1 Board Meeting September 25, 2017

2 The VISION of the Vigo County School Corporation is to ensure that our three comprehensive high schools meet the needs of students and staff of today and into the future

3 CURRENT FACILITY FINDINGS
Challenged to support 21st Century Educational Programs and Curriculum Delivery Inadequate Capacity Over Utilization limiting flexibility Below Benchmarks for other similar Indiana HS Facilities Overall Condition is unsatisfactory

4 Most high-performing Indiana high schools undergo:
RECOMMENDATIONS Most high-performing Indiana high schools undergo: Major remodeling at 15-year intervals Major renovations at 25 to 30-year intervals Study Findings demonstrate the need for significant improvements at the three high schools and West Vigo MS

5 ADDITIONS/RENOVATIONS CONCEPT 1

6 RECONSTRUCTION CONCEPT 2

7 NEW CONSTRUCTION CONCEPT 3

8 ADDITIONS/RENOVATIONS CONCEPT 1

9 RECONSTRUCTION CONCEPT 2

10 NEW CONSTRUCTION OPTION 3

11 ADDITIONS/RENOVATIONS CONCEPT

12 RECONSTRUCTION CONCEPT

13 NEW CONSTRUCTION OPTION 3

14 Add a fourth new East HS with 1200 student capacity on the east side
NEW TERRE HAUTE EAST VIGO HS CONCEPT 4 Add a fourth new East HS with 1200 student capacity on the east side Build new, smaller North HS and South HS, each sized to serve 1200 students Build a new West HS/MS similar to Concept 3

15 North and South will be decommissioned, disposition to be determined
NEW TERRE HAUTE EAST VIGO HS CONCEPT 5 Replace North HS and South HS with one new East HS on a new campus to serve 3600 students North and South will be decommissioned, disposition to be determined Build a new West HS/MS similar to Concept 3

16 CONCEPT COMPARISON X X Concept 1 Concept 2 Concept 3 Concept 4
Concept 1 Concept 2 Concept 3 Concept 4 Concept 5 ADDITIONS AND RENOVATIONS Terre Haute South Vigo HS X Terre Haute North Vigo HS West Vigo HS RECONSTRUCTION West Vigo HS/MS NEW CONSTRUCTION  X New (small) East Vigo HS (1,200) New (large) East Vigo HS (3,600)

17 Qualities that will be improved with each concept:
CONCEPT COMPARISON Safety and security Environmental comfort Flexible learning spaces Access to technology Lower energy costs Qualities that will be improved with each concept:

18 Qualities that may vary in the level of success, dependent on concept:
CONCEPT COMPARISON Qualities that may vary in the level of success, dependent on concept: Responsiveness to 21 Century Education Overall site circulation and management Program disruption during construction Construction schedule duration

19 The total cost picture must include:
CONCEPT COMPARISON The total cost picture must include: Construction Costs Attendant soft costs including fees, permits, and land purchases Tax implications including circuit breakers and financing terms Operational costs including energy, staffing, and transportation

20 Simultaneous Construction 2020-2023 Anticipate:
SCHEDULE ASSUMPTIONS Approval in 2018 Design/bidding in 2019 Simultaneous Construction Anticipate: Interim phases may be completed throughout the entire schedule All work completed by summer 2023

21 CONCEPT COMPARISON by COST
Concept 1 Concept 2 Concept 3 Concept 4 Concept 5 ADDITIONS AND RENOVATIONS Terre Haute South Vigo HS $ 57 M Terre Haute North Vigo HS West Vigo HS $ 39 M RECONSTRUCTION $ 84 M West Vigo HS/MS $ 48 M NEW CONSTRUCTION $ 99 M $ 74 M $ 74M $ 66 M New (small) East Vigo HS (1,200) New (large) East Vigo HS (3,600) $ 186 M Construction Costs $ 153 M $ 216 M $ 264 M $ 298 M $ 252 M Fees/Permits/Contingencies $ M $ M $ M $ M $ M Project Costs $ 191 M $ 270 M $ 330 M $ 372 M $ 315 M

22 Board Meeting September 25, 2017


Download ppt "Board Meeting September 25, 2017."