February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince.

Similar presentations


Presentation on theme: "February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince."— Presentation transcript:

1 February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince

2 ME 4973 Syllabus

3 Important Dates May 1, 2015 78 days Monday 2/9 Critical Design Review - print a copy – 33% compliant! Wednesday 2/11 Paragraph and graphics Your Team # in the title 2014 Brochure on ME Department Web Page

4 Brochure Status Photos done Paragraphs – email to me
Retake if member missing including faculty advisor Paragraphs – to me Word doc(x) with Jpeg Photos CAD model Analysis Results Test set up /Machining/Building

5 Oral 3 Format Title Slide – 1 slide name, teams faculty sponsor, logos
2. Problem Statement – what are you being asked to do/deliver Define the project – 1 slide 3. Analysis Results to date – 3-4 slides A. CAD Models (by itself is not enough) B. Analyses Results (Ansys or other) meshes (critical locations) boundary conditions pictures, models and results (graphs/figures) C. FBDs, hand calculations - Results D. Comparison to test data

6 Oral 3 Format including initial testing to help with final rig design
4. Test rig or experiment – 2 -3 slides A. design/schematic – how does this address the problem sizing of components – power required, sizing…. B. Models/CAD drawings, pictures, videos…. C. Instrumentation – what is being measured, what is range and accuracy required D. Your test Matrix (DOE if applicable) – range of variables be tested E. Test results to date – comparison with analytical predictions including initial testing to help with final rig design

7 Results Example – Team 25

8 Oral 3 Format Project Schedule –now to completion
6. Your risk analysis – mitigation for highest risks

9 Peer Assessment – Last Slide
7. Peer Assessment - clicker Team is executing to plan (schedule Presented results look encouraging High probability they will meet the project objectives B. Team is having some problems in executing ,but They know the issues and have a plan to recover. Moderate probability they will meet project objectives. C. Team is having serious problems in executing. No plan to recover Low probability they will meet project objectives

10 For the Oral Report Presentation on a flash drive/other
ONE hard color copy of presentation (Stapled) Into team folder

11 Remember Effort is necessary BUT You are judged on results