AMI Enterprise Task Force of the Utility AMI Working Group

Similar presentations


Presentation on theme: "AMI Enterprise Task Force of the Utility AMI Working Group"— Presentation transcript:

1 AMI Enterprise Task Force of the Utility AMI Working Group
SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou

2 SRS Team Status SRS team status since the Knoxville meeting:
Developed first complete draft of the Logical Components and Functions Model Supported AMI-ENT service definition team activities including the CMS-AEP collaboration meeting Started to develop the first draft of the SRS document Guiding Principles Reference Architecture Requirements Goal is to make the first draft available for reviews by the March meeting.

3 AMI-ENT SRS Table of Content
1. Introduction 1.1 Purpose 1.2 Scope 1.3 Acronyms and Abbreviations 1.4 External Considerations and References 1.5 Document Overview 2. Overall Description 2.1 Architecture Guiding Principles 2.2 Architectural Considerations 3. AMI-ENT Reference Architecture 3.1 AMI-ENT Reference Model 3.2 AMI-ENT Logical Architecture 4. AMI-ENT System Requirements 4.1 Requirements Framework 4.2 Systems Requirements Specification 4·2.1 Functional Requirements 4·2.2 Technical Requirements 5. Appendices 5.1 Terms and Definitions

4 What is AMI-ENT Others??? Reference: Rendered from AMI System Security Requirements v0_93 Figure 5: Scope of AMI Systems

5 AMI-ENT Logical Components
AMI-ENT SRS seeks to define a complete reference model that includes all logical functional components within and outside utility enterprise that are needed to deliver the AMI specific business functions. AMI Head-End AMI Meter Asset Maintenance AMI Network Asset Maintenance AMI Network Management AMI Service Manager C&I Customer Demand Resource Management Customer Information Analysis Customer Information Management Customer Presentment & Analysis (C&I) Customer Presentment & Analysis (Residential) Customer Relationship Management Distribution Engineering Analysis Distribution Management Distribution Operational Analysis Demand Response Management Distribution SCADA Enterprise Asset Management Energy Management Enterprise Service Bus Geographic Information Management HAN Management Meter Data Management Mobile Data Terminal Mobile Workforce Management Outage Management Power Market Management (ISO) Power Trading (MP) Revenue Protection Supply Chain Management Transformer Load Management Third Party Portal (AMI) Work Management Work Scheduling Gas related components?

6 Why the AMI-ENT Reference Model
Because the current IEC reference model is limited to only basic metering related functions. Because the future use case analysis and the services being defined needed a stable reference model to be more consistent and reusable across implementations. Because it could serve as the vehicle to manage the scope and priorities of use case and services to be delivered. Because it could provide best practice architecture recommendations for those implementations that may want to leverage outcomes AMI-ENT effort.