Presentation is loading. Please wait.

Presentation is loading. Please wait.

Read-out set-up and test results

Similar presentations


Presentation on theme: "Read-out set-up and test results"— Presentation transcript:

1 Read-out set-up and test results
P. Salabura on behalf of Kraków crew

2 Read-out scheme Prototype I (july 2011) in tests TRB v2 128 channels
HPTDC Evaluation board

3 ASIC interface ASIC setting for in-beam and radioactive
source tests in 2012/2013 selected: rising time ~40 ns,pulse duration ~ 150 ns stable operation with tubes (no oscilations) Installed in Kraków, Juelich Installed also at GSI with HADES MDC- comparison to AD8 – on going Fe signal

4 Examples of signal: Fe-source
Preamp- saturation Typical signal Asic setting: reduce Pramp gain (1.) to eliminate preamp-saturation

5 Event Display (new-since 2 weeks)

6 Plateau measurements ‘ 2013
Kraków straws January 2013

7 TOT vs charge characteristics: Fe source
Q/Q~11% Q/Q~9% Total charge ~ few percent resolution below 1875 V: for higher HV resolution degradation due to Preamp saturation TOT vs charge dependence : typical shape for quasi-Gaussian pulses

8 TOT vs Tdrift -0.9 GeV protons
September’ 2012 Juelich Simulation: Garfield + FEE transfer 1 GeV/c miuons 130 ns TOT [ns] Tdrift [ns] as expected besides second leg structure in TDrift>130 ns !!! ? pile-up due to micro bunch structure of the beam? – I doubt it – see next slides secondary emission from tube walls? electronic effects : cross talk (we could not find evidence for that)

9 TOT vs Tdrift vs HV (900 MeV/c protons)
1700 V V V T~130 ns time direction reversed separation between 2 structures increases with HV

10 Sr90 vs in- beam measurement
same set-ups : 2 rows of straws aligned w.r.t beam Trigger : and between 2 scint. (in Krakow we use similar straws)

11 Spectra from one straw Juelich: p 900 MeV HV=1800 V
Kraków: Sr90 HV=1800 V Tot [ns] Tdrift [ns] Tdrift [ns] several (>8) straws fired At least 5 straws fired + 2 scintil. similar second leg structure visible in sr90 case Sr90: can not be due to pile-up

12 Spectra from one straw when 2’d fired
Juelich: p 900 MeV second straw in the same row Kraków: sr90 second straw in the same row second straw in the row below second straw in the row below

13 Correlation plots Juelich: p 900 MeV second straw in the row below
Tdrift j+1 Kraków: Sr90 second straw in the row below Tdrift j j j+2 j+1

14 Further source tests are needed to understand origing of delayed signals in straw
(Gas, mixtures, HV dependence, ASIC settings?) will be continued in Kraków Test at GSI with MDC . FEE + TRB installed . ASIC adopted to MDC signals (faster rising and larger gain) TOT / Charge / position resolution from in-beam data– see Jacek talk


Download ppt "Read-out set-up and test results"

Similar presentations


Ads by Google