management system
reduce distribution capital & operating expenditures enhance revenue protection efforts improve cash flow & reduce costs with the Large Power billing process enable view of customer data on-line improve accuracy of revenue forecasts
10
Conclusion We are meeting the requirements of the business case
Improved our credibility with customers Overall, we are a better company with this solution For more information contact: Mike Godorov at PPL: