Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preparing and Managing Internal Verification

Similar presentations


Presentation on theme: "Preparing and Managing Internal Verification"— Presentation transcript:

1 Preparing and Managing Internal Verification
BTEC Staff Development Internal verification 09/05/2018 "Achieving excellence in all we do" Preparing and Managing Internal Verification Dr. Charles Dublon . Quality Nominee © Dr. Charles Dublon

2 Preparing and managing the IV process
Objectives: By the end of this session you will be more familiar with : The concept of what Internal Verification is What it achieves The Principal subject areas The Role of the lead Internal Verifier Coleg Powys’s time frame /What we are doing.

3 BTEC Staff Development Internal verification
09/05/2018 Importance of Internal Verification Internal verification is an established process and is not changing is essential to meet national standards. The assessment of learner work is assured by internal verification at Coleg Powys Successful IV will enable CP to certify learners work and allow Edexcel to accredit them. © Dr. Charles Dublon

4 14 Principal Subject areas

5 BTEC Staff Development Internal verification
09/05/2018 The lead internal verifier will: Oversee the internal verification and standardisation of learner work for a Principal Subject Area (PSA) Undertake online induction training Cascade information to subject team members Register for on line standardisation (OSCA2) Select OSCA2 window Centres will need to have lead internal verifiers for each PSA and may need support in understanding which programmes are in the different PSAs Go through specific handout listing all Principal Subject Areas in pack. Answer any relevant questions as this is assimilated and discussed. Induction will be mainly on line except less experienced centres will be invited to face to face events. Summary on next slide. Further details to follow. It will be important for lead IVs to cascade information from induction training and standardise subject team. Lead IVs can register for OSCA2 screens any time following approval of qualifications (auto programme numbers end April for equivalent quals – new approval for any new quals being delivered) but can only access training exs and assessments following registration of learners Details for registering on OSCA2 and accessing exercises on presentation slides handout in pack. Lead IVs will need to decide which OSCA2 window to use to complete on line assessments. Our advice would be to attempt as early as possible. Only one window can be attempted and if unsuccessful then standards verification takes place. SV sampling will need to be achieved to gain accreditation. More details later. It will be good practice to complete the training exercise(s) before attempting the actual assessment, and the training ex can be used for standardising team members. © Dr. Charles Dublon

6 BTEC Staff Development Internal verification
09/05/2018 The lead internal verifier will Complete training exercise(s) Use exercises for standardisation of team members Complete formal assessment given by Edexcel Internally sample learner’s work. It will be good practice to complete the training exercise(s) before attempting the actual assessment, and the training ex can be used for standardising team members. Formal assessment follows – later screens will show format of materials included for the on line assessment Random standards verification sampling can take place any time during accreditation and centres need to be ready if this is requested. The lead internal verifier does NOT have to carry out all IV. IV sampling will depend on the number of programmes delivered within the PSA. It is expected that rigorous internal verification practice is implemented by all staff. © Dr. Charles Dublon

7 External Quality Assurance II: verification of assessed learner work
BTEC Staff Development Internal verification 09/05/2018 External Quality Assurance II: verification of assessed learner work Accreditation Windows Window Lead IV Induction Preparation & Practice** Live Standardisation Notification of results Allocation SV (if required) One 04/10 to 07/11 25/10 to 12/11 15/11 to 03/12 06/12 to 10/12 13/12 to 17/12 Two 08/11 to 12/12 20/12 to 07/01* 10/01 to 28/01 01/02 to 05/02 07/02 to 11/02 Three 18/02 28/02 to 11/03 14/03 to 18/03 21/03 to 25/03 *not available 27 and 28/12 ** the practice window will remain open from 25/10/10 to 25/03/11 © Dr. Charles Dublon

8 Accreditation coverage
BTEC Staff Development Internal verification 09/05/2018 Accreditation coverage Accreditation Level 3 Level 2 Lead IVs will carry out standardisation at the highest level delivered within the PSA and, if successful, will accredit certification for all levels. At the moment there are plans for two exercises at each level on completed units. Personal & Social Development/Vocational Studies only exists at FL. Foundation Learning Levels delivered by centre © Dr. Charles Dublon

9 Online Standardisation of Centre Assessors (OSCA2)
BTEC Staff Development Internal verification 09/05/2018 Online Standardisation of Centre Assessors (OSCA2) Stages for each Lead IV to achieve accreditation Induction Cascade information to PSA IVs and Assessors Register for Online Standardisation Work through practice exercises Successful results release PSA programmes-all levels Summary of process Suggest give reminder of Accreditation given to lead IV and outcome if leaves. The current year accredited would allow certification in the PSA provided of course QRD released; the responsibilities of the lead IV would need to be given to another member of team and OSCA2 will need to be taken in the following year. The accreditation would then start again – current year + 3 years Complete standardisation at highest level delivered in PSA Unsuccessful results lead to Standards Verification Accreditation is owned by the Lead IV and given for current year + three years: annual registration will be required © Dr. Charles Dublon

10 Standards Verification
BTEC Staff Development Internal verification 09/05/2018 Standards Verification Where Lead IV standardisation is unsuccessful: 1st Sample by Standards Verifier Release Lead IV accredited for current year + 3 Block 2nd Sample required 2nd Sample by Standards Verifier Release certification for current year The diagram illustrates how the sampling process works: The Standards Verifier negotiates a sample with the centre. If assessment is judged to be accurate, then certification is released and the Lead IV is accredited for the full period. If assessment is inaccurate, the Standards Verifier will block certification and negotiate a re-sample. If the resample is judged to be accurately assessed, certification will be released for the current year. Lead IV standardisation will be required in the following year. If the resample is blocked, the relevant Regional Quality Manager intervenes, meeting with the centre staff and agreeing remedial action. Once the remedial action is completed satisfactorily, the Regional Quality Manager can release certification for the current year. Lead IV standardisation will be required in the following year. If a centre does not attempt or complete the Lead IV standardisation, Standards Verification can only release the current year, and Lead IV standardisation will be required in the following year. Block Remedial action required RQM support to release certification for current year Where Lead IV standardisation is not completed, certification can only be released for current year © Dr. Charles Dublon

11 BTEC Staff Development Internal verification
09/05/2018 Maintaining internal verification standards Coleg Powys is in the process of: identifying lead internal verifiers for each PSA. ensuring lead IVs book onto induction. organising registration of lead IVs onto OSCA2. monitoring when lead IVs commit to specific OSCA2 windows. recording results of on line assessments. ensuring teams are prepared to meet random sampling standards verification. ensuring teams are prepared to meet standards verification requirements if on line assessment is unsuccessful. Also acts as a summary to section © Dr. Charles Dublon

12 BTEC Staff Development Internal verification
09/05/2018 Maintaining internal verification standards Coleg Powys has a plan to: ensure an effective IV system is adopted across all PSAs. maintain an auditable recorded IV system. ensure all assessors/internal verifiers are trained, supported, standardised and follow an effective and consistent IV system. implement an appropriate IV monitoring process? overall ensure IV systems and procedures are rigorous. Also acts as a summary to section © Dr. Charles Dublon


Download ppt "Preparing and Managing Internal Verification"

Similar presentations


Ads by Google