1 OpenCluster Planning Sverre Jarp IT Division CERN October 2002

2 Phase 1 Local Cluster 32 nodes + development nodes
Rack-mounted DP Itanium-2 systems RedHat 7.3 Advanced Server OpenAFS, LSF GNU, Intel Compilers (ORC?) Database software (Oracle?) CERN Applications Porting, Benchmarking, Performance improvements CLHEP, GEANT4, ROOT, Anaphe, (CERNLIB?) Cluster benchmarks 1  10 Gigabit interfaces Estimated time scale: 6 months Prerequisite: 1 system administrator October 2002

3 Phase 2 European Data Grid Integrate OpenCluster into EDG
Porting, Verification Relevant software packages Hundreds of rpm’s Interoperability with existing EDG nodes Integration into existing security GRID benchmarks Do they exist? Estimated time scale: 9 months Prerequisite: 1 system programmer October 2002

4 Phase 3 LHC Computing Grid Need to understand Possibly more porting
Hardware architectural directions Software architectural choices Possibly more porting Estimated time scale: nn months Prerequisite: nn system programmer October 2002