Download presentation
Presentation is loading. Please wait.
Published byAlexina Rodgers Modified over 6 years ago
1
Hesperian Boulevard Corridor Improvement Project San Lorenzo
PROJECT OVERVIEW The Hesperian Boulevard Corridor Improvement Project, located in the heart of the San Lorenzo community, will enhance traffic safety and further establish a livable community with benefits to motorists, pedestrians, bicyclists, and the San Lorenzo commercial corridor. Additionally, this project will beautify and revitalize the Hesperian Corridor into an inviting streetscape between the I-880 overcrossing and A Street. San Lorenzo Gateway COMPLETED Public Meetings and Community Consensus Fall 2016/Winter 2017 Final Design Spring/Summer 2017 Begin Construction Schedule subject to change PROJECT FEATURES PROJECT COSTS AND FUNDING Estimated Construction Costs: $22,000,000 Funding provided by local road funds, ROPS funds, Measure B-BB, and Rule 20A funds Wider, decorative sidewalks and pedestrian lighting Class II bicycle lanes Landscaping and street trees within redesigned areas San Lorenzo Gateway features Intersection improvements including upgraded traffic signals, highlighted crosswalks, pedestrian ramps and bulb outs Utility undergrounding Installation of telecommunications conduits Resurfacing of roadway pavement Public transit enhancements including bus shelters and transit priority systems Environmentally sustainability features including LED streetlights, recycled materials, and drought tolerant landscaping San Lorenzo I-880 Hesperian Blvd. HOW TO REACH US A Street Call: (510) Website: PROJECT LIMITS: Hesperian Boulevard between I-880 overcrossing and A Street ALAMEDA COUNTY PUBLIC WORKS AGENCY | |399 ELMHURST STREET, HAYWARD, CA | (510)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.